| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC PALAPATHY NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | L1 | Accepted-AOC Accept | |
| 2 | L2₹9.1 L+₹22,725.84 (2.57%)Rejected-AOC MOHANUR NAMAKKAL | MOHANUR | NAMAKKAL | TAMIL NADU | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | R Thangavel L2 | sureshkumarv L1 |
|---|---|---|---|---|---|
| 1.00Rural Road Maintenance at Mohanur Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 – 2026 | |||||
| 2.00Maintanace to the Road from Kambathorpatty to nallaiyampatty road KM - 0/000 - 1/490 H/O Parali | |||||
| 3.00 | Clearing Scrup jungles and removing them by burrying or burning etc., complete | 768 | Sqm | 10 ₹7,680 | 6.3 ₹4,838.4 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 27 | Cum | 250 ₹6,750 | 140 ₹3,780 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 17.42 | Cum | 3,500 ₹60,970 | 2,728 ₹47,521.76 Lowest |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 116 | Sqm | 85.84 ₹9,957.44 Lowest | 85.84 ₹9,957.44 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., . | 116 | Sqm | 19.97 ₹2,316.52 Lowest | 19.97 ₹2,316.52 Lowest |
| 8.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 291.9 | Sqm | 34.03 ₹9,933.36 Lowest | 34.03 ₹9,933.36 Lowest |
| 9.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 407.9 | Sqm | 308.87 ₹1,25,988.07 Lowest | 308.87 ₹1,25,988.07 Lowest |
| 10.00Maintanace to the Road from Valayapatty-Kattuputhur road to Arur pudur road KM - 0/000 - 1/100 H/O Arur | |||||
Tender Value
₹9.0 L
EMD Value
₹8,960
Closing Date
5 Nov 2025, 3:00 pmClosed
Block Developement Officer (B.Pt), Mohanur
Block Developement Office, Mohanur
Rural Road Maintenance at Mohanur Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 - 2026
2025_RDTN_616824_2
A2/2589/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Block Developement Office, Mohanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,960
Yes
1 Dec 2025
24 Oct 2025
5 Nov 2025
24 Oct 2025
5 Nov 2025
24 Oct 2025
Amount
Rural Road Maintenance at Mohanur Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 – 2026
Maintanace to the Road from Kambathorpatty to nallaiyampatty road KM - 0/000 - 1/490 H/O Parali
Clearing Scrup jungles and removing them by burrying or burning etc., complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., .
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Maintanace to the Road from Valayapatty-Kattuputhur road to Arur pudur road KM - 0/000 - 1/100 H/O Arur
Clearing Scrup jungles and removing them by burrying or burning etc., complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., .
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R Thangavel (BID ID -1503861)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737076.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_737076.xls
BOQ • 0.23 MB
2.pdf
Tender Documents • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .