| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
2 Jul 2020, 3:00 pmClosed
BDO(BP)
Panchayat Union Office, Periyakulam
Construction of retaining wall with 3m span culvert near Markandeya school at AP road to Endapuli road in Endapuli panchayat
2020_RDTN_169790_1
990/2020/A4 Dated 15.06.2020
Open Tender
Civil Works - Others
Item Rate
180 days
Periyakulam
As per technical bid
3 documents required · 3 mandatory
₹0
₹15,000
4 Jul 2020
26 Jun 2020
2 Jul 2020
26 Jun 2020
2 Jul 2020
26 Jun 2020
Amount
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:3:6 (One cement Three sand and six hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete comply
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild stee
Refilling the basement with excavated earth other than sand complying the Standard specification
3m SPAN CULVERT SUB ESTIMATEEarth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Supply and filling of Red gravel from local quary with average lead of 1 Km including cost of meterails to side and all other labour charges as per standard specification etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.PATCHIRAJAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .