Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹30,000
Closing Date
27 Jul 2026, 3:00 pmClosed
BARBIGHA MUNICIPAL COUNCIL
EXECUTIVE OFFICER
SARMERA ROAD BARBIGHA
MR. RAMAN KUMAR
EXECUTIVE OFFICER
CONSTRUCTION OF COMMUNITY HALL IN WARD NO. 08 , UNDER NAGAR PARISAD BARBIGHA,SHEIKHPURA.( GROUP- 04)
136415
NIT 06/2026-27 GR- 04
Open Tender
CIVIL
Sheikhpura
• REGISTRATION
• PAN
• GST
• AS PER NIT
CIVIL
PERCENTAGE
L1
1
4 documents required · 4 mandatory
₹2,500
Processing Fee: 1180
₹30,000
NAGAR PARISHAD BARBIGHA OFFICE
18 Jul 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
20 Jul 2026
BOQ FOR CONSTRUCTION OF COMMUNITY HALL IN WARD NO. 08 , UNDER NAGAR PARISAD BARBIGHA,SHEIKHPURA.
Sl. No. Item no. Item of Work Quantity Unit Rate Amount
1 2.8 Earth work excavation in foundation trenches. 4.97 m3 383.70 1906.99
2 20.3.1 Boring Cost in Citu 300 mm dia under single ranmud 54.88 m 2334.40 128111.87
4 2.8 Local Sand Filling. 27.50 m3 287.30 7900.75
7 6.1.12A 100A B/W in Cm (1:4) in foundation 4.92 m3 5017.90 24688.07
8 5.3+5.33 B.4 R.C.C. (M20) in band lintal, beam, chajja, stair, Stair case, roof slab. 14.56 m3 5719.70 83278.83
10 6.1.12A+6.3A Prov. 100A B/W in C.M. (1:4) in super Structure 37.04 m3 5860.10 217058.10
12 13.13 +13.36.5 20mm C.P.(1:3) with water proof materials 64.04 m2 240.40 15395.22
13 13.24.1 6mm C.P(1:3) in ceiling with Stair. 67.80 m2 131.30 8902.14
16 9.1.2 Prov. Wood work in fram of door and window 0.40 m3 95670.70 38268.28
17 9.20.1 Prov. And fixing ISI marked flush door shutter decorative type both side 35 mm thick. 7.93 m2 2845.60 22565.61
18 9.5.3.2 Prov. And fixing panneled shutter in window. 5.43 m2 2445.80 13280.69
20 9.53 Hold fast 40 cm long 48.00 each 130.00 6240.00
21 9.62.1 Prov. and fixing M.S. sliding door bolts 300x16mm. 4.00 each 169.00 676.00
22 9.63.3 Prov. and fixing tower bolts 150x10mm. 20.00 each 48.40 968.00
23 9.57.3 Prov. and fixing butt hengs 75x47x1.70mm. 24.00 each 23.70 568.80
24 9.66.1 Prov. and fixing M.S. Handle 125 mm. 20.00 each 32.40 648.00
25 9.101.2 Prov. and fixing Alluminium twin rubber foor door stoper. 4.00 each 60.80 243.20
27 11.23.2.1 Prov. Marble stone flooring
Vide Item no. (26) +open+step 64.87 m2 64.87 m2 1703.40 110499.56
28 2.29.1 surface dresing 1.49 m2 1355.40 2019.55
29 13.81.3 +13.82.1 Painting with ready mixed paint over a coats of steel primer. 16.73 m2 118.10 1975.81
30 13.81.1 +13.82.2 Painting with ready mixed paint over a coats of wood primer. 16.73 m2 124.70 2086.23
32 5.22.7.B T.M.T. Reinforcement 2625 kg 92.60 243075.00
33 5.9 Centering and shuttering
(iv)5.9.20 Roof slab, landing, chajja,Roof with stair room 57.91 m2 544.40 31526.20
34 Carraige of Materials
(iv) Stone chips 30 km 25.60 m3 667.67 17092.35
35 Extra Cost of Materials
(ii) Cement 19.15 MT 18.73 358.68
36 13.45.1 Finishing wall withtexture exterior paint over a coat of primer. 456.46 m2 215.20 98230.19
FOR SEIGNIORAGE FEE
(iv) Stone chips 30 km 25.60 m3 70.63 1808.13
A+B Total :- 1459687.48
Electrification 39905.68
Say Total 1,499,600.00
BOQ FOR CONSTRUCTION OF COMMUNITY HALL IN WARD NO. 08 , UNDER NAGAR PARISAD BARBIGHA,SHEIKHPURA.
Sl. No. Item no. Item of Work Quantity Unit Rate Amount
1 2.8 Earth work excavation in foundation trenches. 4.97 m3 383.70 1906.99
2 20.3.1 Boring Cost in Citu 300 mm dia under single ranmud 54.88 m 2334.40 128111.87
4 2.8 Local Sand Filling. 27.50 m3 287.30 7900.75
7 6.1.12A 100A B/W in Cm (1:4) in foundation 4.92 m3 5017.90 24688.07
8 5.3+5.33 B.4 R.C.C. (M20) in band lintal, beam, chajja, stair, Stair case, roof slab. 14.56 m3 5719.70 83278.83
10 6.1.12A+6.3A Prov. 100A B/W in C.M. (1:4) in super Structure 37.04 m3 5860.10 217058.10
12 13.13 +13.36.5 20mm C.P.(1:3) with water proof materials 64.04 m2 240.40 15395.22
13 13.24.1 6mm C.P(1:3) in ceiling with Stair. 67.80 m2 131.30 8902.14
16 9.1.2 Prov. Wood work in fram of door and window 0.40 m3 95670.70 38268.28
17 9.20.1 Prov. And fixing ISI marked flush door shutter decorative type both side 35 mm thick. 7.93 m2 2845.60 22565.61
18 9.5.3.2 Prov. And fixing panneled shutter in window. 5.43 m2 2445.80 13280.69
20 9.53 Hold fast 40 cm long 48.00 each 130.00 6240.00
21 9.62.1 Prov. and fixing M.S. sliding door bolts 300x16mm. 4.00 each 169.00 676.00
22 9.63.3 Prov. and fixing tower bolts 150x10mm. 20.00 each 48.40 968.00
23 9.57.3 Prov. and fixing butt hengs 75x47x1.70mm. 24.00 each 23.70 568.80
24 9.66.1 Prov. and fixing M.S. Handle 125 mm. 20.00 each 32.40 648.00
25 9.101.2 Prov. and fixing Alluminium twin rubber foor door stoper. 4.00 each 60.80 243.20
27 11.23.2.1 Prov. Marble stone flooring
Vide Item no. (26) +open+step 64.87 m2 64.87 m2 1703.40 110499.56
28 2.29.1 surface dresing 1.49 m2 1355.40 2019.55
29 13.81.3 +13.82.1 Painting with ready mixed paint over a coats of steel primer. 16.73 m2 118.10 1975.81
30 13.81.1 +13.82.2 Painting with ready mixed paint over a coats of wood primer. 16.73 m2 124.70 2086.23
32 5.22.7.B T.M.T. Reinforcement 2625 kg 92.60 243075.00
33 5.9 Centering and shuttering
(iv)5.9.20 Roof slab, landing, chajja,Roof with stair room 57.91 m2 544.40 31526.20
34 Carraige of Materials
(iv) Stone chips 30 km 25.60 m3 667.67 17092.35
35 Extra Cost of Materials
(ii) Cement 19.15 MT 18.73 358.68
36 13.45.1 Finishing wall withtexture exterior paint over a coat of primer. 456.46 m2 215.20 98230.19
FOR SEIGNIORAGE FEE
(iv) Stone chips 30 km 25.60 m3 70.63 1808.13
A+B Total :- 1459687.48
Electrification 39905.68
Say Total 1,499,600.00
BOQ FOR CONSTRUCTION OF COMMUNITY HALL IN WARD NO. 08 , UNDER NAGAR PARISAD BARBIGHA,SHEIKHPURA.
Sl. No. Item no. Item of Work Quantity Unit Rate Amount
1 2.8 Earth work excavation in foundation trenches. 4.97 m3 383.70 1906.99
2 20.3.1 Boring Cost in Citu 300 mm dia under single ranmud 54.88 m 2334.40 128111.87
4 2.8 Local Sand Filling. 27.50 m3 287.30 7900.75
7 6.1.12A 100A B/W in Cm (1:4) in foundation 4.92 m3 5017.90 24688.07
8 5.3+5.33 B.4 R.C.C. (M20) in band lintal, beam, chajja, stair, Stair case, roof slab. 14.56 m3 5719.70 83278.83
10 6.1.12A+6.3A Prov. 100A B/W in C.M. (1:4) in super Structure 37.04 m3 5860.10 217058.10
12 13.13 +13.36.5 20mm C.P.(1:3) with water proof materials 64.04 m2 240.40 15395.22
13 13.24.1 6mm C.P(1:3) in ceiling with Stair. 67.80 m2 131.30 8902.14
16 9.1.2 Prov. Wood work in fram of door and window 0.40 m3 95670.70 38268.28
17 9.20.1 Prov. And fixing ISI marked flush door shutter decorative type both side 35 mm thick. 7.93 m2 2845.60 22565.61
18 9.5.3.2 Prov. And fixing panneled shutter in window. 5.43 m2 2445.80 13280.69
20 9.53 Hold fast 40 cm long 48.00 each 130.00 6240.00
21 9.62.1 Prov. and fixing M.S. sliding door bolts 300x16mm. 4.00 each 169.00 676.00
22 9.63.3 Prov. and fixing tower bolts 150x10mm. 20.00 each 48.40 968.00
23 9.57.3 Prov. and fixing butt hengs 75x47x1.70mm. 24.00 each 23.70 568.80
24 9.66.1 Prov. and fixing M.S. Handle 125 mm. 20.00 each 32.40 648.00
25 9.101.2 Prov. and fixing Alluminium twin rubber foor door stoper. 4.00 each 60.80 243.20
27 11.23.2.1 Prov. Marble stone flooring
Vide Item no. (26) +open+step 64.87 m2 64.87 m2 1703.40 110499.56
28 2.29.1 surface dresing 1.49 m2 1355.40 2019.55
29 13.81.3 +13.82.1 Painting with ready mixed paint over a coats of steel primer. 16.73 m2 118.10 1975.81
30 13.81.1 +13.82.2 Painting with ready mixed paint over a coats of wood primer. 16.73 m2 124.70 2086.23
32 5.22.7.B T.M.T. Reinforcement 2625 kg 92.60 243075.00
33 5.9 Centering and shuttering
(iv)5.9.20 Roof slab, landing, chajja,Roof with stair room 57.91 m2 544.40 31526.20
34 Carraige of Materials
(iv) Stone chips 30 km 25.60 m3 667.67 17092.35
35 Extra Cost of Materials
(ii) Cement 19.15 MT 18.73 358.68
36 13.45.1 Finishing wall withtexture exterior paint over a coat of primer. 456.46 m2 215.20 98230.19
FOR SEIGNIORAGE FEE
(iv) Stone chips 30 km 25.60 m3 70.63 1808.13
A+B Total :- 1459687.48
Electrification 39905.68
Say Total 1,499,600.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 06 2026-27.pdf
NIT • 4.02 MB
PAPER.jpg
NIT • 9.45 MB
Corrigendum 06 2026-27.pdf
NIT • 0.43 MB
GR 04.xlsx
NIT • 0.02 MB
NIT 06 2026-27.pdf
NIT • 4.02 MB
PAPER.jpg
NIT • 9.45 MB
GR 04.xlsx
NIT • 0.02 MB
Corrigendum 06 2026-27.pdf
NIT • 0.43 MB
GR 04.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .