Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.0 LAccepted-AOC MUNICIPAL COMMITTEE DHARUHERA | BHIWANI | HARYANA | 127021 | ₹40.0 L | 1 | Accepted-AOC l-1 |
| 2 | 2₹46.0 LRejected-Finance HOUSE NO 350 NEAR VILLAGE POST OFFICE KAMASPUR SONIPAT 131021 | SONIPAT | SONIPAT | HARYANA | 131021 | ₹46.0 L | 2 | Rejected-Finance L-2 |
| 3 | 3₹48.9 LRejected-Finance WARD NO 7 SAMPLA ROAD DELHI ROAD KHARKHODA 131402 | SONIPAT | HARYANA | 131402 | ₹48.9 L | 3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | THE NEEMRIWALI CO-OP L and C SOCIETY LTD. L2 | The Shiv Shakti Cooperative L/C Society L3 | the jai shree shyam co-op l/C Society ltd sonipat L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, Erection,testing and commissioning of Puffin
18W White Round Bright LED Panel Light Ceiling
Downlight Lamp Kit with LED Driver Surface Mount
LED Ceiling Light (Pack of 1)(2 Year Warranty. complete in all respect as per satisfaction of engineer
in charge. Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves | 25 | Nos. | 650 ₹16,250 | 1,500 ₹37,500 | 1,000 ₹25,000 |
| 2.00 | Providing and fixing Self Priming Monoblock
Pump 1 HP make Crompton set complete work
given Head 6-45 meters, Discharge 57-13 LPM. complete in all respect as per satisfaction of
engineer in charge. | 1 | Nos. | 7,440 ₹7,440 | 11,000 ₹11,000 | 5,000 ₹5,000 |
| 3.00 | Boring of 150 mm dia nominal boreholes through all type of soil using
shell and agure or other approved equipment until N value is more then
100 (nrefusel) test including as per IS standards and as per IRC 78-2000. complete in all respect as per satisfaction of engineer in charge | 30 | Metre | 1,924 ₹57,720 | 5,000 ₹1.5 L | 1,500 ₹45,000 |
Tender Value
₹42.4 L
EMD Value
₹84,766
Closing Date
24 Mar 2026, 10:00 amClosed
Mandeep Singh
Municipal Corporation MANESAR
Construction of CFC center in village Naurangpur, Ward - 16, div-2 Manesar
2026_HRY_508354_1
202684F730C3 3384 453D 93E4 C7DDC89615A11809ULB
Open Tender
Civil Works
365 days
ward-16
2 documents required · 2 mandatory
₹5,000
₹84,766
Yes
27 Apr 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty. complete in all respect as per satisfaction of engineer in charge. Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves
Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM. complete in all respect as per satisfaction of engineer in charge.
Boring of 150 mm dia nominal boreholes through all type of soil using shell and agure or other approved equipment until N value is more then 100 (nrefusel) test including as per IS standards and as per IRC 78-2000. complete in all respect as per satisfaction of engineer in charge
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Construction of CFC center in village Naurangpur, Ward - 16 , div-2 Manesar
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_587124.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid