Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | -19.99% | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹34.8 L (16.1%)Admitted-Finance | -7.11% | ₹2.5 Cr+₹34.8 L (16.1%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹40.5 L (18.7%)Admitted-Finance | -5.00% | ₹2.6 Cr+₹40.5 L (18.7%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
3 Jul 2026, 4:00 pmClosed
Executive Engineer
Mini Sectt Bandipore
Permanent restoration of the Flood damaged infrastructure of various Urban and Rural water supply schemes of Bandipora including allied augmentation works
2026_IFC_313054_1
E-NIT No 03 of 2026-2027
Open Tender
Civil Works
Percentage
120 days
Bandipore
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,500
Yes
Executive Engineer
₹5.4 L
Yes
SE Office Sopore
25 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
3 Jul 2026
20 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 381.37 | cum | 479.3 | ₹1,82,790.64 |
| 2 | Ordinary Rock | 163.32 | cum | 924.8 | ₹1,51,038.34 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,463.3 | cum | 187.3 | ₹2,74,076.09 |
| 4 | Ordinary Rock | 258.26 | cum | 392.8 | ₹1,01,444.53 |
| 5 | Hard Rock (Blasting Prohibited) | 14.53 | cum | 1,128.75 | ₹16,400.74 |
| 6 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 26.21 | cum | 592.9 | ₹15,539.91 |
| 7 | Ordinary Rock | 11.24 | cum | 940.3 | ₹10,568.97 |
| 8 | Providing, laying and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15 mm dia. nominal bore | 1,031.25 | mtr | 179.2 | ₹1,84,800 |
| 9 | 20 mm dia. nominal bore | 1,737.5 | mtr | 227.9 | ₹3,95,976.25 |
| 10 | 25 mm dia. nominal bore | 1,530.1 | mtr | 311.95 | ₹4,77,314.69 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1013109.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .