| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.0 L+₹7,998.40 (2.03%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RAMESH RAI L1 | SRI KRISHNA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00SILT CLEARANCE OF TARUANWA DY KM 0.000 TO KM 5.630. | |||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction.by hydraulic excavator equivalent capacity 25.00 cum / hours | 4,258 | Cum | 54 ₹2,29,932 Lowest | 54 ₹2,29,932 Lowest |
| 2.00SILT CLEARANCE OF KOILASWA MR KM 0.000 TO KM 6.000 . | |||||
| 2.01 | Silt Clearance in channel with dressing and section carrying discharge below one cumec with service road and its proper disposal including all lead & lift and labour, T&P etc complete. | 2,842 | Cum | 52 ₹1,47,784 Lowest | 55 ₹1,56,310 |
| 3.00SCRAPING OF BED, INNER SIDE SLOPE KOILASWA MR KM 6.000 TO KM 7.400 | |||||
| 3.01 | Bed, inner side slope scraping of channel including desilting etc complete. | 5,276 | Sqm | 3.1 ₹16,355.6 | 3 ₹15,828 Lowest |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
9 Oct 2026, 12:00 pmClosed
Executive Engineer
Irrigation Division-2, Kushinagar
Silt clearance of Taruanwa Dy. from km 0.000 to km 5.630 and Koilaswa Minor from km 0.000 to km 6.000, along with scrapping work of Koilaswa Minor from km 6.000 to km 7.400
2026_UPIDC_1191373_25
06/EE/ID2K/Tender/2026-27
Open Tender
Civil Works - Canal
Item Rate
Irrigation Division-2, Kushinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹9,000
Yes
17 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SILT CLEARANCE OF TARUANWA DY KM 0.000 TO KM 5.630. | |||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction.by hydraulic excavator equivalent capacity 25.00 cum / hours | 4,258 | Cum | - | - |
| 2SILT CLEARANCE OF KOILASWA MR KM 0.000 TO KM 6.000 . | |||||
| 2.01 | Silt Clearance in channel with dressing and section carrying discharge below one cumec with service road and its proper disposal including all lead & lift and labour, T&P etc complete. | 2,842 | Cum | - | - |
| 3SCRAPING OF BED, INNER SIDE SLOPE KOILASWA MR KM 6.000 TO KM 7.400 | |||||
| 3.01 | Bed, inner side slope scraping of channel including desilting etc complete. | 5,276 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2247342.xls
BOQ • 0.30 MB
NIT1434.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .