| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹27.1 L+₹2.2 L (8.95%)Rejected-Finance | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹29.8 L+₹4.8 L (19.4%)Rejected-Finance NOT AVAILABLE | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹29.8 L+₹4.9 L (19.7%)Rejected-Finance GE W COLABA MUMBAI | CHANDRAPUR | MAHARASHTRA | 441205 | L4 | Rejected-Finance Being not lowest | |
| 5 | L5₹31.1 L+₹6.2 L (24.7%)Rejected-Finance | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | SHREE SHIV SHANKER ENTERPRISE L9 | SN CONSTRUCTION L4 | I.J Enterprises L8 | Shetty Construction Co L6 | SAHU AND SAHU CO. L3 | SRI SAIRAM COUNSTRUCTION L2 | Sri Krishna Construction L5 | Shivam Enterprises L1 | SHREE JAGDISH FURNITURE CO. L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone masonry built in cement mortar including all quoins, arches, pillars etc and including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 15 | Cum | 250 ₹3,750 | 200 ₹3,000 | 350 ₹5,250 | 250 ₹3,750 | 200 ₹3,000 | 200 ₹3,000 | 200 ₹3,000 | 10 ₹150 Lowest | 175 ₹2,625 |
| 2.00 | M&L for cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers by completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth of drains n.exc 0.90m, complete all as specified and directed. | 300 | RM | 150 ₹45,000 | 60 ₹18,000 | 90 ₹27,000 | 100 ₹30,000 | 20 ₹6,000 | 30 ₹9,000 | 50 ₹15,000 | 10 ₹3,000 Lowest | 65 ₹19,500 |
| 3.00 | Demolition of RCC of any description and in any position not otherwise specifically provided for incl reinforcement cut as required to facilitate demolition and separating scrap and cleaning of reinforcement and including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 10 | Cum | 350 ₹3,500 | 200 ₹2,000 | 400 ₹4,000 | 350 ₹3,500 | 200 ₹2,000 | 500 ₹5,000 | 500 ₹5,000 | 10 ₹100 Lowest | 888 ₹8,880 |
| 4.00 | M & L for type B-1 1:2:4 (20mm graded aggregate) slabs supported on walls beams and columns in floor,roofs, landing, balconies, canopies deck slabs and in shelves and the like, complete all as specified and directed. | 10 | Cum | 5,000 ₹50,000 | 4,000 ₹40,000 | 5,600 ₹56,000 | 4,000 ₹40,000 | 4,000 ₹40,000 | 6,500 ₹65,000 | 4,000 ₹40,000 | 2,000 ₹20,000 Lowest | 5,200 ₹52,000 |
| 5.00 | M& L for Mild steel bars 10mm dia TMT bar and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, complete all as specified and directed. | 500 | Kg | 90 ₹45,000 | 85 ₹42,500 | 85 ₹42,500 | 85 ₹42,500 | 100 ₹50,000 | 80 ₹40,000 Lowest | 85 ₹42,500 | 90 ₹45,000 | 80 ₹40,000 Lowest |
| 6.00 | M&L for form work to soffits of suspended slabs as roof slabs, floor slabs, landings ans similar work exceeding 200mm thick, complete all as specified and directed. | 100 | Sqm | 250 ₹25,000 Lowest | 250 ₹25,000 Lowest | 260 ₹26,000 | 350 ₹35,000 | 400 ₹40,000 | 280 ₹28,000 | 850 ₹85,000 | 250 ₹25,000 Lowest | 385 ₹38,500 |
| 7.00 | Demolition of Cement concrete of any description and in any position not otherwise speially provided for such as bottom and sides of drain etc including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 237.5 | Cum | 300 ₹71,250 | 200 ₹47,500 | 350 ₹83,125 | 400 ₹95,000 | 200 ₹47,500 | 200 ₹47,500 | 500 ₹1,18,750 | 10 ₹2,375 Lowest | 355 ₹84,312.5 |
| 8.00 | Taking down cement plaster on brick or stone walls etc incl raking out joints, hacking for key scrubbing down with water etc and including removing debris/rubbish materials off the site out side MoD land complete all as specified and directed. | 550 | Sqm | 10 ₹5,500 Lowest | 15 ₹8,250 | 35 ₹19,250 | 12 ₹6,600 | 20 ₹11,000 | 25 ₹13,750 | 15 ₹8,250 | 20 ₹11,000 | 27 ₹14,850 |
| 9.00 | M & L for PCC 1:2:4 type B-0 (using 12.5 mm graded stone aggregate) as in coping , bed concrete and all other similar work incluidng necessary formwork, complete all as specified and directed by Engineer- in-charge. | 10.35 | Cum | 5,000 ₹51,750 | 5,000 ₹51,750 | 6,500 ₹67,275 | 4,500 ₹46,575 | 4,000 ₹41,400 | 3,000 ₹31,050 Lowest | 4,000 ₹41,400 | 5,000 ₹51,750 | 5,200 ₹53,820 |
| 10.00 | Material & Labour for brick work with sub class 'B' bricks straight or curved on plan exc 6 m mean radius built in CM (1:6), complete all as specified and directed. | 15 | Cum | 3,500 ₹52,500 Lowest | 6,000 ₹90,000 | 4,900 ₹73,500 | 6,000 ₹90,000 | 6,000 ₹90,000 | 4,000 ₹60,000 | 4,500 ₹67,500 | 4,000 ₹60,000 | 5,100 ₹76,500 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
8 Jun 2026, 6:00 pmClosed
Kameshwar Prasad, IDSE, EE
GE (West), Colaba, Mumbai - 400 005
REPAIR TO AREA DRAINAGE, STORM DRAIN, PCC WORKS AND CERTAIN RELATED WORKS OF AREA-III UNDER AGE (B/R) CENTRAL OF GE (WEST) COLABA MUMBAI
2026_MES_766082_1
8250/E8
Open Tender
Civil Works
Item Rate
270 days
GE (West), Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹1 L
Yes
7 Aug 2026
18 May 2026
10 Jun 2026
18 May 2026
8 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone masonry built in cement mortar including all quoins, arches, pillars etc and including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 15 | Cum | - | - |
| 2 | M&L for cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers by completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth of drains n.exc 0.90m, complete all as specified and directed. | 300 | RM | 1 | ₹300 |
| 3 | Demolition of RCC of any description and in any position not otherwise specifically provided for incl reinforcement cut as required to facilitate demolition and separating scrap and cleaning of reinforcement and including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 10 | Cum | 2 | ₹20 |
| 4 | M & L for type B-1 1:2:4 (20mm graded aggregate) slabs supported on walls beams and columns in floor,roofs, landing, balconies, canopies deck slabs and in shelves and the like, complete all as specified and directed. | 10 | Cum | 3 | ₹30 |
| 5 | M& L for Mild steel bars 10mm dia TMT bar and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, complete all as specified and directed. | 500 | Kg | 4 | ₹2,000 |
| 6 | M&L for form work to soffits of suspended slabs as roof slabs, floor slabs, landings ans similar work exceeding 200mm thick, complete all as specified and directed. | 100 | Sqm | 5 | ₹500 |
| 7 | Demolition of Cement concrete of any description and in any position not otherwise speially provided for such as bottom and sides of drain etc including removing debris/rubbish materials off the site out side MoD land, complete all as specified and directed. | 237.5 | Cum | 6 | ₹1,425 |
| 8 | Taking down cement plaster on brick or stone walls etc incl raking out joints, hacking for key scrubbing down with water etc and including removing debris/rubbish materials off the site out side MoD land complete all as specified and directed. | 550 | Sqm | 7 | ₹3,850 |
| 9 | M & L for PCC 1:2:4 type B-0 (using 12.5 mm graded stone aggregate) as in coping , bed concrete and all other similar work incluidng necessary formwork, complete all as specified and directed by Engineer- in-charge. | 10.35 | Cum | 8 | ₹82.8 |
| 10 | Material & Labour for brick work with sub class 'B' bricks straight or curved on plan exc 6 m mean radius built in CM (1:6), complete all as specified and directed. | 15 | Cum | 9 | ₹135 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_857968.xls
BOQ • 0.31 MB
8250TenderPages.pdf
Tender Documents • 1.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .