Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC CIA STAFF GALI NARWANA JIND HARYANA 126116 | NARWANA | JIND | HARYANA | 126116 | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.9 L+₹32,657.36 (3.41%)Rejected-Finance 4 MARIA COLONY FATEHABAD 125050 | FATEHABAD | FATEHABAD | HARYANA | 125050 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.0 L+₹43,260.40 (4.52%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹10.1 L+₹53,538.28 (5.59%)Rejected-Finance 575 TOHANA 125120 | TOHANA | FATEHABAD | HARYANA | 125120 | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical 5 NARAYAN VIHAR NANGAL JAISA BOHRA JHOTWARA JAIPUR RAJASTHAN 302012 | JAIPUR | RAJASTHAN | 302012 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹14.1 L
EMD Value
₹28,275
Closing Date
20 Mar 2026, 3:00 pmClosed
Narinder Pawar
Municipal Committee Bhuna
Const of side street from Vijay bansal to Kamboj Shop in ward no 1 bhuna. Retender
2026_HRY_508331_1
202689393092 A57B 487D 8161 06B89E4F7BC4275ULB
Open Tender
Civil Works
Works
150 days
Bhuna
2 documents required · 2 mandatory
₹1,000
₹28,275
Yes
7 May 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
13 Mar 2026 - 15 Mar 2026
[10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate]
[17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_587100.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .