| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance AT KELUA PO MALANDA PS TIRTOL DIST JAGATSINGHPUR PIN 754136 | MALANDA | JAGATSINGHPUR | ODISHA | 754136 | L1 | Accepted-Finance L1 bidder quoted 14.99 percentage less | |
| 2 | L1₹2.0 CrAccepted-Finance | L1 | Accepted-Finance L1 bidder quoted 14.99 percentage less | |
| 3 | L1₹2.0 CrAccepted-Finance AT PROFESSORPARA PO COLLEGE SQUARE DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | L1 | Accepted-Finance L1 bidder quoted 14.99 percentage less | |
| 4 | L1₹2.0 CrAccepted-Finance AT SAUDIA PO SAUDIA PS BALICHANDRAPUR DIST JAJPUR | JAJPUR | JAJPUR | ODISHA | L1 | Accepted-Finance L1 bidder quoted 14.99 percentage less | |
| 5 | L1₹1.9 CrRejected-Finance PLOT NO 146 498 SHREE VIHAR PO PATIA PS CHANDRASEKHARPUR BHUBANESWAR KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | L1 | Rejected-Finance Not in accordance with Clause-2.6.5 Sub-Clause-II of DTNC |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
19 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Construction Engineer
O/o ChiefConstructionEngineer,CentralRWCircle,BBSR
Improvement to Mancheswar Balipada and Mancheswar Balipada (Missing Link) Road in the District of Khurda under MMSY-Improvement to Existing RD Road for the year 2025-26
2025_CERWI_122448_9
Tender Online C.C-30 of 2025
National Competitive Bid
Civil Works - Roads
Percentage
180 days
Bhubaneswar
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹2.3 L
Yes
25 Nov 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Construction
Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in –charge. | 9,840 | Sqm | 8.44 | ₹83,049.6 |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 6,210.23 | Cum | 201 | ₹12,48,256.23 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 76.08 | Cum | 50.4 | ₹3,834.43 |
| 4 | Providing and laying tack coat with penetration grade of bitumen emulsion (RS) of 0.20 Kg per Sqm after scraping cleaning the road surface including cost, conveyance royalty of all materials, T&P labour, hire charges of machinaries etc. complete as per Technical Specification Clause 503 of MOSRT&H and as per direction of the Engineer in charge. | 9,200.4 | Sqm | 13.36 | ₹1,22,917.34 |
| 5 | Providing and laying Bituminous Macadam with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction | 31.57 | Cum | 8,148.42 | ₹2,57,245.62 |
| 6 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete. | 230.01 | Cum | 10,226.56 | ₹23,52,211.07 |
| 7 | Fine dressing and turfing to the slopes of the road embankment with compact dub gross transported by mechanical means as per the direction of the E.I.C. | 4,920 | Sqm | 28.91 | ₹1,42,237.2 |
| 8 | Earth work in excavation of foundation & plinth in hard soil including levelling the bed etc complete as per the direction of Engineer in charge. | 1,178.68 | Cum | 276.89 | ₹3,26,364.71 |
| 9 | Providing and filling manually with selected sand in layers not exceeding 200mm thick including watering and compacting with all leads and lifts etc. For finished item of work as per Specification. | 1,088.11 | Cum | 743.35 | ₹8,08,846.57 |
| 10 | Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.
Foundation | 1,248.61 | Cum | 5,789.83 | ₹72,29,239.64 |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
Tendernotice_2.pdf
PDF • 4.41 MB
BOQ_569716.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .