Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹12.1 L+₹33,059.12 (2.80%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-The Bidder has submitted an application regarding not participating in further tender process due his medical emergency. |
Tender Value
₹11.0 L
EMD Value
₹11,020
Closing Date
22 Sept 2026, 5:00 pmClosed
Executive Officer, Balangir Municipality
Office of the Municipal Council, Balangir
Roof Shed Work
2026_ORULB_140869_16
BLGRMPTY/06(01-21)/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Balangir Municipality
Please refer Tender Documents
2 documents required · 2 mandatory
₹6,000
₹11,020
Yes
3 Oct 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all materials, labour, T&P for providing Mild Steel tubular posts and Trusses and base plates made out of ERW tubes, Grade YST 210 conforming to ISS no.1161/79 (3rd Revision) duly painted with emulsion paint over a coat of red oxide primer etc. complete | 63.22 | Qntl | 11,239.58 | ₹7,10,542.64 |
| 2 | Supplying fitting & fixing of Precoated Galvanized iron Profile sheet semi gloss of 1000mm width & total coated thickness 0.50mm in roof drilling hole in wind ties including fixing of ridges valleys, wind ties etc. complete including cost of sheet & all fitting. Roof Sheet Both Side Inclined Part | 644.96 | Sqm | 566.5 | ₹3,65,369.84 |
| 3 | RCC work of M20 grade with 20mm and downgraded black granite (Crusher broken) stone chips including watering curing and cost of all labour T&P etc complete. | 3.24 | Cum | 5,555.96 | ₹18,001.31 |
| 4 | Rigid smooth centering shuttering for C.C.work including all cost and as per specification etc complete | 32.4 | Sqm | 248.67 | ₹8,056.91 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_609535.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .