Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L1 | Accepted-Finance As per terms and conditions | |
| 2 | L2₹1.1 L+₹5,945 (5.84%)Accepted-Finance MAIN CHOWK TABAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Accepted-Finance As per terms and conditions | |
| 3 | L3₹1.1 L+₹10,440 (10.3%)Accepted-Finance NOT AVAILABLE | L3 | Accepted-Finance As per terms and conditions |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
29 Sept 2020, 2:00 pmClosed
Executive Engineer
Executive Engineer Mechanical Irrigation Division Jammu
Strengthening to pumping machinery by repairs replacement of electro mechanical components and allied works installed at LIS Kothey kalyana new
2020_IFC_104639_1
MID/J/e-NIT/2020-21/48
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Kothey kalyana New
As per tender document
7 documents required · 7 mandatory
₹200
Executive Engineer Mech Irrigation Division Jammu
₹2,100
Yes
Jammu
23 Nov 2020
17 Sept 2020
30 Sept 2020
17 Sept 2020
29 Sept 2020
19 Sept 2020
17 Sept 2020 - 29 Sept 2020
18 Sept 2020
Amount
Shifting of 250 kva transformer by way of disconnecting of the electric transformer from the input and output power connections, lifting of electric transformer from its installed position by using manual labour, crane and then shifting to workshop by using carriage vehicle. Shifting back after carrying out repaired transformer to site. The job includes loading and un-loading of transformer at LIS Kothey kalyana new and workshop, manual labour, carriage charges of vehicle (to & fro), tools & tackles, hire charges of crane. (Complete job)
Strengthening to the pumping machinery by way of repairs to the 250 kva transformer. Complete dismantling of the 250 KVA transformer at workshop by way of extracting out the damaged coils, LT bushes, HT bushes, rubber gasket, copper nuts and bolts. Rewinding of all HT coils with standard gauge with proper insulation & taping. Reconditioning of 3 no’s LT leg coils using quality insulation material. Repairs to core of transformer by replacing the flashed core material. Heating to repaired transformer in oven to get required meager value. Properly cleaning the oil tank with scrubbers to remove all carbon deposits. Lowering of the coils inside the sump of the transformer. Providing and fitting of LT and HT bush rod sets, new insulator, new copper nuts and bolts. Refitting of the top cover of transformer by providing and fitting of new gasket sheet. Providing/ filling of 160 litres of fresh transformer oil in oil tank after filtering existing oil. Testing the continuity of each phase and secure all connection. The job includes the cost of materials, labour charges, testing on no load/ full load, tools and tackles used during the execution of job. (Complete job)
Replacement of HT fuse sets installed at 250 kva sub station of Kothey kalyana new by way of providing and fitting of HT fuse set on three incoming HT phases. Job includes replacement of HT conductors between HT link set and HT bush rods of transformer. Complete job includes cost of material, installation charges and skilled labour charges.
Rebate on Old Parts
GANPATI ELECTRICAL AND MECHANICAL WORKS
N B Engineering and Electric Works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .