| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC 12 BHARTI AARTIST COLONY VIKAS MARG NEW DELHI 110092 | EAST | DELHI | 110092 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹36.4 L+₹6.0 L (19.6%)Rejected-Finance 1ST FLOOR H NO 165 GALI NO 16 S B S COLONY KARAWAL NAGAR DELHI EAST DELHI DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹39.8 L+₹9.3 L (30.7%)Rejected-Finance 498 GANNAUGHT ROAD MHOW MP PIN 453441 | MHOW | INDORE | MP | 453441 | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹40.4 L+₹10.0 L (32.9%)Rejected-Finance DOOR NO 2 31 23 SECTOR 7 SBI COLONY MVP VISAKHAPATNAM 530 017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹49 L+₹18.6 L (61.1%)Rejected-Finance NO 16 7 739 3RD FLOOR OSMANPURA CHADERGHAT HYDERABAD TELANGANA 500 024 | HYDERABAD | HYDERABAD | TELANGANA | 500024 | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | R. S. Associates L2 | United Enterprises L6 | AGRAWAL ASSOCIATES L7 | Vijaypower Generators Limited L1 | M/s SS Engineering Enterprises L4 | M/S GARG CONSTRUCTION L3 | Friends fire Engineers L9 | Accurate Power Systems L5 | SONA LAKSHMI ASSOCIATE L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing and commissioning of Rerofit emission control device (RECD) of 250 KVA DG set installed at tech area, domestic area and Raksh Nagar to reduce the amount of pollutants emitted by combustion engines fueled by fossil energy source. The quoted rate shall include taking down the existing silencer system, suitable modification and MS structural steel fabrication work required at existing DG set exhaust system to uphold the RECD on the canopy for installation of Retrofit Emission Control Device.
RECD is deemed to be included with following features:-
• DG safety Alarm system included
• Material Construction - SS304
• Temperature Indication and monitoring
• Pressure Indication and monitoring
• PM Capture/PM reduction capacity 85-90%
• High Heat Resistance
• Low exhaust Resistance
• Easy to Install
• Maintenance twice a yearly with back purge for One year.
* Durability period should be 4000 hrs or 12 years whichever is earlier written warranty from OEM on this account shall be submitted. | 1 | Each | 5,22,000 ₹5,22,000 | 4,61,200 ₹4,61,200 | 8,00,000 ₹8,00,000 | 4,37,403 ₹4,37,403 Lowest | 6,80,000 ₹6,80,000 | 6,50,000 ₹6,50,000 | 7,49,999 ₹7,49,999 | 7,00,000 ₹7,00,000 | 5,50,000 ₹5,50,000 |
| 1.01Note-: (a) Retrofitted Emission Control Devices (RECD) having a minimum specified particulate Matter (PM) capturing efficiency of 70 % type approved by one, one of the five central Pollution Control Board (CPCB) recognized labs. (b) Smoke shall not exceed above value throughout the operating load points of the test cycle. (c ) The RECD device must be tested by one of the five currently CPCB recognised/ approved labs. (i). Automotive Research Association of India, Pune. (ii) International Centre for Automotive Technology, Manesar (haryana). (iii) India Oil Corporation, Research and Development Centre, Faridabad (iv). Indian Institue of petroleum , Dehradun. (d) The emission limits for above DG sets as per CPCB-II norms are reproduced as under (1). For more Than 19 KW upto 75 KW DG set Emission limit (g/KW-hr) Nos+HC- ≤ 4.7,CO -≤ 3.5, PM2.5-≤ 0.3, and Smoke limit( light Absorption Co-efficent , M-1)-≤ 0.7 . (2). For more Than 75 KW upto 800 KW DG set Emission limit (g/KW-hr) Nos+HC- ≤ 4.0,CO -≤ 3.5, PM2.5-≤ 0.2, and Smoke limit( light Absorption Co-efficent , M-1)-≤ 0.7 . As per para 3 of the aforementioned policy objective of PM 2.5 reduction in use DG set must be achieved(Before fitting RECD test to be carried out for exhaust gases &after fitting RECD the same shall be conducted to note changes in the emmission all necessary expenditue required is deemed to be included under the quoted rates) Durability of RECD shall be as per E-in-C;s Branch letter No A/37696/Gen/Pol/E2 W (PPC) dated 29 Jun 2022 to be followed alongwith all necessary provisions in the policy are required to be followed while executing the work/testing are deemed to be included with quoted rates. (e) (i) Approval: Device Should be type Approved CPCB for family of DG sets should be as per CPCB instructions and same has to be obtained from one of the five currently Central Pollution Control Board and required OEM authorization Certificate (ii) Carbon Monoxide, Hydrocarbon reduction efficiency Retrofit device is to be installed in place of the existing silencer, soot is to be collected in the Retrofit Device. (iii) The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. A manual valve be given after the first stage (Oxidation stage) and before the second stage (Passive Regeneration Trap) of the DOFF, Noise attenuation is with in the permissible limits, Equipped with mechanical pressure relief system, capturing chamber made of resistance process, treated mild steel etc. as required. (iv) The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to: a. Energy consumption. b. Running Hours. c. Warning related to ECD diagnosis for the following conditions: * Complete loss of particulate capture function. * Removal of the ECD system. * Failure of ECD system. * Detection of exhaust bypass, temporary or permanent, as part of field/ operator tampering. | ||||||||||||
| 1.02(v) Scope of Installation:- a. Installation of Emission control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device includes any type of machining Tools & Plants and materials required. b. Construction of suitable earthing station(if applicable) and necessary connections shall be done by the seller. Warranty/Service : 12 Months number of preventive maintenance visits offered in a year during warranty period :- 2 visits (vii) The Device to be minimum 10-12 year guarantee from date of commissioning. The guarantee certificate to be submitted to Engr-in-charge after commissioning the equipments. (f) Bidder/OEM must submit the details of similar works completed during FY 22-23, FY 23-24 and FY 24-25 supported with PO, along with the work completion certificate issued by PSU/Govt. Dept. (g) RECD should not consume additional electricity/power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD. (h) The provided RECD system shall be compatible with SITC of NOx system in future ensuring readiness without need of further modification. (i) Structural integrity analysis reports along with general assembly drawings to be submitted for the RECD installation. | ||||||||||||
| 2.00 | All as per item No 1 above but 200 KVA DG set | 1 | Each | 4,45,000 ₹4,45,000 | 4,29,900 ₹4,29,900 | 7,00,000 ₹7,00,000 | 3,57,000 ₹3,57,000 Lowest | 5,50,000 ₹5,50,000 | 3,60,000 ₹3,60,000 | 6,99,999 ₹6,99,999 | 5,80,000 ₹5,80,000 | 6,60,000 ₹6,60,000 |
| 3.00 | All as per item No 1 above but 125 KVA DG set | 2 | Each | 2,90,500 ₹5,81,000 | 3,90,800 ₹7,81,600 | 3,90,000 ₹7,80,000 | 2,23,000 ₹4,46,000 Lowest | 3,40,000 ₹6,80,000 | 2,75,000 ₹5,50,000 | 5,49,999 ₹10,99,998 | 4,00,000 ₹8,00,000 | 4,50,000 ₹9,00,000 |
| 4.00 | All as per item No 1 above but 82.50 KVA DG set | 2 | Each | 2,09,000 ₹4,18,000 | 3,51,700 ₹7,03,400 | 3,75,000 ₹7,50,000 | 1,67,820 ₹3,35,640 Lowest | 2,50,000 ₹5,00,000 | 2,30,000 ₹4,60,000 | 3,49,999 ₹6,99,998 | 3,00,000 ₹6,00,000 | 3,50,000 ₹7,00,000 |
| 5.00 | All as per item No 1 above but 75 KVA DG set | 2 | Each | 2,09,000 ₹4,18,000 | 3,28,300 ₹6,56,600 | 3,25,000 ₹6,50,000 | 1,56,215 ₹3,12,430 Lowest | 2,20,000 ₹4,40,000 | 2,25,000 ₹4,50,000 | 3,99,999 ₹7,99,998 | 2,80,000 ₹5,60,000 | 3,50,000 ₹7,00,000 |
| 6.00 | All as per item No 1 above but 62.50 KVA DG set | 1 | Each | 1,90,500 ₹1,90,500 | 3,04,000 ₹3,04,000 | 3,00,000 ₹3,00,000 | 1,56,215 ₹1,56,215 Lowest | 2,00,000 ₹2,00,000 | 2,35,000 ₹2,35,000 | 3,49,999 ₹3,49,999 | 2,80,000 ₹2,80,000 | 4,01,121 ₹4,01,121 |
| 7.00 | All as per item No 1 above but 40 KVA DG set | 5 | Each | 1,55,000 ₹7,75,000 | 2,89,000 ₹14,45,000 | 2,25,000 ₹11,25,000 | 1,43,462 ₹7,17,310 | 1,42,000 ₹7,10,000 Lowest | 1,90,000 ₹9,50,000 | 2,49,999 ₹12,49,995 | 2,00,000 ₹10,00,000 | 3,00,000 ₹15,00,000 |
| 8.00 | All as per item No 1 above but 30 KVA DG set | 2 | Each | 1,45,000 ₹2,90,000 | 2,81,000 ₹5,62,000 | 2,00,000 ₹4,00,000 | 1,40,200 ₹2,80,400 Lowest | 1,42,000 ₹2,84,000 | 1,60,000 ₹3,20,000 | 1,99,999 ₹3,99,998 | 1,90,000 ₹3,80,000 | 3,00,000 ₹6,00,000 |
Tender Value
₹57.6 L
EMD Value
₹1.1 L
Closing Date
24 Dec 2025, 4:00 pmClosed
CWE AF NAGPUR
HQ CWE AF NAGPUR VAYUSENA NAGAR, NAGPUR 440007 MILITARY ENGINEER SERVICES
PROVN OF RETROFIT EMISSION CONTROL DEVICE IN DG SETS AT 11 BRD AF STN OJHAR
2025_MES_741538_1
80662/E8
Open Tender
Civil Works
Item Rate
GE AF OJHAR
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
GE AF OJHAR
₹1.1 L
Yes
5 Feb 2026
26 Nov 2025
26 Dec 2025
26 Nov 2025
24 Dec 2025
17 Dec 2025
Amount
Supply, installation, testing and commissioning of Rerofit emission control device (RECD) of 250 KVA DG set installed at tech area, domestic area and Raksh Nagar to reduce the amount of pollutants emitted by combustion engines fueled by fossil energy source. The quoted rate shall include taking down the existing silencer system, suitable modification and MS structural steel fabrication work required at existing DG set exhaust system to uphold the RECD on the canopy for installation of Retrofit Emission Control Device. RECD is deemed to be included with following features:- • DG safety Alarm system included • Material Construction - SS304 • Temperature Indication and monitoring • Pressure Indication and monitoring • PM Capture/PM reduction capacity 85-90% • High Heat Resistance • Low exhaust Resistance • Easy to Install • Maintenance twice a yearly with back purge for One year. * Durability period should be 4000 hrs or 12 years whichever is earlier written warranty from OEM on this account shall be submitted.
Note-: (a) Retrofitted Emission Control Devices (RECD) having a minimum specified particulate Matter (PM) capturing efficiency of 70 % type approved by one, one of the five central Pollution Control Board (CPCB) recognized labs. (b) Smoke shall not exceed above value throughout the operating load points of the test cycle. (c ) The RECD device must be tested by one of the five currently CPCB recognised/ approved labs. (i). Automotive Research Association of India, Pune. (ii) International Centre for Automotive Technology, Manesar (haryana). (iii) India Oil Corporation, Research and Development Centre, Faridabad (iv). Indian Institue of petroleum , Dehradun. (d) The emission limits for above DG sets as per CPCB-II norms are reproduced as under (1). For more Than 19 KW upto 75 KW DG set Emission limit (g/KW-hr) Nos+HC- ≤ 4.7,CO -≤ 3.5, PM2.5-≤ 0.3, and Smoke limit( light Absorption Co-efficent , M-1)-≤ 0.7 . (2). For more Than 75 KW upto 800 KW DG set Emission limit (g/KW-hr) Nos+HC- ≤ 4.0,CO -≤ 3.5, PM2.5-≤ 0.2, and Smoke limit( light Absorption Co-efficent , M-1)-≤ 0.7 . As per para 3 of the aforementioned policy objective of PM 2.5 reduction in use DG set must be achieved(Before fitting RECD test to be carried out for exhaust gases &after fitting RECD the same shall be conducted to note changes in the emmission all necessary expenditue required is deemed to be included under the quoted rates) Durability of RECD shall be as per E-in-C;s Branch letter No A/37696/Gen/Pol/E2 W (PPC) dated 29 Jun 2022 to be followed alongwith all necessary provisions in the policy are required to be followed while executing the work/testing are deemed to be included with quoted rates. (e) (i) Approval: Device Should be type Approved CPCB for family of DG sets should be as per CPCB instructions and same has to be obtained from one of the five currently Central Pollution Control Board and required OEM authorization Certificate (ii) Carbon Monoxide, Hydrocarbon reduction efficiency Retrofit device is to be installed in place of the existing silencer, soot is to be collected in the Retrofit Device. (iii) The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. A manual valve be given after the first stage (Oxidation stage) and before the second stage (Passive Regeneration Trap) of the DOFF, Noise attenuation is with in the permissible limits, Equipped with mechanical pressure relief system, capturing chamber made of resistance process, treated mild steel etc. as required. (iv) The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to: a. Energy consumption. b. Running Hours. c. Warning related to ECD diagnosis for the following conditions: * Complete loss of particulate capture function. * Removal of the ECD system. * Failure of ECD system. * Detection of exhaust bypass, temporary or permanent, as part of field/ operator tampering.
(v) Scope of Installation:- a. Installation of Emission control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device includes any type of machining Tools & Plants and materials required. b. Construction of suitable earthing station(if applicable) and necessary connections shall be done by the seller. Warranty/Service : 12 Months number of preventive maintenance visits offered in a year during warranty period :- 2 visits (vii) The Device to be minimum 10-12 year guarantee from date of commissioning. The guarantee certificate to be submitted to Engr-in-charge after commissioning the equipments. (f) Bidder/OEM must submit the details of similar works completed during FY 22-23, FY 23-24 and FY 24-25 supported with PO, along with the work completion certificate issued by PSU/Govt. Dept. (g) RECD should not consume additional electricity/power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD. (h) The provided RECD system shall be compatible with SITC of NOx system in future ensuring readiness without need of further modification. (i) Structural integrity analysis reports along with general assembly drawings to be submitted for the RECD installation.
All as per item No 1 above but 200 KVA DG set
All as per item No 1 above but 125 KVA DG set
All as per item No 1 above but 82.50 KVA DG set
All as per item No 1 above but 75 KVA DG set
All as per item No 1 above but 62.50 KVA DG set
All as per item No 1 above but 40 KVA DG set
All as per item No 1 above but 30 KVA DG set
R. S. Associates (BID ID -3504011)
M/S GARG CONSTRUCTION (BID ID -3518549)
M/s SS Engineering Enterprises (BID ID -3518242)
Accurate Power Systems (BID ID -3506742)
United Enterprises (BID ID -3503375)
AGRAWAL ASSOCIATES (BID ID -3506722)
SONA LAKSHMI ASSOCIATE (BID ID -3518502)
Friends fire Engineers (BID ID -3518739)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_830348.xls
BOQ • 0.32 MB
PS80662.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .