| 1 | L1₹61.9 LAccepted-AOC C M COIMBATORE 18 | COIMBATORE | TAMIL NADU | 638459 | ₹61.9 L Quoted ₹62.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹64.9 LRejected-Finance COIMBATORE | ₹64.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | gudalur hightech builders p ltd L1 | Murali and Co L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Kurunjinagar -Chinaanapallam-Kavayal Road R-423 KM 0/0-1/0 H/o Cherangode at Gudalur Block in The Nilgiris | |||||
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,000 | Sqm | 32.7 ₹32,700 | 34.33 ₹34,330 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B | 90 | Cum | 184.6 ₹16,614 | 193.83 ₹17,444.70 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 450 | Cum | 4,774.5 ₹21.5 L | 5,013.22 ₹22.6 L |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,000 | Sqm | 106.5 ₹3.2 L | 111.82 ₹3.4 L |
| 6.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 3,000 | Sqm | 22 ₹66,000 | 23.1 ₹69,300 |
| 7.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 90 | Cum | 14,525.6 ₹13.1 L | 15,251.88 ₹13.7 L |
| 8.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 100 | Cum | 363 ₹36,300 | 381.15 ₹38,115 |
| 9.00 | Provision for Kilo Metre Stone - Nos | 1 | Nos | 2,197 ₹2,197 | 2,306.85 ₹2,306.85 |
| 10.00 | Provision for Hecta Metre Stone - Nos | 4 | Nos | 574 ₹2,296 | 602.7 ₹2,410.80 |
Tender Value
₹65.2 L
EMD Value
₹66,000
Closing Date
20 Feb 2026, 10:00 amClosed
ADDL COLLECTOR DEV
DRDA THE NILGIRIS
Strengthening of Kurinjinagar Chinnanapallam Kavayal road Km 0 0 1 0 Ho Cherangode, Gudalur block
2026_RDTN_657890_1
NABARD 26-27 of Kurinjinagar Chinnanapallam Kavayal -P03
Open Tender
Civil Works - Roads
180 days
CHERANGODE PANCHAYAT OF GUDALUR BLOCK
as per tender document
3 documents required · 3 mandatory
₹0
₹66,000
Yes
13 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Strengthening of Kurunjinagar -Chinaanapallam-Kavayal Road R-423 KM 0/0-1/0 H/o Cherangode at Gudalur Block in The Nilgiris
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision for Kilo Metre Stone - Nos
Provision for Hecta Metre Stone - Nos
Provision for Sign board charges (60 Cm Circle)
V shape drain
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20A.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Pricebd1.pdf
Tender Documents • 0.71 MB
Techbid1.pdf
Additional Documents • 1.10 MB
BOQ_789180.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid