| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 CrAccepted-AOC | ₹43.4 Cr Quoted ₹45.6 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
₹43.4 Cr
EMD Value
₹21.7 L
Closing Date
10 Sept 2024, 6:00 pmClosed
Superintending Engineer PMGSY Thane
Office of the Superintending Engineer PMGSY Thane
RD-THA-A 135 Total-15 works A) 6 works in Wada district B) 9 works in Shahapur district
2024_MMGSY_1080048_1
MMGSY/THA/TWT/29/24-25/3rdcall
Open Tender
Civil Works - Roads
Percentage
720 days
Shahapur/Wada
Please refer Tender documents.
7 documents required · 7 mandatory
₹29,500
₹21.7 L
3 Jun 2026
3 Sept 2024
11 Sept 2024
3 Sept 2024
10 Sept 2024
3 Sept 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A) Garagon Dabhon road Ch 0/000 to 5/020 Block-Wada District- Palghar | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means (A) In area of non-thorny jungle | 1 | Hectare | - | - |
| 1.02 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means (B) In area of thorny jungle | - | Hectare | - | - |
| 1.03 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (B) Rubble Stone Masonry in Cement Mortar | 1 | Cubic Meter | - | - |
| 1.04 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) Upto 600 mm dia Hume pipe | - | Running Meter | - | - |
| 1.05 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (B) Above 600 mm to 900 mm dia Hume pipe | - | Running Meter | 1 | - |
| 1.06 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | Square Meter | - | - |
| 1.07 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1 | Cubic Meter | - | - |
| 1.08 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 1 | Cubic Meter | - | - |
| 1.09 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 1 | Cubic Meter | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD135.pdf
Tender Documents • 2.16 MB
BOQ_1884658.xls
BOQ • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .