Executive Engineer PHED Distt Rural Dn II Bikaner
Executive Engineer PHED Distt Rural Dn II Bikaner
OPERATION AND MAINTENANCE OF TUBEWELL, PUMPHOUSE , PIPELINE AND VALVE UNDER JEN SEC. II, UNDER SUB DIV. I, Bikaner
2026_PHCJA_567182_1
EE/PHED/D2/2026-27/51
Open Tender
Civil Works - Water Works
180 days
BIKANER
AS PER TD
2 documents required · 2 mandatory
₹1,000
Executive Engineer PHED Distt Rural Dn II Bikaner
₹63,060
Yes
12 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
17 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PART-A | - | - | - | - | BI01010001010000000000000515BI0100001112 |
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.
Jointing material shall be provided by the department. | - | - | - | - | BI01010001010000000000000515BI0100001113 | |
Minimum labour for a following kms pipelines to be deployed. | - | - | - | - | BI01010001010000000000000515BI0100001114 | |
1 km to 50 km - one fitter-II & one beldar | - | - | - | - | BI01010001010000000000000515BI0100001115 | |
51 km to 100 km - one fitter-II & Two beldar | - | - | - | - | BI01010001010000000000000515BI0100001116 | |
101 km to 200 km - Two fitter-II & Four beldar | - | - | - | - | BI01010001010000000000000515BI0100001117 | |
201km to 300 km - Three fitter-II & Six beldar | - | - | - | - | BI01010001010000000000000515BI0100001118 | |
301 km to 400 km - Four fitter-II & Eight beldar | - | - | - | - | BI01010001010000000000000515BI0100001119 | |
401 km to 500 km - Five fitter-II & Ten beldar | 1,215 | per km per month | 667 | ₹8,10,405 | BI01010001010000000000000515BI0100001120 | |
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs/ rewinding of submersible pumo sets including cost of meterial components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, loweing and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineering-in-charge for tubewell per month. (for rural scheme where three phase electic suppy is up to 8 hrs) | - | - | - | - | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.