Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
25 Jun 2026, 11:00 am
Electrification of Proposed Construction of New Crossing station at SRAVANUR with structures/foundation suitable for 2x25kv OHE
ECN-TRD-04-2026-RT
ECN-TRD-04-2026-RT
Open
12 Months
Unknown (Unspecified Location)
₹0
₹5.1 L
3 Jun 2026
3 Jun 2026
11 Jun 2026
A-COPPER ITEMS OF OHE PORTION 615775.30 Below/P
C-CONCRETE ITEMS OF OHE PORTION 4335902.88 Below/P
E-NON-SOR ITEMS
35.Transportation of OHE materials.
39 (a) Supply and erection of Schematic diagram and Shock treatment board - Supply only
39 (b) Supply and erection of Schematic diagram and Shock treatment board - Erection only
42. Dismantlement of Cantilever Assembly - Erection
43. Dismantlement of ATD - Erection
"47. Adjustment on bracket assemblies for lowering/raising the height of contact and catenary wires where Encumbrance is changed"
25kV Danger board with skull symbol - Supply
25kV Danger board with skull symbol - Erection
Provision of PG clamps (4 nos per Stiffener rod (2 stiffener rod per Set) under FOB/ROB or under any Over line structure (Contact wire piece will be supplied by railway, PG clamps shall be supplied by Contractor)- Supply & Erection
Provision of Replacement catenary wire with contact wire under FOB/ROB (Contact wire piece will be supplied by railways, Contact and catenary ending clamps to be supplied by contractor)
Trenchless cutting to cross the cable across the track duly provided with 110mm (OD) WDPE pipe PE 80, PN 6 category to pull 2Cx70sqmm LTUG cable (scope includes cutting charge and cost of HDPE pipe with laying.)
Item Breakup - A-COPPER ITEMS OF OHE PORTION
4.25 43052.00 wire and catenary wire) and erection of over head equipment only by manual -Supply Only
4.25 34970.00 wire and catenary wire) and erection of over head equipment only by manual -Erection only
2.00 34970.00 wire and catenary wire) and erection of over head equipment only by manual -Erection under power block only
4.00 7284.00 conductor ) and erection of anti creep with Pure/Cadmium Copper Catenary Wire -Supply Only
4.00 1810.00 conductor ) and erection of anti creep with Pure/Cadmium Copper Catenary Wire -Erection Only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
4.00 1810.00 conductor ) and erection of anti creep with Pure/Cadmium Copper Catenary Wire -Erection under power block Total 445149.50
Item Breakup - B-STEEL ITEMS OF OHE PORTION
30.00 94860.00 2845800.00 series etc excluding S1 to S8 masts - Supply Only
0.50 94860.00 and RSJ 8"x6" & S1 to S8 masts- Supply Only
39.00 98803.00 3853317.00 work other than masts by manual/crane-Supply only
39.00 work other than masts by manual/crane-Erection only
20.00 work other than masts by manual/crane-Erection under power block
10.00 96832.00 galvanized small parts steel work-Supply Only
10.00 galvanized small parts steel work-Erection Only
6.00 5800.00 galvanized small parts steel work-Erection under power block Total 8218661.00
Item Breakup - C-CONCRETE ITEMS OF OHE PORTION
50.00 soil-Supply Only
50.00 soil-Erection Only
50.00 rocky soil-Supply Only
50.00 rocky soil-Erection Only
370.00 than hard soil and rocky soil-Supply Only
370.00 than hard soil and rocky soil-Erection Only Total 3149490.00
Item Breakup - D-OTHER ITEMS OF OHE PORTION
4.25 10279.00 over head equipment and verification of Purchasers Engineering Plan (Unit is STKM)
1.00 7233.00 and working instruction pertaining to 25 KV AC Traction
30.50 masts of switching stations and L.T. supply transformer stations by manual/crane
22.00 Supply only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
22.00 -Erection only
14.00 -Erection under power block only
130.00 19296.00 2508480.00 assembly (including stay and bracket insulators) -Supply only
130.00 assembly (including stay and bracket insulators) -Erection only
70.00 assembly (including stay and bracket insulators) -Erection under power block only
25.00 of additional fittings on a single bracket assembly for supporting two OHEs-Supply Only
25.00 of additional fittings on a single bracket assembly for supporting two OHEs-Erection Only
15.00 of additional fittings on a single bracket assembly for supporting two OHEs-Erection under power block Only
off Each arrangement for one OHE -Supply only
and arrangement for one OHE-Erection only
1.00 arrangement for one OHE-Erection under power block only
2.00 3584.00 pulled -Supply only
2.00 pulled -Erection only
1.00 pulled -Erection under power block only
2.00 12712.00 arrangement for span wire -Supply only
2.00 arrangement for span wire -Erection only
2.00 arrangement for span wire -Erection under power block only
200.00 Supply only
200.00 Erection only
160.00 Erection under power block only
10.00 74829.00 equipment (3 pulley type) modified with counter weight assembly for conventional / composite OHE. -Supply only
10.00 equipment (3 pulley type) modified with counter weight assembly for conventional / composite OHE. -Erection only
6.00 2765.00 equipment (3 pulley type) modified with counter weight assembly for conventional / composite OHE. -Erection under power block only
2.00 6619.00 termination of Single conductor of overhead equipment.-Supply only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
2.00 termination of Single conductor of overhead equipment.-Erection only
2.00 termination of Single conductor of overhead equipment.-Erection under power block only
10.00 11222.00 termination of Double conductor (conventional/composite OHE) -Supply only
10.00 termination of Double conductor (conventional/composite OHE) -Erection only
6.00 termination of Double conductor (conventional/composite OHE) -Erection under power block only
8.00 8377.00 anticreep termination (one end)-Supply Only
8.00 1126.00 anticreep termination (one end)-Erection Only
2.00 1126.00 anticreep termination (one end)-Erection under power block Only
10.00 of additional fittings at a turnout, diamond crossing or overlap.-Supply only
10.00 of additional fittings at a turnout, diamond crossing or overlap.-Erection only
6.00 of additional fittings at a turnout, diamond crossing or overlap.-Erection under power block only
16.00 insulator -Supply only
16.00 insulator -Erection only
8.00 insulator -Erection under power block only
2.00 4883.00 suspension insulator -Supply only
2.00 suspension insulator -Erection only
2.00 suspension insulator -Erection under power block only
10.00 insulator -Supply only
10.00 insulator -Erection only
6.00 insulator -Erection under power block only
8.00 35011.00 assembly -Supply only
8.00 2998.00 assembly -Erection only
4.00 2998.00 assembly -Erection under power block only
6.00 34563.00 without earth contact assembly. -Supply only
6.00 3797.00 without earth contact assembly. -Erection only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
6.00 3797.00 without earth contact assembly. -Erection under power block only
1.00 62496.00 Isolator -Supply only
1.00 5770.00 Isolator -Erection only
1.00 5770.00 Isolator -Erection under power block only
2.00 8502.00 contact assembly in an Isolator -Supply only
2.00 contact assembly in an Isolator -Erection only
2.00 contact assembly in an Isolator -Erection under power block only
6.00 2450.00 inter locking device. -Supply only
6.00 inter locking device. -Erection only
2.00 inter locking device. -Erection under power block only
25.00 Supply only
25.00 Erection only
10.00 Erection under power block only
110.00 Supply only
110.00 Erection only
20.00 Supply only
20.00 Erection only
40.00 special bond -Supply only
40.00 special bond -Erection only
16.00 electrode -Supply only
16.00 electrode -Erection only
300.00 insulated PVC sheathed Aluminium cable-Supply only
300.00 insulated PVC sheathed Aluminium cable - Erection only
10.00 insulated PVC sheathed Aluminium cable - Erection under power block only
10.00 power block only
40.00 bus bar 18 mm-Supply only
40.00 bar 18 mm -Erection only
20.00 bar 18 mm -Erection under power block only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
12.00 (6310)-Supply only
12.00 (6310)- Erection only
12.00 (6310)- Erection under power block only
6.00 1611.00 (6320) -Supply only
6.00 (6320) -Erection only
6.00 (6320) -Erection under power block only
3.00 1521.00 joint-Supply only
3.00 - Erection only
3.00 - Erection under power block only
3.00 3748.00 terminating tee -Supply only
3.00 terminating tee- Erection only
3.00 terminating tee- Erection under power block only
1.00 79956.00 and commissioning of 10kVA L.T. supply transformer (oil type)-Supply Only
1.00 6314.00 and commissioning of 10kVA L.T. supply transformer (oil type)-Erection Only
1.00 6314.00 and commissioning of 10kVA L.T. supply transformer (oil type)-Erection under power block Only
1.00 59459.00 for AT location as per RDSO spec. No. TI/SPC/PSI/CLS/0020 with A & C slip No. 4 (7/2010) or latest -Supply only
1.00 1842.00 for AT location as per RDSO spec. No. TI/SPC/PSI/CLS/0020 with A & C slip No. 4 (7/2010) or latest -Erection only
1.00 1842.00 for AT location as per RDSO spec. No. TI/SPC/PSI/CLS/0020 with A & C slip No. 4 (7/2010) or latest -Erection under power block only
1.00 15041.00 switch -Supply only
1.00 1488.00 switch -Erection only
1.00 1488.00 switch -Erection under power block only
3.00 19030.00 screen for FOB/ROB.-Supply only
3.00 1490.00 screen for FOB/ROB.-Erection only
3.00 1490.00 screen for FOB/ROB.-Erection under power block only
1.00 1228.00 device for LT. Supply transformer stations - Supply only DY. CEE/TRD/CN/BNC-ELECTRICAL/SOUTH WESTERN RLY
1.00 device for LT. Supply transformer stations - Erection only
1.00 device for LT. Supply transformer stations - Erection under power block only
1.00 28654.00 along with suitable fixing clamps-Supply Only
1.00 2141.00 along with suitable fixing clamps-Erection Only
1.00 2141.00 along with suitable fixing clamps-Erection under power block Only
30.00 support to another- Erection Only
30.00 support to another- Erection under power block Only
26.00 assembly/assemblies on a mast or support- Erection Only
26.00 assembly/assemblies on a mast or support- Erection under power block Only
1.40 36710.00 Erection only
1.40 36710.00 Erection under power block only
2.00 1418.00 head equipment -Supply only
2.00 6161.00 head equipment -Erection only
2.00 6161.00 head equipment -Erection under power block only
Each 31 (h) Slewing of equipment- Erection only Span
30.00 cutting-Erection only
30.00 cutting-Erection under power block only
10.00 breaking the foundation -Erection only
10.00 breaking the foundation -Erection under power block only
6.00 2309.00 power block only
20.00 masts of switching stations and L.T. supply transformer stations by manual/crane under Power Block Total 7106739.75
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1-IRSGCCApril2022.pdf
ATTACHMENT
15-SCC-11-2025.pdf
ATTACHMENT
14-ProformasetEGS.pdf
ATTACHMENT
16-JPOEARTHWORK.pdf
ATTACHMENT
ACS1 GCC
ATTACHMENT
ACS2 GCC
ATTACHMENT
ACS3 GCC
ATTACHMENT
ACS4 GCC
ATTACHMENT
ACS5 GCC
ATTACHMENT
ACS6 GCC
ATTACHMENT
ACS7 GCC
ATTACHMENT
ACS8 GCC
ATTACHMENT
ACS9 GCC
ATTACHMENT
ACS10 GCC
ATTACHMENT
13-GCCACS11.pdf
ATTACHMENT
ESP SRAVANUR
ATTACHMENT
TENDERDOCUMENTSHRAVANURRT.pdf TENDER DOCUMENT
ATTACHMENT
3-ACS-1GCC-2022Policy14-07-2022_1.pdf
ATTACHMENT
4-ACS-2GCC-2022Policy13-12-2022.pdf
ATTACHMENT
5-ACS-3GCC-2022Policy26-04-2023.pdf
ATTACHMENT
6-ACS-4GCC-2022Policy07-08-2023.pdf
ATTACHMENT
7-ACS-5GCC-2022Policy20-10-2023.pdf
ATTACHMENT
8-ACS-6GCC-2022Policy21-12-2023.pdf
ATTACHMENT
9-ACS-7GCC-2022Policy25-09-2024.pdf
ATTACHMENT
10-ACS-8GCC-2022Policy20-12-2024.pdf
ATTACHMENT
11-ACS-9GCC-2022Policy09-01-2025.pdf
ATTACHMENT
12-ACS-10GCC-2022Policy04-03-2025.pdf
ATTACHMENT
AlteredApproved-ESP-SRAVANUR-MYS-HAS.pdf
ATTACHMENT
TENDERDOCUMENTSHRAVANURRT.pdf
ATTACHMENT
Download all tender documents and submit your bid