Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹3.8 L
Closing Date
17 Mar 2023, 2:00 pmClosed
EEOMVELLORE
EEOMVELLORE
Works Contract for Shifting of 1 no 100 KVA Distribution Transformer in ExgKPudur SSII 100 100KVA and 6 other works in AE OM KILPALLIPET section
2023_EB_293286_1
EE04121_8
Open Tender
Electrical Works
Works
180 days
Kilpallipet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
3 Apr 2023
7 Mar 2023
18 Mar 2023
7 Mar 2023
17 Mar 2023
7 Mar 2023
Amount
Excavation and Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual with Base Plate.
Excavation and Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual with base plate.
Excavation and Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc.
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet
Fixing of LT 3 Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of 11 KV pin & Insulator
Fixing of 11KV Disc
Fixing of LT Pin & Insulator
Fixing of LT Shackle
Aluminum Knob
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor /AB Cable upto 7/3.35mm ACSR. (route length)
Paving and stringing of conductors of sizes 7/2.59 mm ACSR (route length)
Erection of Distribution transformer at structures above 25KVA to 100KVA
ERECTION of Single Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of 11 KV GOS and HG Fuse, Structure Earthing complete , Pole concreting (2' x 2' x 6') for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:2:4 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pipe including erection of cement collar and painting of pole with Distember (paint and earth bit collar to be supplied by contractor) (without centre support)
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM
Transporting of Distribution Transformer / Line materials from Sub stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Transporting of Distribution Transformer from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading of DT upto 100KVA
Loading/Unloading of variouse size of REC, RCC,PSC Poles upto 8.0m length
Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length
Loading/Unloading of line material
Manufacturing of earth pipe clamps for structure including drilling and welding of clamps.
Drilling of hole in channel only 3/4" & 1" per hole
Open type side arm stud, cutting, drilling holes
Alteration of clamp
Tree cutting
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .