| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAdmitted-Finance | ₹16.5 L | L1 | Admitted-Finance |
| 2 | L2₹16.5 LAdmitted-Finance | ₹16.5 L | L2 | Admitted-Finance |
| 3 | L3₹18.7 LAdmitted-Finance | ₹18.7 L | L3 | Admitted-Finance |
| 4 | L4₹20.0 LAdmitted-Finance | ₹20.0 L | L4 | Admitted-Finance |
| 5 | L5₹21.0 LAdmitted-Finance | ₹21.0 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L2 | khanconstructions L4 | RIM ELECTRICALS & SUPPLIERS L1 | M/S SHUJAT ELECTRICALS MECHINICALS AND SUPPLIERS L3 | M/S SYED YAQOOB CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Work items identified; | ||||||||
| 1.01 | Supply, installation, testing and commisioning of 11/0.433KV, 3-phase(EE Level-II) Distribution Transformers 63 KVA with Bimetallic Terminal complete in all respect as per Relevant IS. | 1 | No. | 1,25,000 ₹1.3 L | 1,40,000 ₹1.4 L | 1,90,000 ₹1.9 L | 1,45,000 ₹1.4 L | 1,41,000 ₹1.4 L |
| 2.01 | Supply, installation, testing and commisioning of 11/0.433KV, 3-phase(EE Level-II) Distribution Transformers 100 KVA with Bimetallic Terminal complete in all respect as per Relevant IS. | 1 | No. | 1,55,000 ₹1.6 L | 1,80,000 ₹1.8 L | 2,20,000 ₹2.2 L | 2,10,000 ₹2.1 L | 1,66,000 ₹1.7 L |
| 3.01 | Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate (350x350x5mm), top cap, Eathing Channel including digging of pit positioning etc, complete in all respect as per Relevant IS. | 28 | Nos. | 15,500 ₹4.3 L | 18,000 ₹5.0 L | 13,000 ₹3.6 L | 18,000 ₹5.0 L | 16,500 ₹4.6 L |
| 4.01 | Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate (350x350x5mm), top cap, Eathing Channel including digging of pit positioning etc, complete in all respect as per Relevant IS. | 27 | Nos. | 11,000 ₹3.0 L | 14,000 ₹3.8 L | 10,500 ₹2.8 L | 13,000 ₹3.5 L | 13,500 ₹3.6 L |
| 5.01 | Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per Relevant IS. | 2.6 | Km. | 50,000 ₹1.3 L | 40,000 ₹1.0 L | 32,000 ₹83,200 | 25,000 ₹65,000 | 60,000 ₹1.6 L |
| 6.01 | Supply, laying, stringing, tensioning, binding of 30 Sqmm ACSR Conductor complete in all respects as per Relevant IS. | 3.6 | Km. | 30,000 ₹1.1 L | 30,000 ₹1.1 L | 25,000 ₹90,000 | 21,000 ₹75,600 | 38,500 ₹1.4 L |
| 7.01 | Supply,Carraige upto site and fixing of GI V Cross arm & GI F Top with clamps duly fabricated as per site requirement including clamps(50x6 mm), GI Nuts & Bolts,washers etc complete in all respects as perRelevant IS | 588 | Kg | 130 ₹76,440 | 125 ₹73,500 | 100 ₹58,800 | 110 ₹64,680 | 130 ₹76,440 |
| 8.01 | Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces. | 600 | Kg | 130 ₹78,000 | 125 ₹75,000 | 100 ₹60,000 | 110 ₹66,000 | 130 ₹78,000 |
| 9.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Pin Insulators 12 kv.5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS. | 84 | No. | 200 ₹16,800 | 230 ₹19,320 | 150 ₹12,600 | 200 ₹16,800 | 310 ₹26,040 |
Tender Value
₹25.4 L
EMD Value
₹50,800
Closing Date
16 Jan 2026, 6:00 pmClosed
Executive Engineer ED Budgam KPDCL
ED Budgam, KPDCL
Installation of 100 KVA Transformer and 63 KVA dedicated substation along with HT LT network to RR Camp Khag and Drang.
2026_PDD_300134_1
EDB/106 of 2025-26
Open Tender
Electrical and Maintenance Works
15 days
ED Budgam, KPDCL
AS PER SBD
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED Budgam KPDCL
₹50,800
19 Jan 2026
8 Jan 2026
17 Jan 2026
8 Jan 2026
16 Jan 2026
9 Jan 2026
8 Jan 2026 - 9 Jan 2026
Amount
Work items identified;
Supply, installation, testing and commisioning of 11/0.433KV, 3-phase(EE Level-II) Distribution Transformers 63 KVA with Bimetallic Terminal complete in all respect as per Relevant IS.
Supply, installation, testing and commisioning of 11/0.433KV, 3-phase(EE Level-II) Distribution Transformers 100 KVA with Bimetallic Terminal complete in all respect as per Relevant IS.
Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate (350x350x5mm), top cap, Eathing Channel including digging of pit positioning etc, complete in all respect as per Relevant IS.
Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate (350x350x5mm), top cap, Eathing Channel including digging of pit positioning etc, complete in all respect as per Relevant IS.
Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per Relevant IS.
Supply, laying, stringing, tensioning, binding of 30 Sqmm ACSR Conductor complete in all respects as per Relevant IS.
Supply,Carraige upto site and fixing of GI V Cross arm & GI F Top with clamps duly fabricated as per site requirement including clamps(50x6 mm), GI Nuts & Bolts,washers etc complete in all respects as perRelevant IS
Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces.
Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Pin Insulators 12 kv.5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS.
Supply,Carraige upto site,Installation,testing and Commissioning of 11 Kvpolymer composite Disc Insulators 12 kv.5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS.
Galvanized stay set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x200x6mm), nuts-bolts, 2Nos turn-buckles, 1.8m long, 16mm diameter solid GS stay Rod & 7/3.15mm dia GI stranded wire complete
Supply, Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type complete in all respects as per Relevant IS.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O AB Switch 3-phase, 3pole 200-Amp, vertical Type with fittings complete in all respects as perRelevant IS.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A complete in all respects as per Relevant IS.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 1.1 KV grade, 1-core 185 Sqmm PVC Conductor FRLS type complete in all respects as per Relevant IS.
Supply,Carraige upto site, fixing of Aluminium Thimbles of size 185 Sqmm.
Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 185 Sqmm.
Supply,Carraige upto site, fixing and Commissioning of three phase trivector meter prodigy
LT Distribution Box for:- i) 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits.
LT Distribution Box for 100 kVA DTR with 160 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits
Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx10 mm, 50 mmx6 mm for connection of transformer body & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply,Carraige upto site, fixing of G I Muky Clamps. As per standards
Supply,Carraige upto site, fixing of Shackale insulators.
Cement bottoming of S T poles in 1:2:4 mix,up to 1/6th plantation depth of pole below ground, 9" above ground,circular with radius 6" around the pole girth/surface ,top surface tappered outwards 0.5 cum/pole as per the diagram given in technical specifications.
Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 2.5mtr long through GI strip 25*3 mm..
Painting of Poles with one coat of Red Oxide (1ltr/pole) and two coats of alimunium paint (1ltr/pole).
Supply and fixing of GI barbed wire Anti climbind Device with clamps complete in all respects as per relevant IS.
Supply of safety Shoes as per IS
Supply of Wooden ladder of Budloo make 18 FT long
Supply of safety helmets as per IS
Supply of safety belts as per IS
Supply and fixing of danger plates complete in all respects as per REC Standards
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges FOR )Creation of 63 kVA substatio alongwith HT/LT network RR Camp Drang Beerwah under the jurisdiction of ED Budgam KPDCL. (2)Installation of 100 KVA transformer at Operating Base of 62 RR(Dogra) Khag under the jurisdiction of ED Budgam, KPDCL.
IMPLA GENERAL SUPPLIERS (BID ID -2698554)
M/S SHUJAT ELECTRICALS MECHINICALS AND SUPPLIERS (BID ID -2700762)
khanconstructions (BID ID -2700663)
M/S SYED YAQOOB CONSTRUCTIONS (BID ID -2700150)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 1.64 MB
BOQ_973747.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid