Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
20 Feb 2026, 3:00 pmClosed
MR Kamlesh Kumar Verma(DFLT)
NRDA, NAYA RAIPUR
Operation and Comprehensive Annual Maintenance Contract of Street Light and High Mast Lighting System along with Associated Electrical System Installed in Nava Raipur Atal Nagar, Distt. - Raipur (C.G.)”(1st Call)
185082
NIT No 91/CAMC-SL-V/ELECT/CE/NRANVP/2025-26, Nava Raipur Atal Nagar Dated: 30.01.2026
OPEN TENDER
WORKS
36 days
NRDA, NAYA RAIPUR
Required Past Technical Experience: AS PER DNIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Nava Raipur Atal Nagar Vikas Pradhikaran (NRANVP)
WORKS
MR Kamlesh Kumar Verma(DFLT)
OPEN TENDER
PERCENTAGE
OPEN TO ALL
NRDA, NAYA RAIPUR
ENGINEERING
CHIEF ENGINEER OFFICE
90
36.00
No
0
185082
20 Feb, 2026 3:00:00 PM IST
23 Feb, 2026 4:00:00 PM IST
4 Feb, 2026 6:00:00 PM IST
NIT No 91/CAMC-SL-V/ELECT/CE/NRANVP/2025-26, Nava Raipur Atal Nagar Dated: 30.01.2026
Operation and Comprehensive Annual Maintenance Contract of Street Light and High Mast Lighting System along with Associated Electrical System Installed in Nava Raipur Atal Nagar, Distt. - Raipur (C.G.)”(1st Call)
340000.00 INR
BANK GUARANTEE (OFFLINE) Demand Draft (OFFLINE) Fixed Deposit Receipt (OFFLINE)
33535986.00
2
23 Feb, 2026 3:00:00 PM IST
33535986
AS PER NIT
AS PER NIT
AS PER DNIT
5900.00 INR
0d 15h 0m
15 documents required · 15 mandatory
₹5,900
₹3.4 L
30 Jan 2026
30 Jan 2026
23 Feb 2026
4 Feb 2026
20 Feb 2026
4 Feb 2026
23 Feb 2026
Operation for LED street light up to 70 Wa. Switching ON/OFF of street lightb.Repair/replacement of Street light poles, pole bracket ,HDPE Pipe ,cables, wires, MCB's, earthing, earthing strip, earth wire c. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles,CT ,PT etc.d. Accessories of street light monitoring system ,GPRS etc e. Replacement of worn out cables/wires etc. including excavationf. Cost of Tower wagon, g. Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation for LED street light from 71 W to 140 Wa. Switching ON/OFF of street lightb.Repair/replacement of Street light poles, , pole bracket ,HDPE Pipe,cables, wires, MCB's, earthing, earthing strip, earth wire, c. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles,CT,PT etc.d. Accessories of street light monitoring system ,GPRS etc e. Replacement of worn out cables/wires etc. including excavationf. Cost of Tower wagon, g. Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation for LED street light from 141 W to 250 Wa. Switching ON/OFF of street lightb.Repair/replacement of Street light poles, , pole bracket ,HDPE Pipe ,cables, wires, MCB's, earthing, earthing strip, earth wire c. service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles,CT ,PT etc.d. Accessories of street light monitoring system , GPRS etc e. Replacement of worn out cables/wires etc. including excavationf. Cost of Tower wagon, g. cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of LED street light up to 70 W a. Switching ON/OFF of street light, b.Repair/replacement of Street light poles, pole bracket ,HDPE Pipe, light fixtures, cables, wires, MCB's, earthing, earthing strip, earth wirec. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles,CT,PT etc.d. Accessories of street light monitoring system , GPRS etce. Replacement of worn out cables/wires etc. including excavation and f. Cost of Tower wagon, g. cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: (LED street light from 71 W to 140 W )a. Switching ON/OFF of street light,b.Repair and replacement of Street light poles, light fixtures, pole bracket ,HDPE Pipe, cables, wires, MCB's, earthing, earthing strip, earth wire, b. service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles ,CT,PT etc.c. accessories of street light monitoring system,GPRS etcd. replacement of worn out cables/wires etc. including excavation and e. cost of Tower wagon, f. cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: (LED street light from 141W to 250 W )a. Switching ON/OFF of street light,b.Repair and replacement of Street light poles, light fixtures, , pole bracket ,HDPE Pipe ,cables, wires, MCB's, earthing, earthing strip, earth wire, b. service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles etc.c. accessories of street light monitoring system. d. replacement of worn out cables/wires etc. including excavation and e. cost of Tower wagon, f. Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: (HPSV street light up to 70 W )a. Switching ON/OFF of street light,b.Repair and replacement of Street light poles, light fixtures, , pole bracket ,HDPE Pipe, cables, wires, MCB's, earthing, earthing strip, earth wire, b. service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles ,CT,PT etc.c. accessories of street light monitoring system ,GPRS etc d. replacement of worn out cables/wires etc. including excavation and e. cost of Tower wagon, f. cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: (HPSV street light from 71 W to 150 W )a. Switching ON/OFF of street light,b.Repair and replacement of Street light poles, light fixtures, pole bracket ,HDPE Pipe, cables, wires, MCB's, earthing, earthing strip, earth wire, b. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles ,CT,PT etc.c. Accessories of street light monitoring system ,GPRS etc d. Replacement of worn out cables/wires etc. including excavation e. Cost of Tower wagon, f. Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: (HPSV street light from 151 W to 250 W )a. Switching ON/OFF of street light,Street light poles, pole bracket ,HDPE Pipe, light fixtures, lamps, chokes, ignitor, cables, wires, MCB's, earthing, earthing strip, earth wire, b. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles CT ,PT etc.c. Accessories of street light monitoring system GPRS etc d. Replacement of worn out cables/wires etc. including excavation and e. Cost of Tower wagon, f. Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: 400 w metal halide /LED Flood light a. Switching ON/OFF of street light,Street light poles,high mast , pole bracket ,HDPE Pipe , light fixtures, lamps, chokes, ignitor, cables, wires, MCB's, earthing, earthing strip, earth wire, b. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles etc.c. Accessories of street light monitoring system. d. Replacement of worn out cables/wires etc. including excavation and e. Cost of Tower wagon, f . Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Operation & Maintenance of: LED strip light a. Switching ON/OFF of street light,Street light poles,high mast , pole bracket ,HDPE Pipe , light fixtures, lamps, chokes, ignitor, cables, wires, MCB's, earthing, earthing strip, earth wire, b. Service Pillar (Feeder Pillar) including all accessories such as MCB, MCCB's bus bars, HRC fuses, rewirable fuses, contactor, timers, connector, wires, earthing, glands, thimbles etc.c. Accessories of street light monitoring system. d. Replacement of worn out cables/wires etc. including excavation and e. Cost of Tower wagon, f . Cost of cable fault locator equipment and all required tools, labour and all other incidental operations required for execution of maintenance work are included in the rates
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.07 MB
3645478550534049361_67966_03 NRANVP-GCC2011 - e Modified R3.pdf
NIT • 1.69 MB
2609246711831988313_185082_Guidelines_To_Bidders_EPS_v1.pdf
NIT • 0.52 MB
1532727357942785363_185082_02 Affidavit p.pdf
NIT • 0.16 MB
1003708117506869806_185082_01 NRANVP F-1.pdf
NIT • 10.15 MB
7104791423938223229_185082_05 BOQ.xlsx
BOQ • 0.01 MB
Download all tender documents and submit your bid