| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC | ₹9.7 Cr Quoted ₹11.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹11.2 CrRejected-Finance | ₹11.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹11.3 CrRejected-Finance | ₹11.3 Cr | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 UDYAM UP 66 0000471 | BHADOHI | UTTAR PRADESH | 221310 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAJ BUILDERS L1 | vijendra kumar L3 | SINEWY CONSTRUCTIONS PVT. LTD. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 9,290 | cum | 70 ₹6.5 L | 40 ₹3.7 L | 75 ₹7.0 L |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 106 | cum | 400 ₹42,400 | 3,500 ₹3.7 L | 1,000 ₹1.1 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. complete excluding GST. | 9,290 | cum | 37 ₹3.4 L | 55 ₹5.1 L | 75 ₹7.0 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 19,300 | cum | 190 ₹36.7 L | 128.5 ₹24.8 L | 200 ₹38.6 L |
| 5.00 | Construction of granular sub-base by providing grading -1 material in uniform layers with motor grader on prepared surface by mix in place method with rotavator at OMC, & compecting with vibratory roller to achieve the desired density, complete as per Clause 401 | 5,468 | cum | 3,400 ₹1.9 Cr | 2,500 ₹1.4 Cr | 3,055 ₹1.7 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (W.M.M.) | 3,930 | cum | 3,800 ₹1.5 Cr | 3,500 ₹1.4 Cr | 3,255 ₹1.3 Cr |
| 7.00 | Providing & applying Primer coat with bitumen emulsion (SS-1 Type) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60kg/Sqm. Using mechanical means. complete excluding GST. | 33,495 | sqm | 36 ₹12.1 L | 40 ₹13.4 L | 35 ₹11.7 L |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (Bitumen VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects Complete in all respects inculding all material excluding GST. (Grade-I) | 2,177 | cum | 9,100 ₹2.0 Cr | 8,000 ₹1.7 Cr | 10,000 ₹2.2 Cr |
| 9.00 | Providing & applying Tack coat with V.G.-10 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.20kg/Sqm. On the prepared Bitumen/ granular surface clieaned with mechanical broom. | 33,495 | sqm | 14 ₹4.7 L | 14 ₹4.7 L | 12 ₹4.0 L |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Bitumen VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. | 1,004 | cum | 11,400 ₹1.1 Cr | 15,000 ₹1.5 Cr | 11,000 ₹1.1 Cr |
Tender Value
₹11.2 Cr
EMD Value
₹22.3 L
Closing Date
16 Feb 2026, 2:00 pmClosed
se pwd saharanpur
se pwd saharanpur
Widening and strengthening work of Kheda Afghan Harpal Umahi Kalan (Ghasauti) Rampur Maniharan Road (other district road) from chainage 7.000 to 14.300
2026_CEMRT_1113853_2
615/96MS-S/2026 Date 23-01-2026
Open Tender
Civil Works
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹22.3 L
23 Apr 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: SE, Saharanpur Circle, PWD, Saharanpur
Name of Work: tuin lgkjuiqj esa foÙkh; o"kZ 2025&26 esa [ksMk vQxku gjiky mekgh dyka ¼?klkSrh½ jkeiqj efugkjku ekxZ ¼vU; ftyk ekxZ½ ds pSust 7-000 ls 14-300 rd pkSM+hdj.k ,oa lqn`<+hdj.k dk dk;ZA
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Note : 5 Years Maintenance will be done by Contractor. Payment for maintenance will be calculated as per Letter no 3689lh-&oprmc@ewy&23&24] fnukad 17-02-2024 of chief engineer (HQ-1), Letter No. 3665lh-&dSEi@eqŒvfHkŒ¼eqŒ&1½ @2023&24] fnukad 16-02-2024 of Office order of Engineer-in-Chief & Shashanadesh No. 17@2024@lk-&113@23&1& 2024&23&1099@113@2023] fnukad 16-01-2024 calculated from the Completion Date, Which is 5 Yrs. From the date of Actual completion. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P (including all taxes except GST) Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m 1 cum Excess(+) Full Conversion INR
2 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres 2 cum Excess(+) Full Conversion INR
3 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. complete excluding GST. 3 cum Excess(+) Full Conversion INR
4 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. 4 cum Excess(+) Full Conversion INR
5 Construction of granular sub-base by providing grading -1 material in uniform layers with motor grader on prepared surface by mix in place method with rotavator at OMC, & compecting with vibratory roller to achieve the desired density, complete as per Clause 401 5 cum Excess(+) Full Conversion INR
6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (W.M.M.) 6 cum Excess(+) Full Conversion INR
7 Providing & applying Primer coat with bitumen emulsion (SS-1 Type) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60kg/Sqm. Using mechanical means. complete excluding GST. 7 sqm Excess(+) Full Conversion INR
8 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (Bitumen VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects Complete in all respects inculding all material excluding GST. (Grade-I) 8 cum Excess(+) Full Conversion INR
9 Providing & applying Tack coat with V.G.-10 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.20kg/Sqm. On the prepared Bitumen/ granular surface clieaned with mechanical broom. 9 sqm Excess(+) Full Conversion INR
10 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Bitumen VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. 10 cum Excess(+) Full Conversion INR
11 Construction of un-reinforced, without dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing 11 cum Excess(+) Full Conversion INR
12 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. PCC 1:3:6 in Foundation. complete in all respects but excluding GST. 12 cum Excess(+) Full Conversion INR
13 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C M 20) complete in all respects but excluding GST. 13 cum Excess(+) Full Conversion INR
14 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C M 25) complete in all respects but excluding GST. 14 cum Excess(+) Full Conversion INR
15 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. complete in all respects but excluding GST. 15 MT Excess(+) Full Conversion INR
16 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications complete in all respects but excluding GST. 16 Rm Excess(+) Full Conversion INR
17 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications. complete in all respects but excluding GST. 17 cum Excess(+) Full Conversion INR
18 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications. complete in all respects but excluding GST. 18 sqm Excess(+) Full Conversion INR
19 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 complete in all respects but excluding GST. 19 cum Excess(+) Full Conversion INR
20 Providing and laying reinforcement cement concrete pipe NP-3 class bedding in single row 450mm dia Hume Pipe culvert including head wall etc. as per MORTH Specification Complete in all respects excluding GST. 20 Rm. Excess(+) Full Conversion INR
21 Providing and laying reinforcement cement concrete pipe NP-3 class bedding in single row 600mm dia Hume Pipe culvert including head wall etc. as per MORTH Specification Complete in all respects excluding GST. 21 Rm. Excess(+) Full Conversion INR
22 Providing and laying reinforcement cement concrete pipe NP-3 class bedding in single row 900mm dia Hume Pipe culvert including head wall etc. as per MORTH Specification Complete in all respects excluding GST. 20 Rm. Excess(+) Full Conversion INR
23 Providing and laying reinforcement cement concrete pipe NP-3 class bedding in single row 1000mm dia Hume Pipe culvert including head wall etc. as per MORTH Specification Complete in all respects excluding GST. 21 Rm. Excess(+) Full Conversion INR
24 Providing and laying reinforcement cement concrete pipe NP-3 class bedding in single row 1200mm dia Hume Pipe culvert including head wall etc. as per MORTH Specification Complete in all respects excluding GST. 22 Rm. Excess(+) Full Conversion INR
25 Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. Complete in all respects excluding GST. 23 sqm Excess(+) Full Conversion INR
26 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. complete excluding GST. 21 cum Excess(+) Full Conversion INR
27 Providing and laying Filter material Graded stone aggregate of required size underneath pitching in slopes complete as per drawing and Technical specification complete excluding GST. 20 cum Excess(+) Full Conversion INR
28 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications complete excluding GST. 21 cum Excess(+) Full Conversion INR
29 M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. complete excluding GST. 22 sqm Excess(+) Full Conversion INR
30 Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc. Ordinary kilometer stone (precast) as per MoRTH specification clause No. 804 complete excluding GST. 23 Nos Excess(+) Full Conversion INR
31 Reinforced cement concrete M15 grade Hectometre stone of standard design as per IRC:8, fixing in position including painting and printing etc.Hectometer stone (precast) as per MoRTH specification clause No. 804 complete excluding GST. 23 Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_2063988.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid