Loading…
Loading…
Tender Value
₹93.4 L
EMD Value
₹1.9 L
Closing Date
9 Jul 2026, 2:00 pmDue tomorrow
EXECUTIVE ENGINEER
C/O JAL SHAKTI DIV UDHAMPUR
Permanent restoration of damaged infrastructure of WSS Baryalta Shatriari under SASCI 2026
2026_PHE_314088_1
e-NIT No. 22 of 2026-27
Open Tender
Civil Works - Others
90 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE ENGINEER
₹1.9 L
30 Jun 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 300.5 | Cum | 479.3 | ₹1,44,029.65 |
| 2 | Supply of stones | 1,008.43 | Cum | 700 | ₹7,05,901 |
| 3 | Dumping of stones in horizontol on level | 1,008.43 | Cum | 237.9 | ₹2,39,905.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 19.68 | Cum | 5,733.6 | ₹1,12,837.25 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 28.99 | Cum | 5,202.9 | ₹1,50,832.07 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 47.5 | Cum | 7,788.4 | ₹3,69,949 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 237.54 | Cum | 9,395.7 | ₹22,31,854.58 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 28,500 | Kg | 123.2 | ₹35,11,200 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns | 71.26 | Sqm | 286.35 | ₹20,405.3 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 723.44 | Sqm | 628.95 | ₹4,55,007.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_1016821.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid