Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.8 LAccepted-AOC | ₹6.8 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹6.9 L+₹14,827 (2.18%)Rejected-Finance | ₹6.9 L+₹14,827 (2.18%) | 2 | Rejected-Finance L-2 |
Tender Value
₹8.5 L
EMD Value
₹16,946
Closing Date
6 Jun 2026, 6:00 pmClosed
Executive Enginee
Executive Engineer, Capital Project Division No. 2, P.H.E.D. Bhopal
Cleaning of weeds from facultative Pond i/c grass and surface dressing work in the compound at Gondarmau Sewage Treatment Plant , Bhopal
2026_PHED_509789_1
41/22.05.2026
Open Tender
Civil Works - Others
Percentage
30 days
bhopal
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,000
₹16,946
2 Sept 2026
23 May 2026
8 Jun 2026
23 May 2026
6 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning of weeds from facultative Pond i/c grass and surface dressing work in the compound at Gondarmau Sewage Treatment Plant , Bhopal | |||||
| 1.01 | Removing of all weeds and other growth with roots i/c refused material such as polythene, cloths, algae etc. from facultative pond of STP and disposal up to 50 mtr lead and 1.5 mtr lift as directed by Engineer in Charge including all required T&P, boat with boatman, bamboo, plunger, cutter, bucket, rope etc. and all safety equipments such as safety belt, gas mask , oxygen cylinder etc.
( PHE USOR wef. 01.09.2023 It. No. 29.34 P.No.380)
Pond No. 01 = 122.50x70.00=8575.00 sqm
Pond No. 02= 84.50x70.00= 5915.00 Total Qty 14490.00 Sqm | 14,490 | sqm | 30 | ₹4,34,700 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplingsof girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a stance of 50 m out side the periphery of the area cleared.
( PHE USOR wef. 01.09.2023 It. No. 15.2 P.No. 257)
550x10= 5500 sqm+420x12=5040 sqm+230x15=3450 sqm Total 13990.00 sqm | 13,990 | Per 100 Sqm | 6.85 | ₹95,831.5 |
| 1.03 | Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kind of soil
( PHE USOR wef. 01.09.2023 It. No. 15.1 P.No. 257)
70x40=2800+60x35=2100 sqm +50x30=1500 sqm
Total 6400 sqm | 6,400 | Per 100 Sqm | 13.29 | ₹85,056 |
| 1.04 | Carriage of desilted sludge & other material from sewage components by mechanical transport including loading unloading & stacking etc.
( PHE USOR wef. 01.09.2023 It. No. 29.35.2 P.No. 383 and Corrigendum no. 1 Dt. 16-08-2024 )
Qty. = 14490.00 x0.1=1449.00 cum
(-) 70 % of 1449.00 for air voides +shrincage= 434.70cum | 434.7 | cum | 533 | ₹2,31,695.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.06 MB
BOQ_614007.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .