Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.4 LAdmitted-Finance | -36.13% | ₹65.4 L | L1 | Admitted-Finance |
| 2 | L2₹70.0 L+₹4.5 L (6.92%)Admitted-Finance NAGAR PANCHAYAT KHERAGARH DISTRICT AGRA U P | AGRA | UTTAR PRADESH | 282001 | -31.71% | ₹70.0 L+₹4.5 L (6.92%) | L2 | Admitted-Finance |
| 3 | L3₹70.6 L+₹5.1 L (7.86%)Admitted-Finance | -31.11% | ₹70.6 L+₹5.1 L (7.86%) | L3 | Admitted-Finance |
| 4 | L4₹73.9 L+₹8.4 L (12.9%)Admitted-Finance | -27.90% | ₹73.9 L+₹8.4 L (12.9%) | L4 | Admitted-Finance |
| 5 | L5₹73.9 L+₹8.5 L (12.9%)Admitted-Finance GHAZIABAD NAGAR NIGAM | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | -27.86% | ₹73.9 L+₹8.5 L (12.9%) | L5 | Admitted-Finance |
Tender Value
₹1.0 Cr
EMD Value
₹7.1 L
Closing Date
29 Apr 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Zone 3, Tajganj Ward No. 23, Maruti City Construction of an RCC drain from the T-Point, via Gayatri Madhusudan and Gopal Vatika, up to Janak Gas Godown. (Under CMNSY)
2026_DOLBU_1133178_1
30-03-2026/NAGAR NIGAM AGRA/29-04-2026/03
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Nagar Nigam
₹7.1 L
10 Aug 2026
4 Apr 2026
29 Apr 2026
4 Apr 2026
29 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) PWD Shedule | - | Cum | - | - |
| 2 | Cartage of Malva including up to 8km. distance loading & unloading etc. all Complete. (None Scheduled) | - | Cum | - | - |
| 3 | Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.Si.-01) | - | Cum | - | - |
| 4 | R.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 2 part of Coarse sand and 4 part of 4cm. stone grit) in R.CC Raft Foundation and Footing 4cm. Guage approved stone ballast excluding supply of reinforcement and its bending but inculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150 grade. (5-Chapter S.I.No.287) | - | Cum | - | - |
| 5 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1½:3 (One part of Cement, 1½ part of Coarse sand and 3 part of 2cm. Stone Grit) in Wall/R.CC Column in 1:1.5:3 excluding supply of reinforcement and its bending but inculding its fixing and binding the same with 24 BWGI binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-200 grade. (5-Chapter PWD SCH.No.289.1) | - | Cum | - | - |
| 6 | Providing of Nala Bandha including etc. all complete.(None Scheduled) | - | Each | - | - |
| 7 | Providing of 32H.P. Disiel Pump Set for dewatering of pond with pump operator and fuel charges etc all complete. (For 8 Hours) | - | Per Day | - | - |
| 8 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.cc Slab supply of reinforcement and its bending butinculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter S.I. No.-284) PWD Sheduled | - | Cum | - | - |
| 9 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.
(b) 10mm to 12mm tor.
(Chapter No. 10 S.I. No. 504(B)) | - | Qtl | - | - |
| 10 | Providing and Fixing of Barricating of 100mm dia average ballies with in a distance of 1.50 meter for 3 rows of 3 Q, 3 nos of Cross ballies, two supporting ballies of 3 meter ballies and 2 nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (Material will be property of Contractor after dismentling). | - | Rmt | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_2115270.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .