| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC 67 A | LALITPUR | UTTAR PRADESH | 284122 | ₹30.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹30.9 L+₹2,286.80 (0.07%)Rejected-Finance 532KH 558 MEHDI TOLA ALIGANJ LUCKNOW | ₹30.9 L+₹2,286.80 (0.07%) | L2 | Rejected-Finance Highest rate from L1 |
| 3 | L3₹31.4 L+₹47,078.20 (1.52%)Rejected-Finance 138 C NEW BERHANA ALLAHABAD U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹31.4 L+₹47,078.20 (1.52%) | L3 | Rejected-Finance Highest rate from L2 |
| 4 | L4₹32.6 L+₹1.7 L (5.65%)Rejected-Finance 116 1060 NAMAK FACTORY CHOURAHA GANESH NAGAR RAWTAPUR KANPUR NAGAR | ₹32.6 L+₹1.7 L (5.65%) | L4 | Rejected-Finance Highest rate from L3 |
| Sl No | Description | Qty | Unit | Pradeep Kumar Shukla L2 | M/S VINOD KUMAR L3 | UMA CONSTRUCTION L4 | Neeraj Kumar Pandey L1 |
|---|---|---|---|---|---|---|---|
| 1.00Execution of work | |||||||
| 1.01 | Provision for dismantling of Ruined/Crack C.R. Stone masonry in cement mortar on super structure. Including stacking of usefull material as C.R. Stone for reuse in masonry work which will be about 90% and disposal of refused out of monument upto lead 60 mt. including all the labour material and T&P required proper completion of work at the site. Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 40 | Cum | 2,553 ₹1,02,120 | 2,600 ₹1,04,000 | 2,800 ₹1,12,000 | 2,550 ₹1,02,000 Lowest |
| 1.02 | Provision for dismantling of flag stone flooring cement mortar including stacking of serviciable material for reuse in flooring work and disposal of refused upto lead 60 mt. including all the labour material and T&P required proper completion of work at the site. Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | 114 | Sqm | 278 ₹31,692 | 290 ₹33,060 | 330 ₹37,620 | 277 ₹31,578 Lowest |
| 1.03 | Provision for Coursed rubble masonry with hard stone (first or second sort) in super structure above plinth level and upto floor five level. including all the labour material and T&P required proper completion of work at the site. In cement mortar 1:6 (1 cement: 6 coarse sand) cum. | 55 | Cum | 11,175 ₹6,14,625 | 11,300 ₹6,21,500 | 11,500 ₹6,32,500 | 11,170 ₹6,14,350 Lowest |
| 1.04 | Provision for Coping with 50 mm thick sand stone on top of wall with 20 mm. thick bed of mortar of ratio 1:6 cement and c sand . Coping stone to be laid with fine dressing and making side end as semi circular shap (Bull nose type) etc complete including all the labour material and T&P required proper completion of work at the site. | 125 | Sqm | 2,227 ₹2,78,375 | 2,250 ₹2,81,250 | 2,330 ₹2,91,250 | 2,225 ₹2,78,125 Lowest |
| 1.05 | Supply and fixing of MS grill railing/fencing on the boundary wall for safety and security of the site with MS angle 40x40x5mm vertical post and same size angle horizontal support of top and bottom for adjoining the frame 12mm dia bar with arrow headed on top and placed vertically at a distance of 10 cm c/c and 40x5 mm flat iron Both grill railing panel fixed together by nut bolt etc complete as per design/drawing attached. Department including all the labour, material & fabrication fixing etc with all completion. (Grill Panel size 2.00 x 0.90 mtr). | 201.2 | Rmt | 4,262 ₹8,57,514.4 | 4,300 ₹8,65,160 | 4,400 ₹8,85,280 | 4,260 ₹8,57,112 Lowest |
| 1.06 | Provision for flush/ruled pointing on stone work with cement mortar of ratio 1:3 cement and course sand. After carefully racking of masonry joints and washing of surface. Including all the labour, supply of material and T&P. Required proper completion of work at the site. | 600 | Sqm | 401 ₹2,40,600 | 425 ₹2,55,000 | 500 ₹3,00,000 | 400 ₹2,40,000 Lowest |
| 1.07 | Provision for laying of P.C.C. under floor base with mortar of ratio 1:4:8 1cement, 4 c.sand and stone ballast 20 - 40 mm gauge. Including all the labour, supply of material and T&P. Required proper completion of work at the site. | 17.1 | Cum | 7,082 ₹1,21,102.2 | 7,100 ₹1,21,410 | 7,400 ₹1,26,540 | 7,080 ₹1,21,068 Lowest |
| 1.08 | Provision for applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel works.) & Provision for Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. | 201.2 | Sqm | 305 ₹61,366 | 330 ₹66,396 | 370 ₹74,444 | 304 ₹61,164.8 Lowest |
| 1.09 | Provision for fixing of Culture Notice Board with sand stone tablet and base pillar of appropriate size as per designed by the department by engraving of letters in bilingual of suitable size. Including all supply material, finishing, engraving and fixing etc. Including all the labour, material and T&P. required proper completion of work at the site. | 1 | Nos | 57,040 ₹57,040 | 57,500 ₹57,500 | 58,500 ₹58,500 | 57,000 ₹57,000 Lowest |
Tender Value
₹29.7 L
EMD Value
₹59,475
Closing Date
1 Apr 2026, 2:00 pmClosed
Superintending Archaeologist
Office of the Superintending Archaeologist, Archaeological Survey of India, Jhansi Circle, Rani Mahal, Jhansi, Uttar Pradesh 284002
as per tender document
2026_ASI_902667_1
5-3/48/2025-26-KWI-C
Open Tender
Civil Works
Works
90 days
Jhansi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹59,475
Yes
29 Jun 2026
16 Mar 2026
2 Apr 2026
16 Mar 2026
1 Apr 2026
16 Mar 2026
16 Mar 2026 - 19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work | |||||
| 1.01 | Provision for dismantling of Ruined/Crack C.R. Stone masonry in cement mortar on super structure. Including stacking of usefull material as C.R. Stone for reuse in masonry work which will be about 90% and disposal of refused out of monument upto lead 60 mt. including all the labour material and T&P required proper completion of work at the site. Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 40 | Cum | - | - |
| 1.02 | Provision for dismantling of flag stone flooring cement mortar including stacking of serviciable material for reuse in flooring work and disposal of refused upto lead 60 mt. including all the labour material and T&P required proper completion of work at the site. Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | 114 | Sqm | - | - |
| 1.03 | Provision for Coursed rubble masonry with hard stone (first or second sort) in super structure above plinth level and upto floor five level. including all the labour material and T&P required proper completion of work at the site. In cement mortar 1:6 (1 cement: 6 coarse sand) cum. | 55 | Cum | - | - |
| 1.04 | Provision for Coping with 50 mm thick sand stone on top of wall with 20 mm. thick bed of mortar of ratio 1:6 cement and c sand . Coping stone to be laid with fine dressing and making side end as semi circular shap (Bull nose type) etc complete including all the labour material and T&P required proper completion of work at the site. | 125 | Sqm | - | - |
| 1.05 | Supply and fixing of MS grill railing/fencing on the boundary wall for safety and security of the site with MS angle 40x40x5mm vertical post and same size angle horizontal support of top and bottom for adjoining the frame 12mm dia bar with arrow headed on top and placed vertically at a distance of 10 cm c/c and 40x5 mm flat iron Both grill railing panel fixed together by nut bolt etc complete as per design/drawing attached. Department including all the labour, material & fabrication fixing etc with all completion. (Grill Panel size 2.00 x 0.90 mtr). | 201.2 | Rmt | - | - |
| 1.06 | Provision for flush/ruled pointing on stone work with cement mortar of ratio 1:3 cement and course sand. After carefully racking of masonry joints and washing of surface. Including all the labour, supply of material and T&P. Required proper completion of work at the site. | 600 | Sqm | - | - |
| 1.07 | Provision for laying of P.C.C. under floor base with mortar of ratio 1:4:8 1cement, 4 c.sand and stone ballast 20 - 40 mm gauge. Including all the labour, supply of material and T&P. Required proper completion of work at the site. | 17.1 | Cum | - | - |
| 1.08 | Provision for applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel works.) & Provision for Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. | 201.2 | Sqm | - | - |
| 1.09 | Provision for fixing of Culture Notice Board with sand stone tablet and base pillar of appropriate size as per designed by the department by engraving of letters in bilingual of suitable size. Including all supply material, finishing, engraving and fixing etc. Including all the labour, material and T&P. required proper completion of work at the site. | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
docwork.pdf
Tender Documents • 7.45 MB
letter.pdf
Additional Documents • 0.38 MB
BOQ_948767.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .