Tender ID
Tender Value
₹40.3 L
EMD Value
₹80,700
Closing Date
13 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
WORKS
24 conditions · 3 needing a document upload
Format of Declaration and Self certificate in case of small value tenders, (i.e. tender value less than Rs. 50 lakhs), is being attached in Documents Tab. Tenderers should download, fill and submit both the proforma (Annexure V & VA) along with their offer, failing which offer may be rejected summarily.
"The said suppliers of goods and/or services would be subject to GST Act and Rules as applicable from time to time. Tenderers are requested to submit their offers as per GST Tax regime. All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law"
Successful tenderers are required to submit the number of labour to be employed for this particular work. Also the list showing names, along with all other details, of male and female workers employed in this work, should be submitted to office, at the time of submitting performance guarantee and before executing contract agreement. They should also ensure that 1) The payment to the contract labour should be made through bank/cheque. 2) Identity Cards should be issued to all contract workers. 3) Necessary steps should be taken to deduct provident fund from the payment made to contract labour and ensure that the same is credited to their Provident Fund account. 4)Medical facilities from ESI should be ensured, if applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are required to submit a copy of cancelled cheque in order to facilitate the payments regarding refund of EMD etc. in their proper accounts.
In addition to latest provisions of GCC, and all contents of tender documents, all other latest instructions of Railway Boards issued vide various letters received from time to time on concerned matters and related to tender, will also be applicable for the tenders as per necessity and tenderers have to co-operate with Railways and ensure the compliance
Indian Railways Standard General Conditions of Contract, April 2022 (GCC, April 2022) has been introduced and available on website with all correction slips issued up to date for inviting tender and same will be applicable for this tender. Advance Correction Slip No. 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 to Indian Railways Standard General Conditions of Contract, April - 2022 circulated by the Railway Board vide letter No. 2022/CE-I/ CT/GCC-2022/Policy dated 14.07.2022, 13.12.2022, 26.04.2023, 07.08.2023, 20.10.2023 , 21.12.2023, 25.09.2024, 20.12.2024, 09.01.2025 and 04.03.2025 are applicable to this tender. Tenderers are requested to download the same from the railways website and ensure the implementation of the latest provisions made in GCC while execution of work. After that, if any latest correction slip issued by Railway Board on any matter, will also be applicable with immediate effect, though not mentioned in original tender document.
I/We agree to carry out all works with use of modern equipments of required capacity for the work without extra payment. The decision of railway engineer shall be final and binding in this regard.
It is the responsibility of contractor to arrange the payment of the labour employed for the work through bank and to deduct PF as per the provisions of Minimum Wages Act.
The quantities shown above are approximate and to give a general guideline. Railway reserves a right to increase, decrease or to delete any of the items mentioned in schedule.
As per ACS 1 to GCC April 2022, issued vide Railway Board's letter dt. 14.07.2022, PVC Clause shall be applicable only in tenders having advertised value above Rs. 2 Crores provided to the provisions as per clause 46A-1. Tenderers should take a note and quote their rates accordingly.
In case Civil work tenders, the quantity of cement required in the items where necessary, will be used by the contractor on the same rates as accepted in tender, as per the quantity mentioned against each item in USSOR/DSR, though not mentioned in tender schedule.
Tenderers are advised to quote their rates including all type of taxes and levies etc. to be paid by them. Any extra payment will not be made on account of taxes/Levies etc., in excess of Contract Agreement Value,
In case of submission of Bid Security in the form of Bank Guarantee, a scanned copy of Original BG valid for a period of 90 days beyond the validity period of tender, and addressed in favour of Sr. DFM/WCR/BPL, shall be uploaded on IREPS portal while applying for tender. And As per ACS 2 to GCC April 2022, circulated vide Railway Board letter dt. 13.12.22, original BG should be delivered in person to the Concerned Official in Office before closing date for submission of bid (i.e. Excluding the last date of submission of bid) without fail. Any failure in this connection shall lead to summary rejection of bid.
Main line alignment correction by Pre & Post Tamping Track measurement using Gedo Vorsys trolley system or similar under ADEN/M/Bhopal section.
WCR-BPL-W-25-26-C-40-156
WCR-BPL-W-25-26-C-40-156
Open
Works - General
6 Months
Bhopal, Madhya Pradesh
₹0
₹80,700
13 Mar 2026
19 Feb 2026
27 Feb 2026
5 items across 1 schedule · ₹40,33,112.85 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Pre tamping Measurements (a) Establishments of main GNSS (DGPS Base) Point & reference point establishment at 150 meter maximum interval along the track. | Kilometre | 117.00 | 6,377.19 | 7,46,131.23 |
| 2 | Pre measurement for Tamping with total station & prism Gedo trolley measurement and store Gauge, Cross elevation, Chainage, shift and lift value at every 3 m (ie) Every 5th sleeper interval along side the track centre line and coordinates of track centre lines at every 3 m to be submitted with track Geometry. (Per km/round). | Kilometre | 117.00 | 11,173.65 | 13,07,317.05 |
| 3 | Construct Target/Designs Alignment to construct Target/ Design alignment with the good points of existing pre measurement profile in design software to export data in ALC format with design alignment or measured reading in M/C and to provide track adjustment file .Ver extension and also to provide .Geo Geometry file to provide text file with slew, up lift and gauge every 3.0 m interval (ie) every 5th sleeper interval for tamping machine operator during reference. | Kilometre | 117.00 | 2,873.28 | 3,36,173.76 |
| 4 | Post tamping Measurements (a) Post tamping measurements with total station & prism Gedo Trolley measure and store Gauge, Cross elevation, Chainage, Shift and lift value at every 3m (ie) every 5th sleeper interval along side the track centre line and coordinates of track centre line at every 3 m to be submitted with track geometry. (Per Km/Round). | Kilometre | 117.00 | 11,173.65 | 13,07,317.05 |
| 5 | Reporting report and plotting soft and hard copies of slew and up lift report at every 3m (ie) at every 5th sleeper interval compared with design VS pre profile report of offset distance from track centre to OHE, neighbouring track centre & platform point. | Kilometre | 117.00 | 2,873.28 | 3,36,173.76 |
| Schedule total | ₹40,33,112.85 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDGCCMay25.pdf
ATTACHMENT
AnnexureVforsmallvaluetenders.pdf
ATTACHMENT
AnnexureVAforsmallvaluetenders.pdf Annexure VA
ATTACHMENT
GedoVorsys.pdf
ATTACHMENT
AnnexureVAforsmallvaluetenders.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .