| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | L1 | Accepted-AOC Accepted. | |
| 2 | L2₹29.7 L+₹3.6 L (14.0%)Rejected-AOC | L2 | Rejected-AOC Rejected. | |
| 3 | L3₹30.5 L+₹4.4 L (17.0%)Rejected-AOC | L3 | Rejected-AOC Rejected. | |
| 4 | L4₹33.7 L+₹7.6 L (29.4%)Rejected-AOC | L4 | Rejected-AOC Rejected. | |
| 5 | L5₹33.9 L+₹7.9 L (30.2%)Rejected-AOC 8TH WAD BCM ROAD BANDIKERI KAMALAPUR BELLARY KARNATAKA 583221 | VIJAYNAGAR | KARNATAKA | 583221 | L5 | Rejected-AOC Rejected. |
Tender Value
Refer Docs
EMD Value
₹91,000
Closing Date
9 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/o the SA, ASI, Hampi Circle.
O/o the SA, ASI, Hampi Circle, Hospet-583201.
EXECUTION OF WORK FOR TENDER MW (CONS) TO PARVATHI AND KARTHIKEYA TEMPLE AT SANDUR BELLARY
2022_ASI_701580_1
SOUT/HAMP/BELL/PARV/11072468/
Open Tender
Civil Works
Works
180 days
SANDUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹91,000
Yes
BALLARI
11 Oct 2022
19 Jul 2022
10 Aug 2022
19 Jul 2022
9 Aug 2022
19 Jul 2022
19 Jul 2022 - 9 Aug 2022
22 Jul 2022
Amount
Sub Heading 1
Clearing and grubbing land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees grith up to 300 mm, removal of stumps of trees cut earlier and disposal of debris including removal and disposal of top organic soil not exceeding 150mm in thickness etc., complete all as per the direction of site – incharge.
Removal of water/de-silting from the pushkarni (ancient tank) including disposal of slit and rubbish, all as per the direction of site – incharge. The cleaning/removing shall consist following operations:- 1. Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. 2. Entire surface area of the pushkarni shall then scrubbed thoroughly with wire brush etc. and pressure washed with water, etc complete all as per the direction of site – incharge. (A. Removing the water in the tank all as per the direction of site – incharge.)
B. Cleaning the silt accumulated inside the tank and dispose the waste far away from the site all as per the direction of site – incharge.
Carefully dismantling and removing the stone members of the dislodged/sunken /undulated/out of plumb/ dilapidated stone steps after numbering & documentation and stacking them properly for re-use etc., by using hydraulic machinery, etc complete all as per the direction of site – incharge.
Carefully removal of weaken/ dead core earth /rubbles without causing any damage to the structure and disposing the unwanted stuff for working space etc., complete all as per the direction of site – incharge.
Re-filling the rear side cavity by gravel mixed with boulders including watering, consolidating, etc., complete all as per the direction of site – incharge.
Re-filling the rear side cavity by providing bed concrete in lime mortar for uniform flooring in ratio 1:1:1 for fixing of the stones slabs including watering, consolidating, etc complete all as per the direction of site – incharge.
Restoration/resetting of stone steps by using 50% new stones of size: 0.25 to 0.30 mtrs. and 0.60 mts to 0.80 mtrs width to a length of 1.00 mtrs. to 1.25 meters and 50% old stones as per original in lime surkhi mortar 1:1:1 including dressing, cutting, fixing, cost of materials and labour etc by using hydraulic machinery, etc complete all as per the direction of site – incharge.
Providing new granite stone blocks for a thickness of 0.25 to 0.30mtrs and 0.60mts to 0.80mtrs width to a length of 1.00mtrs to 1.25mtrs for steps including dressing, cutting as per the original, fixing the same with the help of hydraulic machinery cost of materials and labour etc complete all as per the direction of site – incharge.
Pointing to the stone masonry joints of stone steps in lime surki mortar 1:1:1 curing, colour pigment, cost of all materials and labours, etc complete all as per the direction of site – incharge.
Providing the 800 mm pathway/setback at the top side of the pushkarni by using the new granite stone flooring slabs of thickness 0.10 to 0.15 mtrs. and 0.40 to 0.60mtrs width to a length of 2.00mtrs to 2.50mtrs including dressing, providing proper gravel bedding of 10cms thick including curing and fixing the same with the help of hydraulic machinery cost of all materials and labours etc complete all as per the direction of site – incharge.
Providing the dry stone pitching with lime concrete for the outer surface of the pushkarni for stopping the land-sliding and arrest the rain water etc complete cost including cost of all materials and labours, etc complete.
Removing the dilapidated unused pump house situated at the bottom of the pushkarni including all charges, etc complete.
V Padbhanabhan
SRI RAGHAVENDRA CONSTRUCTION
G SARAVAN
G MURALI
B JAGANNATHASWAMY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .