Loading…
Tender Value
₹94.5 L
EMD Value
₹1.9 L
Closing Date
25 May 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SIG WORKS
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex.I of Part-I of GCC2022,updated as per RB Letter No.2022/CEI/CT/GCC2022/Policy Dated-14.07.22 with up to date correction slip.
a) The tenderer must have successfully completed or substantially completed anyone of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges substructure, superstructure etc.), tenderer must have successfully completed or substantially completed anyone of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be sub-letted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.
Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing. Note for Item 15.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate
Meaning of similar works:" Any Signalling Work"
5 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Certificate to be submitted by tenderer along with the tender documents as per Annexure-II & Annexure-II(A) attached in tender Document.
Declaration regarding constitution of firm & Bank Details as per Annexure-I attached in tender Document.
Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees as per Annexure - XXIII attached in Tender Document.
Relevant Annexure is to be submitted in connection with status of their firms. i. e. Either for Sole Proprietorship/Partnership/Company registered under companies Act 2013/LLP (Limited Liability Partnership)) Registered under LLP Act 2008/Registered Society and Registered Trust/HUF (Hindu undivided Family) Firm's. Prescribed Format (Relevant Annexure) as per Firm's status is attached in tender document as per clause 16.2
Ajmer Division: Provision of S&T work in C/W Construction of RUB in lieu of LC 9, 15, 17, 38, 40 and 50 with Covering shed at these LCs for elimination in COR-UDZ section over Ajmer Division NWR.
SNT-AII-10-2026-27
SNT-AII-10-2026-27
Open
Works - General
180 Days
Ajmer, Rajasthan
₹0
₹1.9 L
25 May 2026
28 Apr 2026
11 May 2026
109 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 51,10,279.95 | ||
| — | 6.00 | — | — | ||
| Preparation of SWR literature in English along with associated mid-section interlocked gate with all corrections as per approved SWRD & approved SIP. For these all-technical corrections, editing, grammatical correction etc. are to be carried out and one rough print to be given to railways for approval before printing, as required for final processing of CRS sanction. This also includes preparation of maintenance cards in format provided by Rly. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 25,985.64 | |
| — | 6.00 | — | — | ||
| Translation of Station Working Rules from English to Hindi and framing out in DIGLOT form (or similar software) as per extant Rly practice. The required SWR in English will be provided by the contractor and has been covered separately in item no. 01011800 of Chapter 1 of SOR. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 32,336.94 | |
| — | 12.00 | — | — | ||
| Making photocopies & binding of the SWR literature in English/Hindi/Diglot form as per Railway practice. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 2,578.2 | |
| — | 4.00 | — | — | ||
| Supply of maintainer's furniture of Godrej make or superior and each set consist of (i) executive revolving bearing series low back-floating chair with normal arms cushioned chair-01 Nos. (ii) Executive table size 1650x900x728 mm with 3 drawers one side locker- 01 no. (iii) visitor chair seat & back cushion with high density foam with plastic PVC handle capsule type painted back-03 nos. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 1,10,658.84 | |
| — | 350.00 | — | — | ||
| Preparation and supply of laminated one set of all the completion plans including circuit diagrams and indoor as well as outdoor completion documents on standard 75-micron polyester film for station in Auto CAD. 6 (Six) sets xerox copies will also be provided for each of the documents mentioned below: Cable Route Plan, Cable Core Chart, Location details plan for all the locations, Cable termination details, Signalling Plan, SWR Diagram, Wiring Diagrams, Selection table, Locking table, Contact analysis, Fuse and Tag Block analysis of Relay Rack, CT rack, Control cum Indication Panel/VDU Diagram, Power Panel Diagram, Track circuit plan, rack erection plan and Junction Box details etc. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 67,847.5 | |
| — | 100.00 | — | — | ||
| Q-Series Neutral Line Relay (QN1 Type), 12F/4B, 24V DC complete with plug board (base plate), connectors and retaining clips etc and conforming to BRS- 930 and RDSO Specn.No.IRS:S-34 & S-23 or latest. The interlocking code for this unit shall be "ABCDE". Inspection: - RDSO Inspection charges: - Borne by Railways Payment Terms: - 100% after supply. | — | — | — | 4,74,607 | |
| — | 100.00 | — | — | ||
| Q-Series Neutral Line Relay (QN1 Type), 8F/8B, 24V DC complete with plug board (base plate), connectors and retaining clips etc and conforming to BRS- 930 and RDSO Specn.No.IRS:S-34 & S-23 or latest. The interlocking code for this unit shall be "ABCDF". Inspection: - RDSO Inspection charges: - Borne by Railways Payment Terms: - 100% after supply. | — | — | — | 4,56,051 | |
| — | 60.00 | — | — | ||
| Q-Series Twin Neutral Line Relay (QNN1 Type), 6F/2B, 24V DC complete with plug board (base plate), connectors and retaining clips etc and conforming to BRS-960 and RDSO Specn.No.IRS:S-34 & S-23 or latest. The interlocking code for this unit shall be "ACDEK". Inspection: - RDSO Inspection charges: - Borne by Railways Payment Terms: - 100% after supply. | — | — | — | 3,59,991 | |
| — | 5.00 | — | — | ||
| Supply of PVC insulated multi strand, single core copper conductor of size 16/0.2 mm (0.5sqmm) as per IS 694:2010 and RDSO Specn.No.IRS:S-76/89 (Amnd-3) or latest. Each coil should be of 100/200/500 meters length. Colour of the wire which is required will be specified by the Engineer incharge. Inspection: (i) RDSO/RITES if value of item in work more than 10 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 10 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply | — | — | — | 34,981.3 | |
| — | 3.00 | — | — | ||
| Supply of indoor PVC jumper wire (1x 0.6 mm) of all colours as per RDSO Specn.No.IRS:S-76/89 (Amnd.3) or latest. Note: wires colours will be specified/decided by site Engineer incharge. Inspection: (i) RDSO/RITES if value of item in work more than 10 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 10 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply | — | — | — | 8,712.93 | |
| — | 600.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at both ends in location boxes, cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution | — | — | — | 6,108 | |
| — | 600.00 | — | — | ||
| Supply of ARA Terminal Block (M-6) made of PBT/Poly Carbonate as per RDSO Specn.No.IRS:S-75/2006 (Rev.2) or latest and RDSO Drg. No. SA-23741A (Alt. 4) or latest. Inspection: RDSO. Inspection Charges: Borne by Railways. Payment Terms: 100% on supply. | — | — | — | 63,120 | |
| — | 300.00 | — | — | ||
| Supply of uncharged Low Maintenance Lead Acid (LMLA) secondary cell, shelf mounting type conforming to RDSO Specn.No.IRS:S-88/2004 or latest with inter cell connectors, nuts and bolts etc. Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply. 2V, 80AH | — | — | — | 7,46,625 | |
| — | 300.00 | — | — | ||
| Charging of Lead Acid Batteries with contractors own battery grade sulphuric acid and distilled water with minimum two charge - discharge cycles, installation of charged batteries in groups & their connection & wiring. The work shall be done as per extant practice of N.W.Rly & instruction of Engineer-in-charge. Detailed measurements of initial charging shall be recorded jointly by contractor & Rly's site-in-charge. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution. 2V, 80AH | — | — | — | 1,33,956 | |
| — | 50.00 | — | — | ||
| Erection, Fitting and Rail connection of Track Lead Junction Box on two supports (FRP stumps) with contractor's fixing material. This will include drilling of holes for track lead/side connections on rail. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution. | — | — | — | 79,168.5 | |
| — | 8000.00 | — | — | ||
| Supply of Channel Pins MS (Galvanized) single groove, 7 mm suitable for 4mm Dia bonding wire as per spec No IRS S 17 & RDSO Drg No. S-69/M. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply. | — | — | — | 54,800 | |
| — | 25.00 | — | — | ||
| Supply of GI wire 8 SWG (4mm Dia) suitable for track circuit rail bonding. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply. | — | — | — | 1,986 | |
| — | 50.00 | — | — | ||
| Provision/Installation of bonding with GI wire 4mm Dia (8 SWG) for track jumper & fish plate joints bonds. This will include drilling of 7.0/7.1/7.2 mm Dia holes in rails (4 Nos.) and provision of two jumpers for each bond, clipping of bonds etc. with contractors own tools as per instruction of Rly. Engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution. | — | — | — | 10,820.5 | |
| — | 30.00 | — | — | ||
| Cement concrete work for miscellaneous items in the ratio 1: 3: 6. Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor)(cum is Cubic Meter). Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 1,30,998.3 | |
| — | 6.00 | — | — | ||
| Supply of (02) nos. electrical lifting barrier booms of 9.76 meter each as per DRG RDSO/S 11600. The material will be as per RDSO Spec. No. RDSO/SPN/208/2012/Ver.2.0 and Amendment 1 or latest. Inspection: Consignee subject to procurement from RDSO approved supplier. Inspection Charges: None. Payment Terms: 100% after Supply | — | — | — | 1,81,456.02 | |
| — | 8.00 | — | — | ||
| Installation of Apparatus Cases Single (Large) with 'E' type lock on CC foundation. This includes filling of location foundations with river bed sand and plastering on top of the sand. Supply of 'E' Type lock has been covered in supply of Apparatus case separately. It covers fixing of lamp holder, switch and lamp etc. in Apparatus Case. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 10,004.32 | |
| — | 8.00 | — | — | ||
| Installation of Apparatus Cases Half (Medium) with 'E' type lock on CC foundation. This includes filling of location foundations with river bed sand and plastering on top of the sand. Supply of 'E' Type lock has been covered in supply of Apparatus case separately. It covers fixing of Location lamp holder, switch and lamp etc. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 6,092.48 | |
| — | 8.00 | — | — | ||
| Excavation and Casting of Apparatus Case foundation in ratio 1:3:6 with contractor's own materials including cement and galvanized anchor bolts of standard size. The required scaffolding Ferma etc for Casting of foundation will have to be brought by the contractor at his own cost. The item also includes additional masonry work as well as earthwork if required on bank where there will be possibilities of foundation sinked, fallen or tilted. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Single (Large) Case Apparatus case / SS location box as per Drg No. CSTE/5074 | — | — | — | 66,326.48 | |
| — | 8.00 | — | — | ||
| Excavation and Casting of Apparatus Case foundation in ratio 1:3:6 with contractor's own materials including cement and galvanized anchor bolts of standard size. The required scaffolding Ferma etc for Casting of foundation will have to be brought by the contractor at his own cost. The item also includes additional masonry work as well as earthwork if required on bank where there will be possibilities of foundation sinked, fallen or tilted. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Half (Medium) Case Apparatus case / SS location box as per Drg No. CSTE/5074 | — | — | — | 50,635.2 | |
| — | 4.00 | — | — | ||
| Supply of Phenolic laminated Sheet, grade P3 in standard size of 1220 X 1220 x 20 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied. Inspection: (i) RITES if value of item in work more than 10 lakhs or as per extant instructions by Railway Board. (ii) Consignee Inspection Charges:(i) Borne by Railways(ii) None Payment Terms: 100% after Supply. | — | — | — | 46,038.48 | |
| — | 8.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of size 10/12/20 mm thick in location box by providing all fixtures as per Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Single Case (Large Case) | — | — | — | 22,572.72 | |
| — | 8.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of size 10/12/20 mm thick in location box by providing all fixtures as per Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Half Case (Medium Case) | — | — | — | 6,585.52 | |
| — | 600.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. (Supply of all above terminals have been covered separately in Chapter 4 of SOR) Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 9,042 | |
| — | 50.00 | — | — | ||
| Supply of Thermo shrink Universal Jointing kit for Quad Cable (for straight joints) as per RDSO spec IRS/TC-77/2012 revision 3 With latest Amd. Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply | — | — | — | 1,29,300 | |
| — | 500.00 | — | — | ||
| Horizontal direction drilling/boring without damage of surface road /track using Auger Machine (HDD machine) or by Closed trench Method. The bore shall be upto 200 mm Dia & shall be done at the depth of minimum 1200 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. This includes insertion of different Dia DWC-HDPE pipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note: - Pipe Supply is not covered under this item. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 7,23,885 | |
| — | 1440.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. (cum is Cubic Meter) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 4,75,344 | |
| — | 36.00 | — | — | ||
| Digging of trench 1.2 Mtrs. deep from rail flange/ road level and 0.3 Mtrs to 0.6 Mtrs wide and back filling after placing of DWC/ RCC/GI pipe. (Placing of DWC/RCC/GI pipe covered separately). The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. For track crossing, Drg. No. CSTE/3644 Pg.7 of 11 and for Road Crossing, Drg. No. CSTE/3644 Pg. 5 of 11 are to be followed. (cum is Cubic Meter) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 11,883.6 | |
| — | 30.00 | — | — | ||
| Supply of Double Walled Corrugated (DWC) HDPE Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non- flame propagating type in 6 meters straight length and of size 120 mm outer Dia & 103.5 mm inner dia. (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One of the following coupling arrangements should also be supplied with each pipe as per the site requirement.1) Suitable snap fit coupler with rubber O- Ring 2) Spacers3) Tees4) Bend,5) End-cap(The total quantity of above items is equal to no. of pipes supplied.)DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vendor name and year of manufacture can be easily identified. Inspection: (i) RDSO/RITES if value of item in work more than 10 lakhs or as per extant policy (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 10 lakhs or as per extant policy Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% after Supply | — | — | — | 64,923.9 | |
| — | 180.00 | — | — | ||
| Placing of DWC HDPE/RCC/GI pipes along with collars in trenches at places near track and road, crossings, platform cuttings etc. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 6,409.8 | |
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 2,62,800 | |
| — | 8.00 | — | — | ||
| Supply and Installation of earth electrode including MS flat for signalling equipments on lever frame, apparatus cases, signal, relay racks, cable termination rack, block instrument etc. (supply & installation of earth electrode as per drawing no. RE/S&T/DRG/Tender/SK/398/94 for apparatus cases, signal post & other equipments as per instruction on earthing of S&T equipment. Laying of earth lead mild steel flat of size 35mmx6mm and fixing of lead MS flat to earth electrode and lever frame, signal post & apparatus cases as per Drg. No. CORE/S&T/ALD/SK/591/2008, 592/2008 and 593/2008 respectively and instructions on earthing at S&T equipment and providing cement enclosure for earth electrode as per drawing no. RE/S&T/Sig./Tender/SK/13/85 Alt. A) Note: This item requires for earthing of all the A/Cases & Signal as per RE standard. Inspection: Consignee Inspection charges: None Payment terms: 70% after supply, 20% after installation & 10% after commissioning | — | — | — | 65,598.88 | |
| — | 6.00 | — | — | ||
| Supply of Professional AC/DC clamp meter 3 ¾ digit, true RMS measurement, For Measurement of DC/AC currents up to 60A, AC/DC Voltage up to 600V, resistance up to 40 M, Current resolution 0.1mA for low current measurements, frequency up to 60 KHz and non-contact voltage measurement function with set of leads & carrying case. Model - SCM222 or equivalent/ higher make. Motwane/Stanlay/Fluke/Megger Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply. | — | — | — | 1,00,706.1 | |
| — | 6.00 | — | — | ||
| Supply of Digital Cable Insulation Tester for measurement of cable insulation resistance with auto range 0-500 V DC. Modal: SIT 500 equivalent or superior from any reputed make Fluke or Megger or Stanone or Superior. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply. | — | — | — | 62,746.32 | |
| — | 8.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. Epoxy paint will be supplied by Railways. Note: - The paint and primer should be from Asian Paints/ Nerolac/ Dulux / Berger. The primer / enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970) / (IS 2932 of 1974). Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Apparatus Case Full Size. (Outside & inside) | — | — | — | 2,443.6 | |
| — | 8.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. Epoxy paint will be supplied by Railways. Note: - The paint and primer should be from Asian Paints/ Nerolac/ Dulux / Berger. The primer / enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970) / (IS 2932 of 1974). Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Apparatus case Half Size. (Outside & inside) | — | — | — | 2,213.44 | |
| — | 8.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Full Case | — | — | — | 1,150.56 | |
| — | 8.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Half Case | — | — | — | 788.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
SNT-AII-10-2026-27CORUDZRUBUMLC91517384050.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .