Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Bid Value | |
| 2 | L2₹37.0 L+₹2.2 L (6.39%)Rejected-AOC | L2 | Rejected-AOC Higher Bid Value | |
| 3 | L3₹37.7 L+₹2.9 L (8.39%)Rejected-AOC | L3 | Rejected-AOC Higher Bid Value | |
| 4 | L4₹38.2 L+₹3.4 L (9.84%)Rejected-AOC | L4 | Rejected-AOC Higher Bid Value |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
24 Jun 2021, 6:00 pmClosed
GE (AF) BANGALORE
GE (AF) BANGALORE, HQ TC AIR FORCE , BANGALORE 560006
OUTSOURCING OF RESOURCES/TRADESMEN FOR MANAGEMENT OF LIFTS AT CHAF BANGALORE
2021_MES_446418_1
8799/GE/39
Open Tender
Civil Works
Item Rate
330 days
CH (AF) BANGALORE
AS PER NIT
5 documents required · 5 mandatory
₹500
Yes
GE (AF) BANGALORE
₹86,000
Yes
7 Sept 2021
28 May 2021
26 Jun 2021
28 May 2021
24 Jun 2021
12 Jun 2021
29 May 2021 - 8 Jun 2021
Amount
Outsourcing services for Operation of semidual operated electric driven bed cum passenger lift (1020 Kgs capacity) in one block Make :- OTIS for serving G+2 floors by employing one skilled lift operator for lift per shift for overall presence and duties on all days including Sunday and holidays round the clock for 24 hours in 03 shifts per day (each shift of 08 hours) i.e. 0600 hrs to 1400 hrs , 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs all as specified and as directed Location : OT Complex (1st shift = 1 Lift operator, 2nd Shift= 1 Lift operator, 3rd shift = 1 Lift operator)(Total No of Lift-02 Nos )
Outsourcing services for Operation of semidual operated electric driven bed cum passenger lift (544 Kgs capacity) in one block Make :- OTIS for serving G+2 floors by employing one skilled lift operator for lift per shift for overall presence and duties on all days including Sunday and holidays round the clock for 24 hours in 03 shifts per day (each shift of 08 hours) i.e. 0600 hrs to 1400 hrs , 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs all as specified and as directed Location : Family Wing (1st shift = 1 Lift operator, 2nd Shift= 1 Lift operator, 3rd shift = 1 Lift operator)(Total No of Lift-01 No )
Outsourcing services for Operation of semidual operated electric driven bed cum passenger lift (544 Kgs capacity) in one block Make :- OTIS for serving G+4 stories by employing one skilled lift operator for lift per shift for overall presence and duties on all days including Sunday and holidays round the clock for 24 hours in 03 shifts per day (each shift of 08 hours) i.e. 0600 hrs to 1400 hrs , 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs all as specified and as directed Location : Path Lab (1st shift = 1 Lift operator, 2nd Shift= 1 Lift operator, 3rd shift = 1 Lift operator)(Total No of Lift-02 Nos )
Outsourcing services for Operation of semidual operated electric driven passenger lift (01x13 passenger -03 Lifts and 01x8 passenger capacity-03 Lifts ) for P-223,P-224 & P-225 in Three blocks Make :- 'KONE' and operating G+6 stories by engaging one lift operator for all the six lifts by employing one skilled lift operator for night shift overall presence and duties on all days including Sunday and holidays in 01 shift per day ( shift of 08 hours) i.e. 2200 hrs to 0600 hrs all as specified and as directed Location : P-223, P-224 & P-225 Pocket I (3rd shift = 1 Lift operator)(Total No of Lift-06 Nos )
Outsourcing services for Operation of semidual operated electric driven passenger lift (01x13 passenger capacity and 01x8 passenger capacity for P-226,P-227 and 01x 13 passenger capacity for P-229) in Three blocks Make :- 'KONE' and operating G+6 stories by engaging one lift operator for all the five lifts by employing one skilled lift operator night shift for overall presence and duties on all days including Sunday and holidays in 01 shift per day ( shift of 08 hours) i.e. 2200 hrs to 0600 hrs all as specified and as directed Location : P-226 ,P-227,P-229 Pocket II (3rd shift = 1 Lift operator)(Total No of Lift-05 Nos )
Outsourcing services for Operation of semidual operated electric driven passenger lift (01x13 passenger capacity and 01x 08 passenger for P-228, 02x13 passenger for P-263 and 01x13 passenger for P-265) in Three blocks Make :- 'KONE' and operating G+6 stories by engaging one lift operator for all the four lifts by employing one skilled lift operator for overall presence and duties on all days including Sunday and holidays in 01 shift per day ( shift of 08 hours) i.e. 2200 hrs to 0600 hrs all as specified and as directed Location : P-228,P-263 & P-265 Pocket III (3rd shift = 1 Lift operator)(Total No of Lift-05 Nos )
Outsourcing services for Operation of semidual operated electric driven passenger lift (02x8 passenger capacity for MNS Accn and 01x13 passenger for P-230,P-231) in four blocks Make :- 'KONE' and operating G+5 stories by engaging one lift operator for all the four lifts by employing one skilled lift operator for overall presence and duties on all days including Sunday and holidays in 01 shift per day ( shift of 08 hours) i.e. 2200 hrs to 0600 hrs all as specified and as directed Location : P-230, P-231, MNS single Accn (3rd shift = 1 Lift operator)(Total No of Lift-04 Nos )
Note:- For item above 1 to 7 (i) A qualification of skilled Lift operator should be ITI holder reputed institute or minimum 5 years experience as per policies in vongue. (ii) The cost of uniform for the empoyed staff is included in the quoted rate by the contractor.If the contractor do not provide uniform recovery of Rs 1000/- per person will be recovered (iii) Cost of reliever and cleaning lift room , cabin and lift well including necessary T&Ps all as specified and directed by Engr -in-Charge and shall be deemed included in the unit rate quoted by the contractor. (iv) Provision of printed log sheets and filling up of all records in respect of lifts should be maintained by the contractor as per direction of Engr-in-Charge and its cost shall deemed to be included in the unit rate quoted by the contractor. (v) The operating staff has to check daily functionality of all machineries, control panel .Any major problem noticed shall be immediately report to JE/ Engr-in-charge. (vi) No RAR will be admitted for payment if wage register of operators along with RAR (vii) No RAR will be admitted for payment if copy of payment made through Adhar linked bank account to the operator and ensure contractor has been made min fair wages fixed by Govt of India Ministry of Labour employment and wage register duly stamped shall be submitted along with RAR/Final bill. (ix) Lift operator should be trained to rescue the passengers, if the lift become unserviceable. (x) The phone numbers of operators and concerned JE E/M will be displayed inside and out side the Lift
ABHILASH ENTERPRISES
Power and Telecom Systems
DESTINY BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .