| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance VILLAGE NER PO MANJHU TEHSIL ARKI DISTT SOLAN H P | ARKI | SOLAN | HIMACHAL PRADESH | ₹5.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹6.3 L+₹38,686 (6.51%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹6.3 L+₹38,686 (6.51%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | RAKESH KUMAR L2 | Pushpender Bhargav L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying cement concrete 1:3:6(1 Cement :3 Sand : 6 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including all carriage of materials upto all leads and lifts complete in all respects. | 11.9 | Per cubic meter | 8,500 ₹1,01,150 | 7,950 ₹94,605 Lowest |
| 2.00Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | |||||
| 2.10 | Walls any thickness (but not less than 0.10meter thickness including attached pilasters,buttresses plinth and string courses etc. from top of foundationlevel upto floor two level including all leads and lifts etc.complete in all respects | 22.21 | Per Cubic meter | 10,000 ₹2,22,100 | 9,900 ₹2,19,879 Lowest |
| 3.00Providing form work with steel plates 3.15 mm thick welded with angle iron frames 30x30x5 mm so as to give fair finish including centering ,shuttering, propping etc. in all leads and lifts and removal of the same for-in-situ reinforced concrete and plaiin concrete work as per directions and to the entire satisfaction of Engineer- in Charge at site of work. in:- | |||||
| 3.10 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc. upto 200mm in thickness including all leads and lifts etc.complete in all respects. | 72 | Per Sqm | 600 ₹43,200 | 500 ₹36,000 Lowest |
| 3.20 | Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. | 227.2 | Per Sqm | 500 ₹1,13,600 | 400 ₹90,880 Lowest |
| 4.00 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level including cost of binding wires and carriage of materials upto all leads and lifts complete in all respects. | 1,580 | Per Kilogramme | 97 ₹1,53,260 Lowest | 97 ₹1,53,260 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,930
Closing Date
10 Nov 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Arki
Modification of existing RCC Septic Collection cum Stabilization tank with RCC roofing and RCC Baffle walls arrangement at STP Arki and at STP Arki and STP Kunihar in Tehsil Arki District Solan HP SH_ Under Fecal sludge Management funds provided by R
2025_HPIPH_119029_2
ARK-SOL01-425-8213-63
Open Tender
Civil Works
Item Rate
60 days
Arki
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹11,930
18 Nov 2025
30 Oct 2025
10 Nov 2025
30 Oct 2025
10 Nov 2025
30 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
FORM_6_STP_Arki_Kunihar.pdf
Tender Documents • 0.44 MB
FORM_8_STP_Arki_Kunihar.pdf
Tender Documents • 1.47 MB
TERM_condition_STP_Arki_Kunihar.pdf
Tender Documents • 0.15 MB
BOQ_174235.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .