| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-Finance | 1 | Accepted-Finance Rate quoted to less estimate rate | |
| 2 | 2₹2.5 L+₹22,500.71 (9.90%)Accepted-Finance | 2 | Accepted-Finance Rate quoted to less estimate rate | |
| 3 | 3₹2.6 L+₹35,154.56 (15.5%)Accepted-Finance | 3 | Accepted-Finance Rate quoted to less estimate rate |
| Sl No | Description | Qty | Unit | Muthumariappan L2 | K.Vinothraj L3 | Masanapandi L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Plastic Storage Shed at K.Duraisamypuram village and Panchayat | ||||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to fulldepth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and bailing out water whenever necessary et complete complying with standard specification | 3.76 | Cubic Meter | 250 ₹940 | 270 ₹1,015.2 | 220 ₹827.2 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4.66 | Cubic Meter | 1,750 ₹8,155 | 1,700 ₹7,922 | 1,500 ₹6,990 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including all cost and conveyance etc | 5.73 | Squre Meter | 500 ₹2,865 Lowest | 600 ₹3,438 | 500 ₹2,865 Lowest |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.25 | Cubic Meter | 4,900 ₹25,725 | 6,300 ₹33,075 | 4,800 ₹25,200 Lowest |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.4 | Cubic Meter | 5,550 ₹2,220 | 6,550 ₹2,620 | 5,500 ₹2,200 Lowest |
| 8.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 3.09 | Cubic Meter | 5,350 ₹16,531.5 | 7,300 ₹22,557 | 5,200 ₹16,068 Lowest |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | Squre Meter | 250 ₹7,727.5 Lowest | 300 ₹9,273 | 250 ₹7,727.5 Lowest |
| 10.00 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | Squre Meter | 1,300 ₹35,100 | 1,550 ₹41,850 | 1,200 ₹32,400 Lowest |
| 11.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.57 | Squre Meter | 6,000 ₹3,420 | 7,800 ₹4,446 | 5,500 ₹3,135 Lowest |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Block Development officer (VP)Pudur
Panchayat Union Office, Pudur Block, Thoothukudi District
Construction of Plastic Storage Shed at K.Duraisamypuram village and Panchayat SBM and PGF _ 2026_27
2026_RDTN_703494_1
BDO_VP_T2_1372_26_Dt_09.09.26
Open Tender
Civil Works
Item Rate
90 days
Pudur Block
As per tender schedule
4 documents required · 4 mandatory
₹6,000
₹6,000
Yes
17 Oct 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Plastic Storage Shed at K.Duraisamypuram village and Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to fulldepth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and bailing out water whenever necessary et complete complying with standard specification | 3.76 | Cubic Meter | 263.78 | ₹991.81 |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4.66 | Cubic Meter | 2,027.41 | ₹9,447.73 |
| 4 | Supplying and erecting centering for sides and soffits including all cost and conveyance etc | 5.73 | Squre Meter | 547.5 | ₹3,137.18 |
| 5 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.25 | Cubic Meter | 5,716.94 | ₹30,013.93 |
| 6 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.4 | Cubic Meter | 6,474.01 | ₹2,589.6 |
| 8 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 3.09 | Cubic Meter | 6,237.57 | ₹19,274.09 |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | Squre Meter | 286.94 | ₹8,869.32 |
| 10 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | Squre Meter | 1,505.75 | ₹40,655.25 |
| 11 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.57 | Squre Meter | 7,026.04 | ₹4,004.84 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_845596.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
TechnicalBidKDuraisamy.pdf
Tender Documents • 0.61 MB
BOQ_845596.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .