| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-Finance | ₹26.2 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹27.5 LAccepted-Finance | ₹27.5 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | MSC ENTERPRISES | MMM ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the spalled/ distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 107.9 | M3 | 5,54,821.8 ₹6.5 L | 5,81,257.3 ₹6.9 L |
| 2.00 | Providing PCC 1:1.5:3 screed concrete using OP/ PP Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labour, T&P's leads, curing etc., complete. | 120.6 | M3 | 9,46,348.2 ₹11.2 L | 9,91,452.6 ₹11.7 L |
| 3.00 | Supplying and providing Nito Floor Hard Top Over the existing PCC/RCC concrete surface of 5kg/sqm and rubbed smooth with trowel finishing over the base concrete including cost of all materials, labour, lead, lift etc., complete. | 1,495.4 | M2 | 5,39,839.4 ₹6.4 L | 5,65,261.2 ₹6.7 L |
| 4.00 | Providing RCC 1:1.5:3 using OP cement with 12 to 20 mm machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete. | 31.2 | M3 | 3,26,102.4 ₹3.8 L | 3,41,608.8 ₹4.0 L |
| 5.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 36 | M2 | 41,292 ₹48,724.56 | 43,236 ₹51,018.48 |
| 6.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 2,184 | Kg | 2,14,032 ₹2.5 L | 2,24,952 ₹2.7 L |
Tender Value
Refer Docs
EMD Value
₹22,100
Closing Date
23 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Repair and Maintenance Works to the Indoor Switchyard 1
2026_EB_651733_1
CE SE C TTPS Spec.No. 392 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,100
Yes
25 Feb 2026
5 Feb 2026
24 Feb 2026
5 Feb 2026
23 Feb 2026
5 Feb 2026
Dismantling the spalled/ distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete.
Providing PCC 1:1.5:3 screed concrete using OP/ PP Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labour, T&P's leads, curing etc., complete.
Supplying and providing Nito Floor Hard Top Over the existing PCC/RCC concrete surface of 5kg/sqm and rubbed smooth with trowel finishing over the base concrete including cost of all materials, labour, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12 to 20 mm machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete.
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_781503.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid