| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.7 Cr+₹11.5 L (7.32%)Rejected-Finance MUMBAI THANE MAHARASHTRA | ₹1.7 Cr+₹11.5 L (7.32%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.7 Cr+₹11.5 L (7.35%)Rejected-Finance PLOT NO 2 ROAD NO 6 SECTOR 1 S NEW PANVEL DIST RAIGAD 410206 MAHARASHTRA | RAIGAD | MAHARASHTRA | 410206 | ₹1.7 Cr+₹11.5 L (7.35%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹1.7 Cr+₹17.7 L (11.3%)Rejected-Finance 001 HPS MARKET KANPUR GANDHI CHAURAHA RAEBARELI UTTAR PRADESH 229206 UDYAM UP 62 0025959 | RAE BARELI | UTTAR PRADESH | 229206 | ₹1.7 Cr+₹17.7 L (11.3%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹1.8 Cr+₹19.6 L (12.5%)Rejected-Finance ROMA BANJARA TANDA CHS BUILDING NO 1 ROOM NO 506 MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹1.8 Cr+₹19.6 L (12.5%) | L5 | Rejected-Finance Being L5 |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
1 Feb 2023, 3:00 pmClosed
Head,CED
CED,BARC,Trombay,Mumbai
Construction of RCC road at south gate Portal of BARC, Trombay Mumbai
2023_BARC_734669_1
BARC/CED/ET/64/2022-2023 Dated 29.12.2022
Open Tender
Civil Works
Item Rate
305 days
BARC, Trombay, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.9 L
23 May 2023
12 Jan 2023
6 Feb 2023
12 Jan 2023
1 Feb 2023
17 Jan 2023
Amount
From 0.00 to 1.50 m depth from Average Ground Level
Providing, centering, shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels
For Sub Structure
Providing and laying in position cement concrete of 1:3:6/ M-10 with minimum cement content 220 Kg/Cum (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels
Providing and laying design mix cement concrete of M-45 grade in roads, taxi tracks and runways using crushed Sand, graded stone aggregate of 20 mm nominal size in appropriate proportions as per specified design criteria approved by Engineer-in-charge, mechanically vibrated using needle and Surface vibrators including steel form work with sturdy M-S channel sections including curing and providing and filling construction joints and dummy joints with approved joint filler primer or equivalent including rounding of the edges and filling the grooves 10 x 25 mm deep at top for construction joints and 10 mm x 50 mm deep at top for dummy joints with joint sealing compound (conforming to grade B of IS:1834) including making necessary arrangements for expansion joints etc all complete as directed by the Engineer-in-charge
Providing and fixing in position premoulded jointer filler in expansion joints
Providing and laying in position bitumen hot sealing compound for expansin joints using approved make.
Providing Reinforcement for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules,cutting, bending, transporting, fixing, tieing in position with 1.6 mm dia soft drawn annealed binding wire all labour charges, cost of cover blocks in specified grade of concrete etc. complete including cost of binding wire as per specifications and drawings. Note: Cover blocks shall be of same grade of concrete
Steel Supplied by the Contractor Using TMT bars of specified grades all dia bars. TMT bars to be supplied by the contractor manufactured by approved brands of BARC only Confirming to IS:1786
Painting road surface marking with Thermoplastic paint hot applied to give uniform finish with Glass beeds / power Topping, on bituminous surface in white / yellow shade including cleaning the surface of all dirt, scales, oil, grease and other foreign material etc complete as directed by the Engineer-in-charge
Thermoplastic paint on bitumen sufaces
Thermoplastic paint on concrete sufaces including primer
Providing, laying, spreading and compacting hand broken/ crushed stone aggregate, 150 mm thick Wet Mix Macadam including premixing of material with water in mixing plant for Wet Mix Macadam, carriage of mixed material by tipers to the site and laying material in uniform thickness and laying by mechanical paver including rolling with road roller 8.10 tonne capacity in stages to proper grade and camber spreading and brooming etc. complete as directed by the Engineer-in-Charge (Compacted thickness only will be measured and paid for.)
Dismantling manually / by mechanical means including stacking of serviceable materials and disposal of unserviceable materilas within 200 m lead as per direction of Engineer-in-charge
WBM Road
Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead
Bituminous Road
Demolishing dry stone pitching in floors, drains etc. including stacking serviceable materials and disposal of unserviceable materials within 200 m lead
Extra for RCC/PCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants .
Dismantling Kerb stone carefully without damaging the stone, including removal of earth, base pcc etc. and refixing the same in line and level on newly laid base PCC 1:3:6 and pointing the exposed faces in cement mortar 1:3, curing etc. complete as directed by the Engineer in charge. The rate shall also include charges for disposal of unserviceable materials within 50 m lead. The base PCC laid shall be paid separately under relevant item.
Preparation and consolidation of sub-grade (Proof Rolling) with power roller of 8 to 10T capacity , dressing to camber and consolidating with road roller including making good the undulations etc. and rerolling the subgrade .Note: Excavation shall be paid in relavant Item.
Manufacturing supplying and fixing retro Reflective overhead informatory roads signage boards made up of 2 mm thick aluminum sheet face to be fully covered with high intensity and encapsulated lens type heat activated retro reflective sheeting conforming to type III of ASTM-D-4956-01 as approved by EIC letters, borders etc. as per IRC:67-2001 in silver white with blue colour back ground and with high intensity grade, pasted on substrate by pressure sensitive adhesive backing which shall be activated by applying presure ocnforming to class of ASTM-D-4956-01 and fixing the same to the plate of structural frame work by means of suitable sized aluminium alloys, rivets or bolts and nuts @ 300 mm centre to centre all along the periphery as well as in two vertical rows along with theft resistant measures. The rate includes the cost of painting with two or more coats of epoxy paint in grey colour on the back side of aluminium sheet including appropriate priming coat. The rate includes the cost of rounding off corners, lowering down the structural frame work from the gantry, fixing and erecting the same in position all complete as per drawings, specification and direction of the engineer-in-charge.
Lead charges for lead exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris Note: The rates in respect of this items are applicable for NET Quantities arrived at after making deduction for voids @ 30% for Debris & @ 20% in respect of soil from corresponding TRUCK Measurement.
Providing Reinforcement Mild Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules,cutting, bending, transporting, fixing, tieing in position with 1.6 mm dia soft drawn annealed binding wire all labour charges, cost of cover blocks in specified grade of concrete etc. complete including cost of binding wire as per specifications and drawings. Note: Cover blocks shall be of same grade of concrete Mild Steel bars to be supplied by the contractor manufactured by approved brands of BARC only Confirming to IS:1786
Providing and laying polythene sheet of 200 Micron on prepared surface for pouring of concrete. The plan area to be measured only. The sheet should be approved by the Engineer-in-charge.
Supplying man power along with necessary pans, spades, shovels pickaxe, punjas, ropes, small special spade, raincoats, safety shoes, etc. minimum two number of labour per day upto maximum any number of labour as and when decided by Project Engineer to work for eight hours per day or monsoon period to carry out the cleaning of choked drains grating grills/hume pipes /footpath by removing the dry leaves, silt etc. and also carry out seasonable departmental work allotted by Project Engineer from time to time.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1)Each Job shall be carried out by one qualified Technician having minimum SSC or Trade certificate in Masonary/Plumber/Carpenter/Painter Trade of less than one year duration from ITI/Government Recognised Vocational Training Institute. (2)Deployment: The contractor shall deploy one Technician for each job for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out 1 Job per day for the period mentioned in NIT. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Technician exclusively for the particular job. (5) Person should be engage after scrutiny of BARC Engineers and approved by Competent authority.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1)Each Job shall be carried out by one qualified Degree holder with 1 (one ) year experience/Diploma holder with 3 year experience /Licentiate in Civil/Construction Engineering / Technology conducted by Board of Technical Examinations / University/ Autonomous Govt / Govt recognized recognized Polytechnic/ Institute. (2)Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account.(3) Period of work: The contractor shall carry out 1 (one)/2 (two) Jobs per month as per requirement at site for the period mentioned in NIT.(4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one engineer exclusively for the particular job.(5) Engineer should be engage after scrutiny of BARC Engineers and approved by Competent authority.
Providing and laying in position Reinforced Cement Concrete (RCC) of Grade M-25 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level
Extra for RCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants .
Supplying and stacking of grade stone aggregate at site of size range Supplying and stacking at site stone grit 13.2 mm nominal size (Type-A)
lalit constructions
Shree Enterprises
Renjin Construction
SUNIL CONSTRUCTION
shoiab construction
ANUBHAV ENGINEERING COMPANY
RESHMA CONSTRUCTION
M/s Reena Constructions
UCC INFRASTRUCTURE PVT LTD
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .