Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 Mar 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Increasing Capasity of Transformers in Business Plan in area of EDD-I/II Hapur
2023_PVVNL_787471_1
107(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹2,000
28 Mar 2023
20 Mar 2023
27 Mar 2023
20 Mar 2023
27 Mar 2023
20 Mar 2023
Amount
FOR INCREASING CAPACITY OF TRANSFORMERS AND REPLACEMENT, IN BUSINESS PLAN, IN THE AREA OF EDD-I/II HAPUR, UNDER EDC., HAPUR. (All work will be completed as per sanctioned estimate).
Opening of the Jumper of LT & HT side at Double Pole.
Safely Removal of old 250KVA Transformer from Double Pole and loading of the same, with the help of Crane.
Safely Removal of old 100KVA Transformer from Double Pole and loading of the same, with the help of Manual Labour & Chain Tackle etc.
Safe Loading of New 400KVA transformer at JE, Store/CTR/ESC, Hapur, with the help of Crane.
Safe Loading of New 250KVA transformer at JE, Store/CTR/ESC, Hapur, with the help of Crane.
Carriage of New 400KVA transformer from JE Store/CTR/ESC, Hapur to site of work.
Carriage of New 250KVA transformer from JE Store/CTR/ESC, Hapur to site of work.
Construction of T/F plinth suitable for 250KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour.
Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Safe Unloading of New 400KVA transformer from vehicle, with the help of crane at LT Sub-Station and installing of the same on Double Pole/Plinth.
Safe Unloading of New 250KVA transformer from vehicle, with the help of crane at LT Sub-Station and installing of the same on Double Pole/Plinth.
Connecting of the Jumper of LT & HT side and fixing all required accessories at Double Pole/Plinth.
Carriage of old 250KVA transformer from site of work to JE Store/CTR/ESC, Hapur and safley unloading the same.
Carriage of old 100KVA transformer from site of work to JE Store/CTR/ESC, Hapur and safley unloading the same.
Laying of LT Cable 3.5x240Sqmm. As per RESPO Norms
ARYAN ENTERPRISES
M/S YASH TRADERS HAPUR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .