Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC The rates quoted by M/s Archana Gupta Contractor are the lowest. | |
| 2 | L2₹3.7 L+₹37.39 (0.01%)Rejected-Finance | L2 | Rejected-Finance High Rate |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
30 Sept 2026, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
UPSCIDCO JHANSI/ORAI
Construction of Girls Toilet at Government Inter College Saidnagar, Block Dakor, Distt. Jalaun, under samagra siksha (Madhymik) 2025-26
2026_SCIDC_1188791_1
136/EE/Orai/ET/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
GIC Saidnagar Distt Jalaun
Please refer the tender documents
2 documents required · 2 mandatory
₹826
Yes
UPSCIDCO
₹7,500
Yes
26 Nov 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
23 Sept 2026 - 30 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Toilet | |||||
| 1.01 | Cleaning of jungle i/c rank vegetation, grass ,bush, wood trees and sapling of girth upto 30.0 cm. Measured at a height of 1.00 mtr. Above ground level & removal of rubbish up to a distance of 50.0 mtr. Outside the periphery of area cleared. | 81 | sqm | 12.17 | ₹986.09 |
| 1.02 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level,INCLUDING the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). PILE | 1.36 | cum | 6,257.17 | ₹8,509.74 |
| 1.03 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level,INCLUDING the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). RCC Work in grid beam in 1:1.5:3 | 1.83 | cum | 6,257.17 | ₹11,450.61 |
| 1.04 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level,INCLUDING the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). RCC work in Column | 0.75 | cum | 7,958.63 | ₹5,937.14 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level,INCLUDING the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). R.c.c.work in lintel,sun shade in mix M20 in 1:1.5:3 c:sand:stone grit | 0.66 | cum | 7,958.63 | ₹5,228.82 |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level,INCLUDING the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). R.c.c.work in slab in mix M20 ie.1:1.5:3 c:sand stone grit in slab and beam | 1.98 | sqm | 7,958.63 | ₹15,750.14 |
| 1.07 | Providing cutting bending Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 594 | KG | 74.6 | ₹44,313.59 |
| 1.08 | Brick work in 1:4 c:sand mortar in 115mm thick wall in grid bam curtain on edge | 0.44 | cum | 5,098.46 | ₹2,263.72 |
| 1.09 | brick work in foundation in 1:6 c:sand mortar Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 15 in superstructure above plinth level up to floor V level in all shapes and sizes in : | 0.92 | cum | 5,098.46 | ₹4,670.19 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.30 MB
BOQ_2239605.xls
BOQ • 0.38 MB
girlssadinagarnit.pdf
Tender Documents • 7.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .