Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-Finance | ₹7.7 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹8.9 LAccepted-Finance | ₹8.9 L | L2 | Accepted-Finance Responsive |
| 3 | L3₹8.9 LAccepted-Finance | ₹8.9 L | L3 | Accepted-Finance Responsive |
| 4 | L4₹9.2 LAccepted-Finance | ₹9.2 L | L4 | Accepted-Finance Responsive |
| 5 | L5₹9.6 LAccepted-Finance | ₹9.6 L | L5 | Accepted-Finance Responsive |
Tender Value
₹13.3 L
EMD Value
₹26,700
Closing Date
26 Feb 2026, 6:55 pmClosed
Executive Engineer
shalimar
4 Race Ways Under Establishment of innovative movable Dome Based vertical Trout Hatchery for Enhanced Trout Production at South Campus Sallar (Bagwani), SKUAST-K.
2026_SKUST_304036_1
E-NIT-95 of 2025-26
Open Tender
Civil Works
90 days
South Campus Sallar (Bagwani) SKUAST-K
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Assistant comptroller
₹26,700
7 Apr 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Earth work in excavation by Mechanical means (Hydraulic Excavator), Earth work in excavation in trenches for foundation with required depth including removal of excavated soil/slush etc. ,dressing of bed and sides ,dewatering (if any) of trenches till construction upto ground level is achieved and disposal of excavated soil as directed by the Engineer incharge including all leads ,lifts and Carriage by mechanical means as required complete. (For all kinds of soils)
Providing and laying stone soling tightly hand packed under foundations, footings ,floors etc. including carriages of materials from source to site of work complete in all respects.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers, Columns, pillars, piers, abutments, posts and struts.
Structural steel work in welded in built up sections trusses and framed work, including cutting, hoisting, fixing in position and applying of priming coat of approved steel primer complete in all respects..(All work at all levels complete.)
15mm Cement plaster 1 : 3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement inclusive with Water Proffing material as desired by Engg incharge.
P/F of PVC 110mm PVC Btype Syrya Prakash Embeded in Concrete and opened in Race ways at multiple spots with all necessary Collars, Tees, Bends etc complete in all respects as desired aby Scientist Incharge.
Note:-The rates quoted are inclusive of all carriages of materials (Mechanical/Manual) from source to site work and all extra charges including dewatering if any during the execution of work till complete in all respects.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_987537.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_987537.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid