Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-Finance 142 | ₹17.5 L | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹17.5 LRejected-Finance | ₹17.5 L | L2 | Rejected-Finance Above To Lowest Rate |
| 3 | L3₹17.5 LRejected-Finance | ₹17.5 L | L3 | Rejected-Finance Above To Lowest Rate |
Tender Value
₹17.5 L
EMD Value
₹1.7 L
Closing Date
29 Apr 2026, 1:00 pmClosed
Executive Officer
NPP MAU
ward no 27 munshipura paschim me hakim lodhi ke plot se sahanwaz ke makn tak R.C.C nala nirmad karya
2026_DOLBU_1130030_1
68-125
Open Tender
Civil Works
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive Officer
₹1.7 L
6 Jun 2026
30 Mar 2026
29 Apr 2026
30 Mar 2026
29 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Site Clerance including labour and matrials and including grass cutting/Dressing and carrage of matrials by Head load | |||||
| 2Providing cost of dewatering including cost of boaring, laying of 4" dia PVC Pipe, Hire charges of 7.5 K.V. Diesel pumping set, hire charges of pvc pipe and cost of 4" día plastic pipe for disposal of water as required distance also including wages | |||||
| 3P/F of Brick Balalst with all comp work | |||||
| 4Baricating and diversion of nala for Construction of drain with all comp work | |||||
| 5E/W filling in embankment with cartage soil up to 8.00 km distances etc com. | |||||
| 6E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251 | |||||
| 7C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials, T/P with all com. Work SI No. 273 | |||||
| 8R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, T/P with all com. Work Sl No.285 | |||||
| 9MS work in R.C.C. work including labour and matrials, T/P with all com. Work SI No.504 | |||||
| 10Shifting of all material, add to item 251-253 for every additional 30m lead or part of 30m.or for every additional 1.50m lift or part of 1.50m Work Sl No-254. 300 m distance | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech68.pdf
Tender Documents • 4.90 MB
BOQ_2107990.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid