| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC | ₹3.4 Cr | L1 | Accepted-AOC Bidder is Lowest 1 (L1) |
| 2 | L2₹3.5 CrRejected-Finance GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹3.5 Cr | L2 | Rejected-Finance Quoted Amount is not Lowest by Bidder. Bidder is L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S Vinay Construction L1 | M/s VINAY KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of sub grade in all type of soil with proper disposal including all lead and lift including all labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 6,260.32 | M3 | 80 ₹5.0 L | 60 ₹3.8 L |
| 2.00 | Providing and laying cement concrete M-15 (1:2:4) with A-19 coarse aggregate including cost of all material labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 579.83 | M3 | 5,400 ₹31.3 L | 5,500 ₹31.9 L |
| 3.00 | Painting with Bitumenous on top of sleepers including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 2,899.17 | M2 | 40 ₹1.2 L | 70 ₹2.0 L |
| 4.00 | Supply and Filling fine sand in 100 mm layer below C.C. linning including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 2,845.6 | M3 | 794 ₹22.6 L | 1,200 ₹34.1 L |
| 5.00 | Supply and Laying LDEP film 200 micron Ist grade in bed and slope including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 31,301.6 | M2 | 25 ₹7.8 L | 40 ₹12.5 L |
| 6.00 | Laying 100 mm thick C.C. Linning in M-15 (1:2:4) with A-19 coarse aggregate including cost of all material labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 28,456 | M2 | 749 ₹2.1 Cr | 650 ₹1.8 Cr |
| 7.00 | 25mm thick cement plaster in 1:12 cement mortar on top of filter including cost of all material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 26,550.03 | M2 | 160 ₹42.5 L | 250 ₹66.4 L |
| 8.00 | Supply and Filling sealing compound in joints groove 150 mm x 11mm x 350 mm size including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 9,529.88 | M | 60 ₹5.7 L | 85 ₹8.1 L |
| 9.00 | Shuttering for precast work including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 5,851.95 | M2 | 200 ₹11.7 L | 100 ₹5.9 L |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
31 Dec 2025, 3:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer 2nd Circle Irrigation Works Kanpur
Talgram Pariyojnantargat Mighauli Rajwaha Ke Km. 0.000 se Km. 1.100 tatha Mighauli Rajwaha vistar ke Km. 11.900 se Km. 12.800 tak C.C. Lining Ka Karya.
2025_UPIDC_1094930_3
10/S.E.-II/2025-26
Open Tender
Civil Works - Canal
180 days
Kannauj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,800
₹7.3 L
Yes
28 Jan 2026
26 Dec 2025
31 Dec 2025
26 Dec 2025
31 Dec 2025
26 Dec 2025
Amount
Earth work in Excavation of sub grade in all type of soil with proper disposal including all lead and lift including all labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying cement concrete M-15 (1:2:4) with A-19 coarse aggregate including cost of all material labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Painting with Bitumenous on top of sleepers including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supply and Filling fine sand in 100 mm layer below C.C. linning including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supply and Laying LDEP film 200 micron Ist grade in bed and slope including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying 100 mm thick C.C. Linning in M-15 (1:2:4) with A-19 coarse aggregate including cost of all material labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
25mm thick cement plaster in 1:12 cement mortar on top of filter including cost of all material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supply and Filling sealing compound in joints groove 150 mm x 11mm x 350 mm size including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Shuttering for precast work including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
M/s VINAY KUMAR CONTRACTOR (BID ID -5784604)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.22 MB
BOQ_2031268.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid