Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical 1 8 373 FLAT NO 704 KRISHE GARDEN BEGUMPET BEGUMPET HYDERABAD TELANGANA 500016 | MEDCHAL MALKAJGIRI | TELANGANA | 500016 | Rejected-Technical Documents not found order |
| 2 | Rejected-Technical 149 LANE NO 11 SOCIETY AREA OPP TO GRAPHICS ERA UNIVERSITY STAFF QUATERS CLEMENT TOWN DEHRADUN UTTARAKHAND 248002 | DEHRADUN | UTTARAKHAND | 248002 | Rejected-Technical Documents not found order |
| 3 | Rejected-Technical 301 ASHIRVAD PARAS OPP PRAHLADNAGAR GARDEN SATELLITE AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | Rejected-Technical Tender cancelled due to single tender as well as few documents not submitted as per Proceedings attached. |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
22 Dec 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ELECT FHQ NEW DELHI
SE ELECT FHQ NEW DELHI
Providing installation testing and commissioning of 25 KWp off Grid Solar Power Plant at 16 BOPs of 13 Bn Now 51 Bn BSF of SHQ BSF Barmer under FTR HQ Gujarat Including construction of RCC framed structure for battery room
2025_BSF_888778_1
15/SE(E)/NIT/SHQ-BMR/ENGG/2025
Open Tender
Power/Energy Projects/Products
EPC Contract
365 days
DIG SHQ BSF BARMER
Please refer Tender documents
3 documents required · 3 mandatory
₹0
₹10.6 L
12 Mar 2026
6 Dec 2025
23 Dec 2025
6 Dec 2025
22 Dec 2025
6 Dec 2025
Planning, Designing, Providing, installation, testing and commissioning of Hybrid/off-grid ( with the provision to charge from main power source) Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on RCC structure of suitable strength with following components complete as required as per Appdx “A” The rates quoted should be inclusive of all taxes, transportation charges , loading/unloading at site etc as reqd:-
(A) Solar Photovoltaic Module of capacity 350 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IEC 61730-Part-1, IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (B) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C (C) Data Monitoring System complete with accessories. (D) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (E) Lightning and surge voltage protection. (F) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit ,Changeover, along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (G) Battery bank of solar power plant VRLA type SOLAR TUBULAR GEL BATTERIES eachof 2 volt 750/800ah 120 (Total battery bank capacity is 1,80,000Wh) fulll load battery backup up to 06 hrs as per MNRE standards, along-with battery rack and interconnections. (H) Cost for construction of RCC structure as required for Battery bank / Control room shall be of size 150 sq. feet (minimum), with head room of minimum 2.9 meters & plinth height shall be minimum 1.8 meter (minimum) from natural ground level as per drawing to be approved by Engineer-in-charge. The flooring should be of RCC (must withstand the load of batteries and other equipment). Steel gate, window-02 nos (minimum) , opening for exhaust must be installed in control room. Roof of control room must be so designed to prevent water lodging and proving approach path of cement concrete from battery room to solar panel( upto 40 mtr ) total (120 sqmtr ) etc. complete as per Scope of Work & Technical Specifications .
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_934159.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .