Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹4.7 Cr | L1 | Accepted-AOC AS PER BOQ |
| 2 | L2₹4.8 Cr+₹2.4 L (0.51%)Rejected-AOC | ₹4.8 Cr+₹2.4 L (0.51%) | L2 | Rejected-AOC AS PER BOQ |
| 3 | L3₹4.8 Cr+₹6.4 L (1.36%)Rejected-AOC | ₹4.8 Cr+₹6.4 L (1.36%) | L3 | Rejected-AOC AS PER BOQ |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹9.6 L
Closing Date
24 Jan 2023, 1:00 pmClosed
S.E. Gandak Flood Circle Gorakhpur
S.E. Gandak Flood Circle Gorakhpur
FLOOD PROTECTION WORK OF MALAUNI BUND BETWEEN KM. 23.210 TO KM. 23.460 NEAR CHHAPRA VILLAGE ON LEFT BANK OF RIVER RAPTI IN DISTRICT GORAKHPUR.
2023_UPIDC_767295_48
02/SE/2022-23
Open Tender
Civil Works
Item Rate
90 days
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹9.6 L
Yes
S.E. Gandak Flood Circle Gorakhpur
11 Apr 2023
18 Jan 2023
24 Jan 2023
18 Jan 2023
24 Jan 2023
18 Jan 2023
19 Jan 2023
Amount
Digging out stone boulder at site of work under silt and stacking within a lead of 100m. It includes all lead and lift and also cost of labour, T&P and material charges etc.complite if any.
Earth work in Excavation for constructing cutter, Launching Apron & Slope Pitching. It includes all lead and lift and proper disposal of excavated earth and also all cost of labour, T&P and material charges etc. complete if any.
Laying stone Boulder in G.I. Wire crate of size (1.0 x 1.0 x 1.0) mtr. With mesh size 20x20 cm for making Cutter and Launching Apron including cost of GI wire crate but excluding cost of Stone boulder, loading, unloading, stacking & carriage. It includes all cost of labour, T&P and material charges etc. complete if any.
Supplying and Laying mzp stone Boulder in G.I. Wire crate of size (1.0 x 1.0 x 1.0) mtr. With mesh size 20x20 cm for making Cutter and Launching Apron including loading, unloading, stacking & carriage. It includes all cost of labour, T&P and material charges etc. complete if any.
Supplying and Laying Geo Textile sheet made of 200 gsm woven multifilament polypropylene yarn on prepared side slope / subgrade for slope pitching. It includes all cost of labour, T&P and material charges etc. complete if any.
Supplying & Laying of MZP. Stone Boulder for slope pitching including loading, unloading, stacking & carriage. It includes all cost of labour, T&P and material charges etc. complete if any.
M/S NARAIN ASSOCIATES
M/S R.K.TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .