Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC | ₹12.2 L | L1 | Accepted-AOC a |
| 2 | L2₹12.2 L+₹366.46 (0.03%)Rejected-Finance | ₹12.2 L+₹366.46 (0.03%) | L2 | Rejected-Finance r |
Tender Value
₹12.2 L
EMD Value
₹25,000
Closing Date
8 Jul 2026, 12:00 pmClosed
EE REDBASTI
O/O EE REDBASTI
Sambidhan Nirmata Baba Sahab Dr. Bhim Rao Ambedkar ki smriti mein gram pakri soyam vikas khand rudhauli mein sthapit ambedkar park ke boundry wall solar light sahit saundarikaran ka nirman karya
2026_REDUP_1165942_2
601/RED/VN/2026-27Dt. 23.05.2026
Open Tender
Civil Works
Percentage
90 days
works
AS PER SBD
2 documents required · 2 mandatory
₹944
₹25,000
Yes
5 Sept 2026
3 Jul 2026
8 Jul 2026
3 Jul 2026
8 Jul 2026
3 Jul 2026
3 Jul 2026 - 8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of old brick work as per si no 692 | 17.48 | cum | 425.6 | ₹7,439.49 |
| 2 | Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, watering and ramming of excavated earth into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P phowereh and basket etc. complete as per d.s.r 2.6.1 | 65.42 | cum | 123.94 | ₹8,108.15 |
| 3 | Concrete with 4cm gauge brick ballast, sand of 1.25 F.M. and cement in proportion 8:4:1 in foundations and under floors including supply of all materials labour and tools and plants etc. required for proper complation of the work as per d.s.r 4.1.8 | 46.41 | cum | 4,756.48 | ₹2,20,748.24 |
| 4 | Brick work in 1:6 cement and Fine sand of in foundation and plinth including supply of all material, labour tools and plants. etc. required for proper completion of work As per d.s.r 6.1.2 | 34.48 | cum | 4,980.09 | ₹1,71,713.5 |
| 5 | Brick work in 1:3 cement and C sand in 23 cm. thick wall including supply of all material, labour tools and plants. etc. required for proper completion of work. As per D.S.R 6.4.2 | 24.19 | cum | 6,358.23 | ₹1,53,805.58 |
| 6 | RCC work in 1:2:4 with cement,course sand and 20 mm stone grit including labour T&P complete as per SI NO 283 | 3.97 | cum | 7,718.75 | ₹30,643.44 |
| 7 | M.S. Iron work as reinforcement in RCC work including cutting,bending, binding etc complete as per D.S.R 5.22.6 | 5.61 | Qtl | 7,530.63 | ₹42,246.83 |
| 8 | 12 mm. thick plaster in 1:6 cement and fine sand. Over plain surface including supply of all materials, labours and T&P etc. required for proper completion of work. As per d.s.r 3.4.2 | 456.63 | Sqm | 239.95 | ₹1,09,568.37 |
| 9 | Two coat painting over one coat primer including supply of all material, labour and tools & plants etc. required for proper completion of the work.as per direction of E/I As per D.S.R13.48.3 | 24.3 | Sqm | 119.19 | ₹2,896.32 |
| 10 | Finishing walls with waterproof cement paint on new work with two coat over one coat primer including supply of all material, labour, T & P complete as per D.S.R 13.41.1 | 456.63 | Sqm | 129.63 | ₹59,192.95 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_2186752.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .