| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.2 LAccepted-Finance 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹58.2 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹58.2 L+₹4,245.19 (0.07%)Rejected-Finance 1 1 A VANSATTART ROW 3RD FLOOR ROOM NO 2A | ₹58.2 L+₹4,245.19 (0.07%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹58.3 L+₹9,679.80 (0.17%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹58.3 L+₹9,679.80 (0.17%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹58.4 L+₹19,441.84 (0.33%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | ₹58.4 L+₹19,441.84 (0.33%) | L4 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED L2 | CONCORD ENGINEERING L4 | ORIENTAL ENGINEERING CO. L3 | ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | 1. PART-A (Labour Portion) Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 500 Ml / 1000 Ml capacity at Muluk Bottoling plant in the district of Birbhum, P.H.E. Dte. by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing filling capping machine (1 No.), labeling machine & batch code machine (1 No), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No). The Agency will provide sufficient man power for smooth operation of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant.( rate is including ESI &PF of existing rules) w.e.f 01/08/2026 to 31/07/2027 | 12 | MONTHS | 1,46,000 ₹17,52,000 | 1,46,310 ₹17,55,720 | 1,46,150 ₹17,53,800 | 1,45,801 ₹17,49,612 Lowest |
| 1.02 | Provision of Electrician for visit to oversee/Maintenance of all panel boards, luminaries system, compressor, D.G. sets, 315 KVA sub-station with transformer, H.T & L.T switch Gear equipment in sub-station, overall power circuit and electrical accessories and machineries | 365 | DAYS | 696 ₹2,54,040 | 715 ₹2,60,975 | 700 ₹2,55,500 | 694 ₹2,53,310 Lowest |
| 2.01 | Part-B (Supervision Portion) Skilled supervisor for supervision of entire installation once in a month for trouble free operation of Bottling plant and 315VKA sub-station with AVR, transformer etc. including manning, control, output data generation etc., enter inspection report in all log book and signed with inspection date. (4 times in a month) | 12 | MONTHS | 23,250 ₹2,79,000 | 23,295 ₹2,79,540 | 23,280 ₹2,79,360 | 23,244 ₹2,78,928 Lowest |
| 2.02 | Sweeping of garbage from bins of different area in side the plant, collecting from roads, intermediate path way, back side of the plant , cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, rooms to ensure highest level of hygenic condition inside the plant, cleaning of all grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc. as per direction of EIC. | 12 | MONTHS | 13,530 ₹1,62,360 | 13,582 ₹1,62,984 | 13,565 ₹1,62,780 | 13,522 ₹1,62,264 Lowest |
| 3.00Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc. to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade ( RFC & labelling machine ), FRL- 32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area (4 times in month). PET Blowing, RFC, Labelling, Batch coding & Shrink Wrapping Machine( 4 times in a month) and HP compressor with Dryer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc ( 4 times in a month) and pouch filling machines (4 times in amonth).Raw materials to be kept properly in good condition and Deployment of skilled technician of work force to undertake routine daily /weekly / monthly periodical machine wise maintenance work strictly adhering to the maintenance guidilines of the manufacturer including other routine (daily / weekly /monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Deparmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 6 months | |||||||
| 3.01 | (i) Static Portion:- WTP areas (Dual Media, UF, RO, Ozanator etc. (ii) Motive Portion:- PET blowing machine, RFC, Labeling machine, shrink wrapping machine (iii) HP compressor with dryer, LP compressor with dryer, chiller tower, CW pump etc. including leakage test of entore pneumatic, conveying main including calibration of gauges. Miscellaneous Charges:- Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment / topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. | 12 | TIMES | 70,390 ₹8,44,680 | 70,416 ₹8,44,992 | 70,405 ₹8,44,860 | 70,380 ₹8,44,560 Lowest |
| 3.02 | Making arrangement for monthly preventive maintenance by manufacturer / parent company of a)PET Blowing Machine b) RFC Machine c) Labelling Machine d) Batch Coding Machine e) High pressure Compressor with Dryer f) Low pressure Compressor with Dryer g) Chiller h) Cooling Tower i) Shrink Wrapping machine j) Water Treatment Plant by deploying Service Enginner of the parent manufacturing company as per preventive maintenance schedule with all incidental charges for setting and resetting of different critical process related field instrumena alongwith replacement of spares of these plants . A seperate register for attaing monthly preventive maintenace by the parent manufacturing company is to be kept at site duly authenticated by the concerned Engineer-In -charge and should be submitted during preparation of bill. Deployment of Service Engineer of the parent company with all conveynance for setting, re-setting and calibration of the equipment upto the level of standard (i) Rinsing Filling cleaning machine (involving of 2 days) (ii) Labeling machine (involving of 2 days) (iii) PET blowing machine (involving of 2 days) (iv) High Pressure compressor (involving of 2 days) (v) Low Pressure compressor (involving of 2 days) (vi) Chiller (involving of 1 day) (vii) Cooling tower (involving of 1 day) (viii) Shrink Wrap Machine (involving of 1 day) (ix) Water Treatment plant (involving of 2 days) (x) Batch code machine (involving of 1 day) | 2 | NO | 3,80,650 ₹7,61,300 | 3,80,720 ₹7,61,440 | 3,80,700 ₹7,61,400 | 3,80,638 ₹7,61,276 Lowest |
| 4.00 | . Operation and maintenance of Laboratory attachment to bottling plant at Muluk including Engagement of Chemist, Bacteriologist and Lab Assistant for day to day test of water samples in the laboratory and maintaining proper database in the laboratory computer as per direction of EIC. | 12 | MONTHS | 69,250 ₹8,31,000 | 69,290 ₹8,31,480 | 69,270 ₹8,31,240 | 69,239 ₹8,30,868 Lowest |
| 5.00 | Add: GST @ 18% on sum of Item No: 1.00 to 4.00 | 1 | /Item | 8,79,188.4 ₹8,79,188.4 | 8,81,483.58 ₹8,81,483.58 | 8,80,009.2 ₹8,80,009.2 | 8,78,547.24 ₹8,78,547.24 Lowest |
| 6.00 | Add: Cess @1% on sum of Item No. 1.00 to 5.00 | 1 | /Item | 57,635.68 ₹57,635.68 | 57,786.15 ₹57,786.15 | 57,689.49 ₹57,689.49 | 57,593.65 ₹57,593.65 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
27 Jul 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, BOLPUR MECHANICAL DIVISION PHE
SRINIKETAN ROAD NEAR HOTEL MARK MEADOWS PO SRINIKETAN DIST BIRBHUM PIN 731236
Production of packaged drinking water from R.O.based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 500 Ml 1000 Ml capacity at Muluk Water Reservoir site of surface water based water supply scheme
2026_PHED_1031534_1
PHED/05/EE/BOLMD/26-27
Open Tender
MECHANICAL
Item Rate
365 days
MULUK, BOLPUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.2 L
31 Jul 2026
9 Jul 2026
29 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. PART-A (Labour Portion) Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 500 Ml / 1000 Ml capacity at Muluk Bottoling plant in the district of Birbhum, P.H.E. Dte. by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing filling capping machine (1 No.), labeling machine & batch code machine (1 No), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No). The Agency will provide sufficient man power for smooth operation of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant.( rate is including ESI &PF of existing rules) w.e.f 01/08/2026 to 31/07/2027 | 12 | MONTHS | 103 | ₹1,236 |
| 1.02 | Provision of Electrician for visit to oversee/Maintenance of all panel boards, luminaries system, compressor, D.G. sets, 315 KVA sub-station with transformer, H.T & L.T switch Gear equipment in sub-station, overall power circuit and electrical accessories and machineries | 365 | DAYS | 104 | ₹37,960 |
| 2.01 | Part-B (Supervision Portion) Skilled supervisor for supervision of entire installation once in a month for trouble free operation of Bottling plant and 315VKA sub-station with AVR, transformer etc. including manning, control, output data generation etc., enter inspection report in all log book and signed with inspection date. (4 times in a month) | 12 | MONTHS | 105 | ₹1,260 |
| 2.02 | Sweeping of garbage from bins of different area in side the plant, collecting from roads, intermediate path way, back side of the plant , cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, rooms to ensure highest level of hygenic condition inside the plant, cleaning of all grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc. as per direction of EIC. | 12 | MONTHS | 106 | ₹1,272 |
| 3Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc. to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade ( RFC & labelling machine ), FRL- 32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area (4 times in month). PET Blowing, RFC, Labelling, Batch coding & Shrink Wrapping Machine( 4 times in a month) and HP compressor with Dryer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc ( 4 times in a month) and pouch filling machines (4 times in amonth).Raw materials to be kept properly in good condition and Deployment of skilled technician of work force to undertake routine daily /weekly / monthly periodical machine wise maintenance work strictly adhering to the maintenance guidilines of the manufacturer including other routine (daily / weekly /monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Deparmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 6 months | |||||
| 3.01 | (i) Static Portion:- WTP areas (Dual Media, UF, RO, Ozanator etc. (ii) Motive Portion:- PET blowing machine, RFC, Labeling machine, shrink wrapping machine (iii) HP compressor with dryer, LP compressor with dryer, chiller tower, CW pump etc. including leakage test of entore pneumatic, conveying main including calibration of gauges. Miscellaneous Charges:- Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment / topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. | 12 | TIMES | 108 | ₹1,296 |
| 3.02 | Making arrangement for monthly preventive maintenance by manufacturer / parent company of a)PET Blowing Machine b) RFC Machine c) Labelling Machine d) Batch Coding Machine e) High pressure Compressor with Dryer f) Low pressure Compressor with Dryer g) Chiller h) Cooling Tower i) Shrink Wrapping machine j) Water Treatment Plant by deploying Service Enginner of the parent manufacturing company as per preventive maintenance schedule with all incidental charges for setting and resetting of different critical process related field instrumena alongwith replacement of spares of these plants . A seperate register for attaing monthly preventive maintenace by the parent manufacturing company is to be kept at site duly authenticated by the concerned Engineer-In -charge and should be submitted during preparation of bill. Deployment of Service Engineer of the parent company with all conveynance for setting, re-setting and calibration of the equipment upto the level of standard (i) Rinsing Filling cleaning machine (involving of 2 days) (ii) Labeling machine (involving of 2 days) (iii) PET blowing machine (involving of 2 days) (iv) High Pressure compressor (involving of 2 days) (v) Low Pressure compressor (involving of 2 days) (vi) Chiller (involving of 1 day) (vii) Cooling tower (involving of 1 day) (viii) Shrink Wrap Machine (involving of 1 day) (ix) Water Treatment plant (involving of 2 days) (x) Batch code machine (involving of 1 day) | 2 | NO | 109 | ₹218 |
| 4 | . Operation and maintenance of Laboratory attachment to bottling plant at Muluk including Engagement of Chemist, Bacteriologist and Lab Assistant for day to day test of water samples in the laboratory and maintaining proper database in the laboratory computer as per direction of EIC. | 12 | MONTHS | 110 | ₹1,320 |
| 5 | Add: GST @ 18% on sum of Item No: 1.00 to 4.00 | - | /Item | 102 | - |
| 6 | Add: Cess @1% on sum of Item No. 1.00 to 5.00 | - | /Item | 102 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.68 MB
Tendernotice_4.pdf
PDF • 0.20 MB
BOQ_2532966.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .