| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.6 LAccepted-AOC PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | ₹55.6 L Quoted ₹56.4 L | L1 | Accepted-AOC 1 |
| 2 | L2₹57.0 L+₹61,727 (1.09%)Rejected-AOC VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | ₹57.0 L+₹61,727 (1.09%) | L2 | Rejected-AOC 2 |
| 3 | L3₹58.3 L+₹1.9 L (3.41%)Rejected-AOC C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | ₹58.3 L+₹1.9 L (3.41%) | L3 | Rejected-AOC 3 |
| Sl No | Description | Qty | Unit | The V.K. Co-Operative Labour & Construction Society Limited L2 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L1 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Shifting of street light pole due to road development under CAQM from Hayatpur to Nayara petrol pump and IMT Sector-8 road,Ward 3 to 6, MC, Manesar. | ||||||
| 1.01 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 200 | Metre | 398 ₹79,600 | 395 ₹79,000 | 360 ₹72,000 Lowest |
| 1.02 | S/E/T/C of automatic timer switch timer based powder coated siemens grey panel box made out 1.6 mm thick sheet steel, Contractor 40amp the pole-01 Nos., MCB 40Amp. DP 10KA= 01 No., Voltmeter Digital Type 01 No. Phase indication light RED=01 No., Yellow-01 No., Blue-01 No., Connnector 10mm=03 No., Astronomic Timer Switch M129D = 01 No., with all petty material i.e., Nuts, Bolts, Washers, Ferul Numbers, Cable Ties, Tie Base, Copper PVC Control Wire, Power Wire, Copper Thimbles, Panel Locks, 1-Hooks, PVC Tape, Insulators E type, L-type, Round Type, MCB Chanel, PVC Chanel, Connector Chanel, Connectors. Make -Havelles, G.E./LandT/Siemens/Schinder electric | 5 | Nos. | 10,400 ₹52,000 | 10,200 ₹51,000 | 9,800 ₹49,000 Lowest |
| 1.03 | Dismantling of octagonal pole up to 9 metres height including removal of lighting fixtures and brackets, using crane for safe dismantling, loading, unloading, carriage, and stacking at office/store site, complete in all respect up to entire satisfaction of Engineer-in-charge. | 224 | Each | 1,350 ₹3,02,400 | 1,300 ₹2,91,200 Lowest | 1,350 ₹3,02,400 |
| 1.04 | Removing and Re-Erection 1 nos. led lights fitting of various wattages of street lights from the pole at existing 7/8/9/10 mtr long GI pole /STP pole including cost of petty material required for the job complete in all respect. | 224 | Each | 245 ₹54,880 | 242 ₹54,208 | 230 ₹51,520 Lowest |
Tender Value
₹53.0 L
EMD Value
₹1.1 L
Closing Date
3 Jul 2026, 3:00 pmClosed
Vasu Baggan
Municipal Corporation MANESAR
Shifting of street light pole due to road development under CAQM from Hayatpur to Nayara petrol pump and IMT Sector-8 road,Ward 3 to 6, MC, Manesar.
2026_HRY_532047_1
20268D3567AB 39AF 42BC A314 D043625BEEA61809ULB
Open Tender
Civil Works
Works
90 days
Manesar
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
3 Aug 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Shifting of street light pole due to road development under CAQM from Hayatpur to Nayara petrol pump and IMT Sector-8 road,Ward 3 to 6, MC, Manesar. | |||||
| 1.01 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 200 | Metre | - | - |
| 1.02 | S/E/T/C of automatic timer switch timer based powder coated siemens grey panel box made out 1.6 mm thick sheet steel, Contractor 40amp the pole-01 Nos., MCB 40Amp. DP 10KA= 01 No., Voltmeter Digital Type 01 No. Phase indication light RED=01 No., Yellow-01 No., Blue-01 No., Connnector 10mm=03 No., Astronomic Timer Switch M129D = 01 No., with all petty material i.e., Nuts, Bolts, Washers, Ferul Numbers, Cable Ties, Tie Base, Copper PVC Control Wire, Power Wire, Copper Thimbles, Panel Locks, 1-Hooks, PVC Tape, Insulators E type, L-type, Round Type, MCB Chanel, PVC Chanel, Connector Chanel, Connectors. Make -Havelles, G.E./LandT/Siemens/Schinder electric | 5 | Nos. | - | - |
| 1.03 | Dismantling of octagonal pole up to 9 metres height including removal of lighting fixtures and brackets, using crane for safe dismantling, loading, unloading, carriage, and stacking at office/store site, complete in all respect up to entire satisfaction of Engineer-in-charge. | 224 | Each | - | - |
| 1.04 | Removing and Re-Erection 1 nos. led lights fitting of various wattages of street lights from the pole at existing 7/8/9/10 mtr long GI pole /STP pole including cost of petty material required for the job complete in all respect. | 224 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_611108.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .