| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L Quoted ₹5.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹6.1 LRejected-Finance | ₹6.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹6.5 LRejected-Finance 160 TATVAM VILLAS SOHNA ROAD SECTOR 48 GURGAON HARYANA 122018 UDYAM UP 29 0006576 09AAGCG6521P1Z3 R M MII STATUS AS NOT VERIFIED | GURUGRAM | HARYANA | 122018 | ₹6.5 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Geron Engineering Pvt Ltd L3 | M/S BRIJ ENTERPRISES L1 | J S Enviro Services Pvt. Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.01 | MSW Processing fee for 1 year of operations (OPEX) (Annual Cost for 1 TPD) | 1 | Nos | 3,20,000 ₹3,20,000 | 2,53,675 ₹2,53,675 Lowest | 3,01,125 ₹3,01,125 |
| 1.02 | Secondary Transportation of MSW from Npp Khora-Makanpur to the Waste processing Plant Place. (Vehicle will be provided by the Contractor and other expenses like manpower, fuel, O&M will be borne by bidder) for one year. (Annual Cost for 1 TPD) | 1 | Nos | 3,25,000 ₹3,25,000 | 2,77,400 ₹2,77,400 Lowest | 3,10,250 ₹3,10,250 |
| 1.03 | Brick work in C.M 1:5 mix including all labour 111charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | 10 | mm | - | - | - |
| 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 85 | km | - | - | - |
| 1.05 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | 95 | KK | - | - | - |
| 1.06 | Brick work in C.M 1:5 mix including all labour 1charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | 100 | Nos | - | - | - |
| 2.00Laying and Jointing PVC Pipe. Heading | ||||||
| 2.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using | 5 | Nos | - | - | - |
| 2.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost | 33 | Nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
17 Mar 2026, 12:00 pmClosed
EO
NPP KHORA MAKANPUR
Nagar Palika Parishad Khoda-Makanpur, Ghaziabad, U.P. invites, online Tender (Bid) for Transportation of Day to Day generated Solid Waste from Secondary collection point (Vehicle Depo Khoda) and Processing of transported waste from own resources as p
2026_DOLBU_1120800_1
206
Open Tender
Solid Waste Management
Item Rate
365 days
npp khora makanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
eo
₹3 L
16 Apr 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | MSW Processing fee for 1 year of operations (OPEX) (Annual Cost for 1 TPD) | - | Nos | 1 | - |
| 1.02 | Secondary Transportation of MSW from Npp Khora-Makanpur to the Waste processing Plant Place. (Vehicle will be provided by the Contractor and other expenses like manpower, fuel, O&M will be borne by bidder) for one year. (Annual Cost for 1 TPD) | - | Nos | 1 | - |
| 1.03 | Brick work in C.M 1:5 mix including all labour 111charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | - | mm | 100 | - |
| 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | - | km | 53 | - |
| 1.05 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | - | KK | 10 | - |
| 1.06 | Brick work in C.M 1:5 mix including all labour 1charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | - | Nos | 11 | - |
| 2Laying and Jointing PVC Pipe. Heading | |||||
| 2.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using | - | Nos | 10 | - |
| 2.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost | - | Nos | 22 | - |
stage.html
html • 0.05 MB
technical_2084956.pdf
techsummary_2084956.pdf
finance_2084956.pdf
BOQ Comparative Chart
xlsx
finsummary_2084956.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2084956.xls
BOQ • 0.28 MB
shuddhipatra.pdf
PDF • 0.04 MB
shudhiptra.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].