Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | ₹12.1 L | L1 | Admitted-Finance |
| 2 | L2₹12.9 LAdmitted-Finance | ₹12.9 L | L2 | Admitted-Finance |
| 3 | L3₹13.4 LAdmitted-Finance | ₹13.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMJ TENT HOUSE L1 | SLN ENTERPRISES L3 | M R TENT HOUSE L2 |
|---|---|---|---|---|---|---|
| 1.01 | Arrangements at amphitheater for 51st convocation and other events at campus
Grand Total including GST | 1 | Nos | 1 ₹12.1 L | 1 ₹13.4 L | 1 ₹12.9 L |
Tender Value
Refer Docs
Closing Date
24 Feb 2026, 3:00 pmClosed
Chief Manager (Infrastructure)
Chief Manager (Infrastructure), Estate Section, IIMB
Arrangements at amphitheater for 51st convocation and other events at campus
2026_IIMB_898376_1
CMI/ME/171/25-26
Limited
Entertainment/Musical Instruments
365 days
IIMB Bilakahalli, Bangalore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
25 Feb 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
Arrangements at amphitheater for 51st convocation and other events at campus Grand Total including GST
Arrangements at Amphitheatre for 51st convocation, and other events at campus
Schedule of Quantities
PART A - 51st CONVOCATION
Laying Red synthetic carpet Brand new sealed for pathways and corridors as directed and joints sealed with tranparent tape, cleaning etc complete as directed (Refer images for details) Note: Sample to be produced and approved.
Laying Red synthetic carpet Brand new sealed for stage as directed including cutting the carpet to the required shape curve/diagonal etc to match the profile as directed and joints sealed with tranparent tape, cleaning etc complete as directed (Refer images for details) Note: Sample to be produced and approved.
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
Arranging VIP seating with single seater sofa sets ( White colour ) (Refer images for details) as directed by Engineer-in-charge.
Side walls -10Ft Height at MDC Lawns
Erecting barrier post with retrivable tape for barricating the required area as directed by engineer in charge
TOTAL - A
PART B - PGP 2 - REORIENTATION
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
TOTAL - B
PART C - PGP 1 & PGPBA 1 INUAGURATION
Laying Red synthetic carpet Brand new sealed for stage as directed including cutting the carpet to the required shape curve/diagonal etc to match the profile as directed and joints sealed with tranparent tape, cleaning etc complete as directed (Refer images for details) Note: Sample to be produced and approved.
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
TOTAL - C
PART D - ORIENTATION SESSIONS
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
Chairs : Armless plastic chairs with white cloth cover (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
Tables with fiber top / wooden top board covered with cloth frills to be used for serving snacks / multipurpose of size 72" x 24" X 30" covered with cloth frills of approved colour and material as directed by the Engineer-in-charge.
TOTAL -D
PART E - SESSION FOR INCOMMING STUDENTS AT YOGA ROOM
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge.
TOTAL - E
PART F - HOSTEL ROOM REGISTRATION
Chairs : Armless plastic chairs with white cloth cover (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-chrge.
Tables with fiber top / wooden top board covered with cloth frills to be used for serving snacks / multipurpose of size 72" x 24" X 30" covered with cloth frills of approved colour and material as directed by the Engineer-in-charge.
TOTAL - F
PART G - YOGA DAY CELEBRATION
Laying Red synthetic carpet Brand new sealed for pathways and corridors as directed and joints sealed with tranparent tape, cleaning etc complete as directed (Refer images for details) Note: Sample to be produced and approved.
TOTAL - G
PART H - FOUNDATION DAY CELEBRATION
Side walls -10Ft Height at MDC lawn
TOTAL -H
PART I- PRAGYA EVENT
Chairs : Armless plastic chairs (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-charge. (Actual quantity of chairs shall be informed before delivery of the same )
TOTAL - I
PART J - GUEST SESSIONS
Chairs : Armless plastic chairs with white cloth cover (Colour combination as per the engineers instructions) Chairs shall be of same colur as approved and no damage/broken chairs and faded in colour is permitted. The rate shall be including wet washing of chairs, arrangement of chairs at the required locations as per the approved seating layout etc comlplete as directed by Engineer-in-chrge.
TOTAL - J
TOTAL ( A TO J ) excluding GST
GRAND TOTAL including GST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_944290.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid