| Sl No | Description | Qty | Unit | HIMALAY CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Part 1 | ||||
| 1.01 | clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed | 0.02 | Ha | 49,044 ₹882.79 Lowest |
| 1.02 | Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. | 192 | Cum | 127 ₹24,384 Lowest |
| 1.03 | Earth Work in Excavation for foundation with dewatering | 67 | Cum | 139 ₹9,313 Lowest |
| 1.04 | Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 7.48 | Cum | 5,586 ₹41,783.28 Lowest |
| 1.05 | RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
R.C.C Grade M20 | 82.38 | Cum | 6,922 ₹5,70,234.36 Lowest |
| 1.06 | Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 49.43 | Qtl. | 5,947 ₹2,93,954.26 Lowest |
| 1.07 | Plastering with cement mortar (1:3) on RCC works as per technical specifications. | 229.71 | Sqm | 133 ₹30,551.43 Lowest |
| 1.08 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 | 43.78 | Cum | 1,922 ₹84,145.16 Lowest |
| 1.09 | Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation. | 266.18 | Cum | 106 ₹28,215.08 Lowest |
Tender Value
₹23 L
EMD Value
₹46,000
Closing Date
14 Oct 2025, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Gully Control Project at Panbari under SOPD-G 2025- 26
2025_SCD_47668_4
Tender/NIT/Pt-I/2025-26/4034
Open Tender
Civil Works
Item Rate
120 days
Panbari, Dalgaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹460
₹46,000
Yes
O/o The DSC, Assam
29 Jan 2026
24 Sept 2025
15 Oct 2025
25 Sept 2025
14 Oct 2025
8 Oct 2025
3 Oct 2025
Amount
clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material.
Earth Work in Excavation for foundation with dewatering
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work. R.C.C Grade M20
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3) on RCC works as per technical specifications.
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Construction of embankment with approved material obtained from borrow pits witha liftup to1.5m, transporting to site,spreading,grading to required slope
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Earth Work in Excavation for foundation with dewatering
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
For Diversion Channel: Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material.
Providing Signboard Fitting and Fixing.
stage.html
html • 0.03 MB
techsummary_76041.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BIDDarrangPanbari.pdf
Tender Documents • 2.57 MB
BOQ_76041.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .