Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC AT NUAMANTRI PO ATHAMALLIK DIST ANGUL 759125 | ATHAMALLIK | ANGUL | ODISHA | 759125 | ₹7.7 Cr | L1 | Accepted-AOC Winner of the transparent lottery |
| 2 | L1₹7.7 CrRejected-AOC AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹7.7 Cr | L1 | Rejected-AOC Disqualify in transparent lottery |
| 3 | L1₹7.7 CrRejected-AOC AT PO DERANG VIA KANIHA ANGUL ODISHA INDIA 759117 | ANGUL | ANGUL | ODISHA | 759117 | ₹7.7 Cr | L1 | Rejected-AOC Disqualify in transparent lottery |
| 4 | L1₹7.7 CrRejected-AOC HULURISINGHA CHHAK ANGUL | ANGUL | ANGUL | ODISHA | ₹7.7 Cr | L1 | Rejected-AOC Disqualify in transparent lottery |
| 5 | L1₹7.7 CrRejected-AOC VILLAGE DHAURAPALI P O P S KISHORENAGAR DIST ANGUL PIN 759122 | ANGUL | ANGUL | ODISHA | 759122 | ₹7.7 Cr | L1 | Rejected-AOC Disqualify in transparent lottery |
Tender Value
₹9.1 Cr
EMD Value
₹9.1 L
Closing Date
21 Nov 2025, 5:00 pmClosed
CCE Dhenkanal R and B Circle Dhenkanal
CCE Dhenkanal R and B Circle Dhenkanal
Improvement to Boinda-Ichhapur via Padampur road from 0/000 km to 5/535 km in the district of Angul under State Plan
2025_EICCL_120927_2
CCE DKL R and B/10-2025-26
Open Tender
Civil Works - Roads
Percentage
270 days
Angul
Please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹9.1 L
Yes
16 Apr 2026
7 Nov 2025
24 Nov 2025
7 Nov 2025
21 Nov 2025
7 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works Latest Revision & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 36,611.49 | Sqm | 8.45 | ₹3,09,367.09 |
| 2 | Scarifing the existing bituminous road surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000 meters as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause501.8.3.2 of MoRT&H Specifications for Road and Bridge works (latest Revision) and including cost of all labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 18,313.5 | Sqm | 6.03 | ₹1,10,430.41 |
| 3 | Reworking the scarified bituminous surface suitably after supplimenting the base materials with sand and compacting finished surface as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 501.8.3.2 of MoRTH Specification for Road and Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc. complete and including cost of all labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 18,313.5 | Sqm | 22.12 | ₹4,05,094.62 |
| 4 | Earthwork in excavation for road way in all kinds of soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, setting out, dressing of section to correct line, level, grade and camber transporting to embankment site within all lifts and lead upto 1000mtr., utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Cum | 74.79 | - |
| 5 | Loosening to a depth of 150mm, levelling and compacting original ground supporting embankment/ sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road and Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc. complete and including cost of all labour, T&P, etc. complete and as per direction of Engineer-in-charge. | 2,848.36 | Cum | 36.04 | ₹1,02,654.89 |
| 6 | Construction of embankment with material deposited at site from road way cutting & excavation from drain & foundation of other structures graded & complete to meet the requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 7,211.52 | Cum | 35.83 | ₹2,58,388.76 |
| 7 | Construction of embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site,spreading, grading to required slope and compacting at OMC by Vibratory Roller to meet the requirement of Table-300.2 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 19,316.94 | Cum | 203.79 | ₹39,36,599.2 |
| 8 | Construction of granular Sub-base by providing Coarse graded Granular sub-base Grading-VI material as per table 400-1 ,spreading in unifrom layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with vibratory roller to achieve the desired density as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for road & Bridge works(latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 4,846.63 | Cum | 1,990.18 | ₹96,45,666.09 |
| 9 | Providing wet mix macadum using crushed stone aggregates as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for road & Bridge works(latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. | 5,127.8 | Cum | 2,306.7 | ₹1,18,28,296.26 |
| 10 | Providing and applying Primer coat with Slow setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion @ 0.20 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 27,397 | Sqm | 35.37 | ₹9,69,031.89 |
stage.html
html • 0.07 MB
technical_562727.pdf
techsummary_562727.pdf
finance_562727.pdf
BOQ Comparative Chart
xlsx
finsummary_562727.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
DTCN_Boinda_Ichhapur.pdf
Tender Documents • 2.71 MB
BOQ_562727.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .