Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC C141 SUN CITY SECTOR 35 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹1.5 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.5 Cr+₹6.0 L (4.02%)Rejected-AOC | ₹1.5 Cr+₹6.0 L (4.02%) | L2 | Rejected-AOC Rejected |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
4 May 2021, 6:55 pmClosed
EE PHED No.1 Rohtak
JHAJJAR ROAD ROHTAK
Kabulpur Estimate for Providing FHTC Augmentation and repair of existing structure of Water Works and Laying of Distribution pipe line in village (Under JJM) Design Construction Erection Testing and commissioning of 050 MLD Water Treatment Plant Con
2021_HRY_170284_1
DNIT Approved vide SE Endst No. 870 dt. 28.04.2021
Open Tender
Civil Works
Works
450 days
VPO Kabulpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹2.4 L
Yes
16 May 2023
29 Apr 2021
5 May 2021
29 Apr 2021
4 May 2021
29 Apr 2021
Amount
Design, construction, testing & commissioning of 0.50 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVC/VAG) .
Pumping Machinery Raw water pump sets
Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame A) For Existing WATER WORKS
1400 LPM with 12 M. Head & 7.5 BHP For Raw Water
1400 LPM with 40 M. Head & 25 BHP For Clear Water
B) For Existing Boosting Station
600 LPM with 40 M. Head & 10 BHP For Clear Water
Supply erection testing and commissioning of exhaust fans each having a capacity of 45 cubic meters per minutes, complete with suitable G.I sheet Ducting in meter room and pump Chamber and energy for the sites. (Water Works)
Supply erection & testing of Ceiling fan of size 48" i/d (1200 mm) of reputed ISI make complete in all respect. (Water Works)
Supply erection, testing of light fitting including wire in the pump chamber with material upto 10 points including switch, button, plug, PVC conduict pipe & copper wire etc. as per approved specifications. (Water Works & B/Stn.)
Providing and fixing of insulated Rubber matting suitable for HKV installation 1 meter x 2 meter x 12 mm as per specification. (Water Works & B/Stn.)
S&S Tank
Providing & fixing suitable floating arme 250 mm size along with swivel bend as per required specifications approved by Engineer-in-Charge
Supply erection, and commissioning electric operated dewatering pump of 3 HP Kirlosker make complete from priming with wiring starters switches etc. also the required GI pipe (B Class) valves and sight glass etc. complete.
Supply and fixing of G.I Nipple 1/2" X 4" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Supply and fixing of G.I Socket 1/2" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Supply and fixing of G.I Elbow 1/2" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Operation and maintenance for complete scope of work mention in the DNIT ( Disinfection material supplied by the PHED) as per Schedule-IV for a period 5 year after 12 month during defect liablity period 3 months trial run will be charged to the A/Mtc estimate
Operation and maintenance during defect liability period (Operation only)
Operation and maintenance during 1st year after defect liability period
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
Lalit Kumar(GSTN-06ALGPB5309Q1ZY)
SAT NARIAN(GSTN-NA)
SAT NARIAN
SAT NARIAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .