| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 CrAccepted-AOC | ₹24.2 Cr | L1 | Accepted-AOC Ok |
| 2 | L2₹26.3 CrRejected-Finance 216 C SIVA COLONY MAYO LINK ROAD AJMER RAJASTHAN 305007 | AJMER | RAJASTHAN | 305007 | ₹26.3 Cr | L2 | Rejected-Finance NOT LOWEST |
| 3 | L3₹27.8 CrRejected-Finance K 99 LGF KALKAJI NEW DELHI 110 019 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110019 | ₹27.8 Cr | L3 | Rejected-Finance NOT LOWEST |
| 4 | L4₹27.9 CrRejected-Finance 17 1624A MUMDAMVELI KOCHI 682 507 | ERNAKULAM | KERALA | 682507 | ₹27.9 Cr | L4 | Rejected-Finance NOT LOWEST |
Tender Value
₹22 Cr
Closing Date
29 Jul 2021, 6:00 pmClosed
DG MAP
DG MAP KASHMIR HOUSE NEW DELHI 110011
CA NO DG MAP PH II PKG 37 ARMY AF R AND C 01 OF 2021 22 COMPLETION OF BALANCE WORK FOR CONSTRUCTION OF DWELLING UNITS INCLUDING ALLIED SERVICES FOR OFFRS AND JCOS OR AT KAMPTEE A PULGAON A NAGPUR AF
2021_MES_447481_1
NAGPUR KAMPTEE PULGAON
Open Tender
Civil Works
334 days
KAMPTEE PULGAON NAGPUR
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹3,000
Yes
DG MAP
Exempted
DG MAP KASHMIR HOUSE
23 Sept 2022
14 Jun 2021
2 Aug 2021
14 Jun 2021
29 Jul 2021
17 Jul 2021
15 Jun 2021 - 22 Jun 2021
24 Jun 2021
Amount
List of works & prices for Building Works, Schedule A, Part IA Note :- Scope of work in the items of Sch 'A' Part-IA, in this BOQ shall also include the balance works of devaiation orders. Please refer'Notes' to deviation order details' at Srl Page No 35 for further details.
KAMPTEE (ARMY)
Completion of Balance Work for Construction of block of four quarters for Major accommodation in double storey (DS), with RCC framed construction, foundations, Type ‘A’, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls, Pergola complete including servant quarters and Car garages all as specified and shown on drawings Excavation in any type of soil (normal soil) Depth of foundation 1.6M from natural ground level, Location Site Plan KMT-02
Block 47 (KMT 02) Completion of balance work as described in S. No 3. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure I Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure I
Completion of Balance Work for Construction of block of one quarter for Major accommodation in single storey (SS), with RCC framed construction, foundations, Type ‘C’, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls, Pergola complete including servant quarters and Car garages all as specified and shown on drawings Excavation in any type of soil (normal soil) Depth of foundation 1.6M from natural ground level, Location Site Plan KMT-02
Block 48 (KMT 02) Completion of balance work as described in S. No 4. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure II Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure II .
Completion of Balance Work for Construction of block of six quarters for OR accommodation in triple storey (TS), Type ‘A’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan KMT-04.
Block 17 (KMT 04) Completion of balance work as described in S. No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure III Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure III
Block 18 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure IV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure IV
Block 19 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure V Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure V
Block 21 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure VI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure VI .
Block 22 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position photograph of block is enclosed as Annexure VII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure VII .
Block 23 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure VIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure VIII
Block 25 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure IX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure IX .
Block 26 (KMT 04) Completion of balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure X Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure X
Block 27 (KMT 04) Completion of Balance work as descrbied in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XI
Block 28 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XII
Block 30 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XIII. Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XIII
Block 31 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XIV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XIV
Block 32 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XV
Block 34 (KMT 04) Completion of Balance work as described in S No 5.The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XVI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XVI
Block 35 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XVII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XVII
Block 36 (KMT 04) Completion of Balance work as described in S No 5. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XVIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XVIII
Completion of Balance Work for Construction of block of five quarters for OR accommodation in triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan KMT-04.
Block 20 (KMT 04) Completion of Balance work as described in S No 6. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XIX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XIX
Block 24 (KMT 04) Completion of Balance work as described in S No 6. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in positionand photograph of block is enclosed as Annexure XX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XX
Block 29 (KMT 04) Completion of Balance work as described in S No 6. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXI
Block 33 (KMT 04) Completion of Balance work as descrbied in S No 6. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXII
Block 37 (KMT 04) Completion of Balance work as described in S No 6. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXIII
Completion of Balance Work for Construction of block of six quarters for JCO accommodation in triple storey (TS), Type ‘A’, with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter shed, Pergoalas all as specified and shown on drawings, Excavation in any type of soil, Depth of foundation 1.6M from natural ground level, Location Site Plan KMT - 05.
Block 11 (KMT 05) Completion of Balance work as described in S No 7. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXIV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXIV
Block 12 (KMT 05) Completion of Balance work as described in S No 7. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXV on Page No 249 Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXV on Page No 249.
Block 13 (KMT 05) Completion of Balance work as described in S No 7. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXVI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXVI
Block 14 (KMT 05) Completion of Balance work as described in S No 7. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXVII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXVII
Completion of Balance Work for Construction of block of five quarters for JCO accommodation in triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan KMT-05.
Block 15 (KMT 05) Completion of Balance work as described in S No 8. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXVIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXVIII
Block 16 (KMT 05) Completion of Balance work as described in S No 8. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXIX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXIX
Completion of Balance Work for Construction of block of six quarters for JCO accommodation in triple storey (TS), Type ‘A’, with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter shed, Pergoalas all as specified and shown on drawings, Excavation in any type of soil, Depth of foundation 1.6M from natural ground level, Location Site Plan KMT - 07.
Block 56 (KMT 07) Completion of Balance work as described in S No 9. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXX
Block 57 (KMT 07) Completion of Balance work as described in S No 9. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXI
Completion of Balance Work for Construction of block of five quarters for JCO accommodation in triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan KMT-07.
Block 52 (KMT 07) Completion of Balance work as described in S No 10. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXII
Block 53 (KMT 07) Completion of Balance work as described in S No 10. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXIII
Block 54 (KMT 07) Completion of Balance work as described in S No 10. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXIV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXIV
Block 55 (KMT 07) Completion of Balance work as described in S No 10. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXV
Completion of Balance Work for Construction of block of five quarters for OR accommodation in triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan KMT-07.
Block 58 (KMT 07) Completion of Balance work as described in S No 11. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXVI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXVI
Block 59 (KMT 07) Completion of Balance work as described in S No 11. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXVII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXVII
NAGPUR (AIR FORCE)
Completion of Balance Work for Construction of block of six quarters for JCO Accommodation in Triple storey (TS), Type ‘A’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter garages Pergolas all as specified and shown on drawings, Excavation in any type of soil Depth of foundation 1.5M from natural ground level, Location Site Plan NGP-01.
Block 26 (NGP 01) Completion of Balance work as described in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXVIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXVIII
Block 27 (NGP 01) Completion of Balance work as described in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XXXIX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XXXIX
Block 29 (NGP 01) Completion of Balance work as described in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XL Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XL
Block 30 (NGP 01) Completion of Balance work as descrbied in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLI
Block 32 (NGP 01) Completion of Balance work as described in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLII
Block 33 (NGP 01) Completion of Balance work as described in S No 13. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLIII
Completion of Balance Work for Construction of block of five quarters for JCO Accommodation in Triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter garages Pergolas all as specified and shown on drawings, Excavation in any type of soil Depth of foundation 1.5M from natural ground level, Location Site Plan NGP-01.
Block 34 (NGP 01) Completion of Balance work as described in S No 14. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLIV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLIV
Completion of Balance Work for Construction of block of five quarters for OR accommodation in triple storey (TS), Type ‘B’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, hard standing, ATT, mosquito proofing, flyash brick masonry panel walls complete including Scooter shed Pergola all as specified and shown on drawings. Excavation in black cotton soil Depth of foundation 3.0M from natural ground level, Location Site Plan NGP 01.
Block 22 (NGP 01) Completion of Balance work as described in S No 15. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLV Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLV
Block 23 (NGP 01) Completion of Balance work as described in S No 15. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLVI Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLVI
Block 24 (NGP 01) Completion of Balance work as described in S No 15. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLVII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLVII
PULGAON (ARMY)
Completion of Balance Work for Construction of block of four quarters for Major Accommodation in Double storey (DS), Type ‘A’ with RCC framed construction, foundations, platforms, pavements, covered staircase, balconies, RCC Shelves, lofts, passages, built in furniture, plinth protection, ATT, mosquito proofing, flyash brick masonry panel walls complete including Car garages & Scooter garages Pergolas all as specified and shown on drawings, Excavation in any type of soil Depth of foundation 1.5M from natural ground level, Location Site Plan PGN-01.
Block 18 (PGN 01) Completion of Balance work as described in S No 17. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLVIII Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLVIII
Block 19 (PGN 01) Completion of Balance work as described in S No 17. The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position and photograph of block is enclosed as Annexure XLIX Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Annexure XLIX
Construction of garbage bins of brick masonry construction including foundation, steel gate, saucer drain, complete all as specified and as shown on drawings (Kamptee, Nagpur & Pulgaon). Kamptee (14 Nos), Nagpur (7 Nos) & Pulgoan (6 Nos). Excavation in any type of soil including black cotton soil.
Completion of Balance Work for : Construction of Guard Room with RCC framed structure with M-25 concrete RCC roop, ATT finishes etc. including toilet, black granite counter and verandah etc all as specified and shown on drawings, Excavation in any type of soil Depth of foundation 1.6M Site Location plan KMT-02. Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Anneuxre L
Completion of Balance Work for : Construction of Sentry Post with RCC wall and roof, masonry foundation all as specified and shown on drawings. Excavation in any type of soil Depth of foundation 1.6M Site Location plan KMT-02 Note: Contractor is adviced to visit at site and workout all the balance work in each respective Block and quote the lumpsum amount for balance work accordingly. However, the details of executed work and balance work have been shown in yardstick of respective block in Anneuxre L1
List of works & prices for Building Works, Schedule A, Part IB
List of works & prices for Internal Water Supply. Schedule A, Section II
List of works & prices for Internal Electrification. Schedule A, Section III
List of works & prices for Road, Path and Culvert. Schedule A, Section IV
List of works & prices for Area Drainage. Schedule A, Section V
List of works & prices for Fencing, Compound Wall and Gate. Schedule A, Section VI
List of works & prices for Rain Water Harvesting. Schedule A, Section VII
List of works & prices for Site Clearance. Schedule A, Section VIII
List of works & prices for Solar Water Heater. Schedule A, Section IX
Supply, Installation and testing of solar water heating system at 600 C (average) heating Temperature comprising of Flat Plate collectors (as per BIS 12933),1 No for each system of 100 LPD ,Stand for the collectors, Hot water tank (SS-304) TIG welded with PUF insulation & stainless steel outer cladding, Stand for hot water tank, Hydraulic steam hose pipe with check nut, Air went 1 Nos for each system.
Supply, Installation and testing of solar water heating system at 600 C (average) heating Temperature comprising of Flat Plate collectors (as per BIS 12933),1 No for each system of 200 LPD ,Stand for the collectors, Hot water tank (SS-304) TIG welded with PUF insulation & stainless steel outer cladding. Stand for hot water tank, Hydraulic steam hose pipe with check nut, Air went 1 Nos for each system all as specified and directed.
Supply, Installation and testing of solar water heating system at 600 C (average) heating Temperature comprising of Flat Plate collectors (as per BIS 12933),1 No for each system of 300 LPD ,Stand for the collectors, Hot water tank (SS-304) TIG welded with PUF insulation & stainless steel outer cladding; tank shall have internal partition to make 4 nos. compartment of 75 ltr and each compartment shall have separate inlet and outlet of water. Stand for hot water tank, Hydraulic steam hose pipe with check nut, Air went 1 Nos for each system all as specified and directed.
Supply, Installation and testing of solar water heating system at 600 C (average) heating Temperature comprising of Flat Plate collectors (as per BIS 12933),1 No for each system of 300 LPD ,Stand for the collectors, Hot water tank (SS-304) TIG welded with PUF insulation & stainless steel outer cladding; tank shall have internal partition to make 6 nos compartment of 75 ltr and each compartment shall have separate inlet and outlet of water. Stand for hot water tank, Hydraulic steam hose pipe with check nut, Air went 1 Nos for each system all as specified and directed.
(a) Testing of Solar water system up to 300 LPD capacity including testing of hot water pipe line any size from solar water tank to DU's completely all in respect all as specified and directed.
Supply and laying of GI pipe with PUF/Rock wool/Nitryl insulated plumbing from hot water tank to toilet of each DU common header (a) GI Pipe 20 mm dia
(b) GI Pipe 15 mm dia
M & L 15 mm dia 1 Gun metal globe or gate valve with iron wheel head screwed both end for iron pipe and fixed all as specified.
M & L 20 mm dia 1 Gun metal globe or gate valve with iron wheel head screwed both end for iron pipe and fixed all as specified.
List of works & prices for Street Light. Schedule A, Section X
Supply and fill sand in trenches and foundation etc. including compaction.
Supply and Laying in trenches Bricks, common burnt clay building bricks, sub class 'A' designation 75
Supply, laying and jointing reinforced concrete pipe 100 mm bore class NP-2 including collars as necessary for road crossing all as specified and directed (earth work shall be measured and paid separately under respective item of Schedule 'A')
Cement Concrete in foundations, filling and mass concrete Type D2 1:4:8 (40 mm graded aggregate)
Providing cement conrete in roof kerves of mud stops, rounded or chamfered on edges Types B1 1:2:4 (20 mm graded aggregate)
Supply and erect steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts, nuts & screws as specified Type 410 SP - 31 (9.00 meters long)
Junction box fitted in the pole & comprising of 6A SP MCB with terminals suitable for terminating incoming and outgoing cables upto 4 core 16 sq mm 1.1 KV grade armored PVC insulated including 2 Nos cable and termination with double compression copper stiainless steel gland for fixing armoured cable in box of size 4 core 6 to 16 sq mm
Supply and fixing of 40 mm dia GI Pipe medium grade 1.5m long on either side of the pole for cables.
Design, supply erection of 50 mm medium grade GI Pipe for fixing street light bracket with 1.5 m long. The rate should be inclusive of supply and erection with necessary clamp, screws, one coat of aluminium painting etc.
Supply and laying in trenches/pipe/duct floor cable heavy duty armoured XLPE insulated and screened PVC bedded, galvanised steel strip or wire armoued, as per IS 1100 volts grade Aluminium stranded conductor cable earthed of size 10 sqmm 4 core all as specified and directed by Project Manager (Earth work sand cushioining and cable cover shall be measured and paid separately).
(a) Taking down cable from street light terminal box and repairing damage cable and reconnected in terminal box inlcuding painting of pole in all respect all as specified and directed.
Supply, installation, testing and commissioning of cubicle type, free standing, floor mounted, street lighting distribution board working on 440 V 3 phase, 50 Hz AC supply. Its shall be with aluminium bus bars, 2 mm thick CRCA sheet steel enclosure, painted as per the 7 tank process amd painted for outdoor weather proof IP-54 protection installation as per specification complete in all respect and having the following details. Incoming 1 Nos 63 Amp FP 25 KA MCCB and fixed neutral link N with S/C and adjacent O/L releases, phase indication lamp with fuse, 3 Nos 40 Amp contactors. 1 No timer electronic type with battery back up for controlling street lights with adjustable time range (setting 6 pm to 10 pm). 1 No timer electronic type same as above (setting 10 pm to 2 am) 1 No. timer electronic type same as above (setting 2 am to 6 am) Bus bar, 200 Amps capacity 1 No, Outgoing 32 A SP MCB 10 KA - 3Nos.
Earthing complete with galvanised steel plate electrode 60x60cm x 6.3 mm thick, buried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of plate not less than 1.5 meters below normal ground level connected to galvanised earth lead wire 4.0 mm dia by means of bolts, nuts, check nuts and washers of galvanized iron or steel connected to earthing test point al as specified or indicated including testing and completion .
Extra for excavation and earth work and providing PCC chamber with GI cover, funnel with watering pipe 20mm dia, wire mesh & protection pipe for protection of earth conductor, test link etc. including testing and completion.
Supply and laying of 3 runs of 2.5 sq mm FRLS insulated copper conductor cable from juction box to street light fixture.
M & L for rendering 10mm thick plaster on fair faces of brick work or concrete surface in CM 1:4 finished even and smooth without using extra cement.
Supply and fix LED Street light lumeneries, 90 Watt, pressure die cast aluminium housing with toughned glass and high power LED with IP 66 protection, electronic driver and other accessories prewired complete in all respect all as specified and directed make CAT No. LSTP-90-CDL-M, CG/Wipro/Bajaj
Supply and fix of LED 40 Watt post top lantern comprising of LED, electronic drivers and other accessories, prewired including suitable size of vertical mounting medium grade GI Pipe complete all as specified and directed. Make :- CAT No. B4LPTC-40-CDL, CG/Wipro/Bajaj
JAIN BUILDER
SOOD ASSOCIATES PVT LTD
A2Z ENGINEERS AND PILE FOUNDATIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid