Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC PLOT NO 67 SECTOR 7 KOPARKHAIRANE NAVI MUMBAI 400 709 | NAVI MUMBAI | THANE | MAHARASHTRA | 400709 | ₹1.0 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 CrRejected-AOC | ₹1.3 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical CHENNAI | - | - | Rejected-Technical Technically disqualified due to non-submission of PQC documents,towards relevant similar work order |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified due to non-submission of HSE PQC documents |
| Sl No | Description | Qty | Unit | Bijay Associates Private Limited | SOUTHERN ENGINEERS AND CORROSION CONTROLS |
|---|---|---|---|---|---|
| 1.00PART-A (Tanks & Chimney) | |||||
| 1.10 | Refrigerated Storage tank Shell GI Cladding sheets Re-Painting work (3000 sq.mtr/tank approx x 2tanks) with all tools, tackles using Scaffolding(or)Rope access as per scope of work. | 1 | LS | 34,11,833.75 ₹40.3 L | 42,90,000 ₹50.6 L |
| 1.20 | IPPL LOGO & Letter Painting work-2tanks SR-01-01 /02 Front & Back side with all tools, tackles using Scaffolding(or)Rope access as per scope of work. | 1 | LS | 2,26,459.2 ₹2.7 L | 2,20,000 ₹2.6 L |
| 1.30 | SR-01-01 Butane tank top intersection portion Hot insulation - Supply and application of 100mm LRB matress with 22 SWG Aluminium sheet and all tools, tackles using Scaffolding (or) Rope access as per scope of work.. | 150 | Sq.Mtr | 2,56,200 ₹3.0 L | 3,30,000 ₹3.9 L |
| 1.40 | Refrigerated Storage Tank Structures welding joint corroded portions Painting touch up work - Cleaning, Degreasing the exterior surface corroded portion chipping of rust with brass scrapper, surface preparation to St-2, applying only 1 coat protectomastic primer (100-125micron), 1 coat of High Build Epoxy MIO intermediate coat (100-125micron) and applying 1 coats of PU Finish paint (40 micron) with all tools, tackles, including scaffolding/rope access/boatswain chair. | 300 | Sq.Mtr | 79,200 ₹93,456 | 84,150 ₹99,297 |
| 1.50 | SR-01-02 Propane Tank Shell damaged corrugated cladding sheet patch work - Fixing of spare corrugated sheets over and above the exsiting GI corrugated sheets in shell portion. Scope includes cutting and fixing of spare GI Corrugated GI sheets (Provided By IPPL) to required length with all tools, tackles using Scaffolding (or) Rope access as per scope of work. | 1 | LS | 24,400 ₹28,792 | 33,000 ₹38,940 |
| 1.60 | Boiler Chimney- Supply & Apply of Painting - Cleaning, Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2, applying 2 coats Heat resistant silicone aluminium paint 400 (40microns) IS 2339 with all tools, tackles, including scaffolding/rope access/boatswain chair. | 400 | Sq.Mtr | 1,70,000 ₹2.0 L | 1,76,880 ₹2.1 L |
| 2.00PART- B (Annual Rate Contract) | |||||
| 2.10 | Cross-Country Pipeline Structural Painting - Cleaning , Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2 /St-3 , Applying 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125micron) & 1coat of PU Smoke grey Finish paint(40 micron) with all tools, tackles using Scaffolding , Rope access/ Boatswain chair. | 5,200 | Sq.Mtr | 13,72,800 ₹16.2 L | 14,58,600 ₹17.2 L |
| 2.20 | Jetty Pipeline GI cladding sheet Painting - Cleaning , Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2/St-3 , applying paint as per system design in Table-1 with all tools, tackles using Scaffolding/ Rope access/ Boatswain chair. | 10,000 | Sq.Mtr | 34,40,000 ₹40.6 L | 40,04,000 ₹47.2 L |
Updated dates
Tender Value
₹89.5 L
EMD Value
₹89,500
Closing Date
19 Jan 2026, 6:00 pmClosed
DGM - Terminal
LPG Import/Export Terminal 143, Athipattu Village, NCTPS main road, chennai-120.
Composite Works of Re-Painting of Refrigerated Storage Tank Shell, Boiler Chimney and other facilities on Annual Rate Contract basis and Insulation Repair at Tank Top
2025_IPPL_260380_1
IPPL/ENN/PT-46/2025-26
Open Tender
Paint / Enamel Works
365 days
Ennore LPG Import Terminal
Refer SCC
2 documents required · 2 mandatory
₹0
₹89,500
Yes
Online VC
11 Apr 2026
24 Dec 2025
20 Jan 2026
24 Dec 2025
19 Jan 2026
6 Jan 2026
2 Jan 2026
PART-A (Tanks & Chimney)
Refrigerated Storage tank Shell GI Cladding sheets Re-Painting work (3000 sq.mtr/tank approx x 2tanks) with all tools, tackles using Scaffolding(or)Rope access as per scope of work.
IPPL LOGO & Letter Painting work-2tanks SR-01-01 /02 Front & Back side with all tools, tackles using Scaffolding(or)Rope access as per scope of work.
SR-01-01 Butane tank top intersection portion Hot insulation - Supply and application of 100mm LRB matress with 22 SWG Aluminium sheet and all tools, tackles using Scaffolding (or) Rope access as per scope of work..
Refrigerated Storage Tank Structures welding joint corroded portions Painting touch up work - Cleaning, Degreasing the exterior surface corroded portion chipping of rust with brass scrapper, surface preparation to St-2, applying only 1 coat protectomastic primer (100-125micron), 1 coat of High Build Epoxy MIO intermediate coat (100-125micron) and applying 1 coats of PU Finish paint (40 micron) with all tools, tackles, including scaffolding/rope access/boatswain chair.
SR-01-02 Propane Tank Shell damaged corrugated cladding sheet patch work - Fixing of spare corrugated sheets over and above the exsiting GI corrugated sheets in shell portion. Scope includes cutting and fixing of spare GI Corrugated GI sheets (Provided By IPPL) to required length with all tools, tackles using Scaffolding (or) Rope access as per scope of work.
Boiler Chimney- Supply & Apply of Painting - Cleaning, Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2, applying 2 coats Heat resistant silicone aluminium paint 400 (40microns) IS 2339 with all tools, tackles, including scaffolding/rope access/boatswain chair.
PART- B (Annual Rate Contract)
Cross-Country Pipeline Structural Painting - Cleaning , Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2 /St-3 , Applying 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125micron) & 1coat of PU Smoke grey Finish paint(40 micron) with all tools, tackles using Scaffolding , Rope access/ Boatswain chair.
Jetty Pipeline GI cladding sheet Painting - Cleaning , Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2/St-3 , applying paint as per system design in Table-1 with all tools, tackles using Scaffolding/ Rope access/ Boatswain chair.
Pipeline Painting - Cleaning, Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2 /St-3, Applying 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125 micron) & 1coat of PU Finish paint(40 micron) with all tools, tackles , including Scaffolding , Rope access/ Boatswain chair.
Process and Utility area Painting including Small Bore Piping (Size 1" and Below) - Cleaning, Degreasing the exterior surface corroded portion chipping of rust with brass scrapper, surface preparation to St-2, applying only 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125micron) for the corroded portion only and applying 1 coat of PU Finish paint (40-50 micron) for 100% Area with all tools, tackles, including scaffolding/rope access/boatswain chair.
Steam Pipeline Painting - Cleaning, Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2, applying 2 coats Heat resistant silicone aluminium paint 400(40microns) IS 2339 with all tools and tackles.
Supports Painting - Cleaning , Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2/St-3, applying 1 coat protectomastic primer(100-125micron), 2coats of Coal Tar Epoxy (200micron) with all tools, tackles.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_301135.pdf
techsummary_301135.pdf
finance_301135.pdf
BOQ Comparative Chart
xlsx
finsummary_301135.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
AnnexuresPT46202526.pdf
Tender Documents • 0.18 MB
STCPT46202526.pdf
Tender Documents • 7.39 MB
GTCPT46202526.pdf
Tender Documents • 0.28 MB
HSETCPT46202526.pdf
Tender Documents • 0.18 MB
BOQ_301135.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid