Tender Value
₹42.0 L
EMD Value
₹43,000
Closing Date
10 Dec 2019, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA DINDIGUL
THE PROJECT DIRECTOR DRDA DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019 - 2020 in Dindigul District TN-05-151Vadamadurai block
2019_RDTN_149945_1
Roc.No.6271-A11-2019 TN-05-151
Open Tender
Civil Works - Water Works
Item Rate
180 days
DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019 - 2020 in Dindigul District TN-05-151Vadamadurai block
4 documents required · 4 mandatory
₹0
₹43,000
DIDDIGUL
22 Jan 2020
2 Dec 2019
10 Dec 2019
2 Dec 2019
10 Dec 2019
4 Dec 2019
4 Dec 2019
Amount
Part 1 : Deepening and strengthening the bund of Pakkermeeran kulam in Velvarkottai Estimate Amount Rs.7.56 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Surplus Weir
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Filling the carted river sand including cost and conveyance of filling charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Deepening and strengthening the bund of Sengulam in Velvarkottai Estimate Amount Rs.9.56 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Surplus Weir
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Filling the carted river sand including cost and conveyance of filling charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Deepening and strengthening the bund of Mandaikulam in Rajagoundanpatty Estimate Amount Rs.4.15 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Surplus Weir
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
POINTING 1:3 (RR Masonry work) mix including cost and conveyance of all materials to site and all labour charges etc., complete
Plastering in cement morter 1:5 mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4 : Deepening and strengthening the bund of Vellavaden chetti kulam in Kanapadi Estimate Amount Rs.5.61 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Repairs to Weir
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
POINTING 1:3 (RR Masonry work) mix including cost and conveyance of all materials to site and all labour charges etc., complete
Plastering in cement morter 1:5 mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 5 : Deepening and strengthening the bund of Chettikulam in Padiyur Estimate Amount Rs.3.00 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 6 : Deepening the pond and strengthening the bund of kuttaikulam in Thennampatty Estimate Amount Rs.1.10 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 7 : Deepening the pond and strengthening the bund of Rajathottam in Paganatham Estimate Amount Rs.1.22 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 8 : Deepening the pond and strengthening the bund of Kanakkankulam in Paganatham Estimate Amount Rs.1.46 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 9 : Deepening the pond and strengthening the bund of Karungalandikulam in Paganatham Estimate Amount Rs.1.22 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 10 : Deepening the pond and strengthening the bund of Vallikaradu in Velayuthampalayam Estimate Amount Rs.0.95 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 11 : Deepening the pond and strengthening the bund of Kannimarkulam in Velayuthampalayam Estimate Amount Rs.6.19 lakhs
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioing during farming bunds when earth mooving machineries, lorries and rollers are used for consolidaion
Construction of Surplus Weir
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Filling the carted river sand including cost and conveyance of filling charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for Solid Apron.
Provision for Name board
S VELLAISAMY CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .